Introduction to Lean1 LSSG Green Belt Training Lean: An Introduction.

Slides:



Advertisements
Similar presentations
Bringing Sanity to Clinical Work Life Lean in Healthcare Michael Nelson, MD Blue Corn Professional Services, LLC.
Advertisements

The Principles Of Lean Repair Dr David J Horton Copyright© 2011 Beta Management Systems - All Rights Reserved.
*Lean Operations and the Toyota Production System C&T 10 *aka Just-in-Time or the Toyota Production System.
LeanSigma ® Facilitator Training Module 9 – Just in Time.
Supplier Development Kaizen Implementation Kit
JIT, TPS, and Lean Operations
Lean Systems Defined Just-in-time (JIT): an older name for lean systems Toyota Production System (TPS): another name for lean systems, specifically as.
Making your Portable Restroom business Lean and mean – How to boost productivity and increase your bottom line.
Just-In-Time and Lean Systems
Just-in-Time and Lean Systems
Stability & Standardization. 7 Types of Waste7 Types of Waste  Motion (Unnecessary movement)  Waiting  Transportation or conveyance  Storage (Excess.
Class 12: Chapter 8: Lean Systems Class 12 Agenda –Review Exam question challenges –Review Grade Sheet –Discuss Classroom Performance Process –Comments.
Just-In-Time “Eliminate Waste”.
1 Lean Thinking MGMT Lean Thinking A philosophy Principles Practices For the design, operation, management, control and continuous improvement.
CHAPTER 14 Just-In-Time Systems.
S12-1 Operations Management Just-in-Time and Lean Production Systems Chapter 16.
Benefits of Lean Manufacturing: To benefit from Lean Manufacturing, the processes must be maintained consistently and correctly. Everyone involved must.
Lean operations and JIT
Value Stream Mapping.
Implementation of Lean at Rheem Manufacturing Presenter Dr. Joan A. Burtner Associate Professor Industrial and Systems Engineering Mercer University School.
© ABSL Power Solutions 2007 © STM Quality Limited STM Quality Limited Introduction to Lean Manufacturing TOTAL QUALITY MANAGEMENT Lean Manufacturing.
Operations Management
JIT and Lean Operations
1 Chapter 16 Just-In-Time Systems. 2 JIT/Lean Production Just-in-time: Repetitive production system in which processing and movement of materials and.
JIT and Lean Operations
Copyright © 2014 McGraw-Hill Higher Education. All rights reserved. CHAPTER 8 Lean Systems McGraw-Hill/Irwin.
Intro to LSS1 LSSG Green Belt Training Introduction to Lean Six Sigma.
Chapter 7, Lean Thinking and Lean Systems
Visual Workplace - A Prerequisite To Becoming World Class
Just-in-Time (JIT) and Lean Systems Chapter 7. MGMT 326 Foundations of Operations Introduction Strategy Quality Assurance Facilities Planning & Control.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 15 JIT and Lean Operations.
Lean Production - Objectives
LEAN system.
JIT and Lean Operations
Introduction to lean philosophy
Dr. Joan Burtner1 Introduction to the Lean Enterprise as a Quality Improvement Initiative Presented By: Dr. Joan A. Burtner Industrial and Systems Engineering.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 15 JIT and Lean Operations.
Lean Manufacturing Chapter 15 pp June 29, 2012.
Lean is a business system that focuses on doing only those things that add value to the customer, creating continuous one piece flow, and placing a high.
McGraw-Hill/Irwin © 2003 The McGraw-Hill Companies, Inc., All Rights Reserved. 1 LEAN SYSTEMS TOOLS AND PROCEDURES.
Companies must provide customers with world-class quality, delivery and service. Customers won’t accept anything less. The globalization of markets means.
“Without the Cost of Waste …”
Slack, Chambers and Johnston, Operations Management 5 th Edition © Nigel Slack, Stuart Chambers, and Robert Johnston 2007 Chapter 15 Lean operations and.
Chapter 29 Waste Elimination. Objectives Select and apply techniques for eliminating or preventing waste. Pull systems, Kanban, 5S, standard work, & poka.
Just-in-Time and Lean Operations. Developments of JIT and Lean Operations 1960’s: Developed as Toyota Production System by Taiichi Ohno and his colleagues.
1 LSSG Green Belt Training Improve: How do we get there?
Session 5 Review A3 progress Error Proofing Visual Control Workplace organisation Standard Operating Procedures.
13-1 Learning Objectives  Explain what is meant by the term lean operations system.  List each of the goals of JIT and explain its importance.  List.
JIT and Lean Operations Group Members:. JIT/Lean Production Just-in-time (JIT): A highly coordinated processing system in which goods move through the.
Just-in-Time (JIT) and Lean Systems Chapter 7. Management 326 Operations and Operations Strategy Designing an Operations System Managing an Operations.
 Discussion 40 minutes  Break 10 minutes  Discussion 40 minutes  Will understand what Standard Work is, and is not  Will be able to study and understand.
Implementation of Lean at Rheem Manufacturing
LEAN system. Value That customer is willing to pay That changes products color, function, shape, other attributes so that the product is getting closer.
Standard Work (Sample Slides) Superfactory Manufacturing Excellence Series Lean Overview 5S & Visual Factory Cellular Manufacturing Jidoka Kaizen Poka.
McGraw-Hill/Irwin Copyright © 2010 by The McGraw-Hill Companies, Inc. All rights reserved. 15 JIT and Lean Operations.
Just In Time Manufacturing Push Manufacturing vs. Pull Manufacturing Push System: Traditional production system as parts are processed based on the master.
16-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 9 JIT and Lean Operations.
LEAN Basics for Offices January 13, WHAT IS “LEAN”? Maximize customer value while minimizing waste.
CHAPTER 9 Lean Manufacturing.
Chapter 12 Lean Production. Chapter 12 Lean Production.
Lean operations and JIT
McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved
Pull Manufacturing and Just In Time
Welcome to my presentation
Just-In-Time and Lean Production
Chap 10 Learning Objectives
MGS 4020 Business Intelligence LSS Jul 19, 2018
Implementation of Lean at Rheem Manufacturing
Lean Six Sigma Green Belt
Presentation transcript:

Introduction to Lean1 LSSG Green Belt Training Lean: An Introduction

Introduction to Lean2 What is Lean? LEAN - Like water running downstream - more speed with less effort! Elimination of Non- Value Add Activity Customer Pull Genuine Focus on the Customer Culture for Lean Lean Tools, Methods and Measures Kaizen Events JIT Delivery Increase Offering/Decrease Changeover Visual Management Continuous Flow

Intro to LSS3 The Four Rules of the Toyota Production System (TPS) 1. All work shall be highly specified 2. Direct customer-supplier connection 3. Visual Management 4. Use scientific method for improvement

Intro to LSS4 7 Types of Waste Sources of WasteExample Projects OverproductionJIT Production Waiting TimeTime Value-Add Improvement TransportationProcess Flow Improvement InventoryInventory Reduction MotionLayout Changes ProcessingPull Implementation Product DefectsQuality at the Source

Introduction to Lean5 Benefits of the 5S Philosophy: Can you think of a few? Seiri (Sort) Seiton (Straighten) Seiso (Shine) Shitsuke (Sustain) Seiketsu (Standardize) Discard unnecessary materials “When in doubt, throw it out.” Organize work area Draw current state map; “A place for everything, and everything in its place.” Clean the work area daily Establish procedures “The best cleaning is not to need any cleaning’ Implement best practices Empower employees Make workplace “talk to us” Monitor performance “The less self- discipline you need, the better” The 5S Philosophy

Introduction to Lean6 Value Stream Mapping High level delivery path (flowchart or process map) from customer request to delivery of product or service – includes materials, people, information

Introduction to Lean7 Capacity Planning: Bottlenecks, and The Importance of Continuous Flow Unbalanced Process: Capacity is limited by the slowest step (smallest output in time period!) Balanced Process: The output of one stage is the exact input requirement for the next stage! Stage 1Stage 2Stage 3 Units per month 7,000 Stage 1Stage 2Stage 3 8,0007,0006,000 Units per month Capacity = 6,000 units/month Capacity = 7,000 units/month

Introduction to Lean8 Takt Time The “pacemaker speed” or “rhythm” in a process Enables “continuous flow” and minimum inventory

Introduction to Lean9 Takt Time Example Shift (1)480 min Breaks (2) 30 min Daily 5S (1) 10 min Available Work Time/ Day 440 min Average Monthly Demand 8400 units # Days/Month21 days Daily Demand400 units Need to complete a unit every 66 sec to satisfy average customer demand Takt time is flow at the speed of customer demand.

Introduction to Lean10 Takt Time Exercise 20” 40” 60” 80” Takt Time=66” A B C D E Number of Operators 75“ 65” 40” 50” 10” What would you do?

Introduction to Lean11 Total Productive Maintenance (TPM) Minimum maintenance – quick response Prevention by employee teams Continuous improvement Planned Downtimes 5

Introduction to Lean12 Setup Reduction/Quick Changeover Single Minute Exchange of Dies (SMED) - Shigeo Shingo. Requires planning, staging, and storage areas to perform “internal activities” for changeovers Uses video to record the current process, followed by process improvement.

Introduction to Lean13 Pull vs. Batch Batch/Make to Stock Based on forecast Large batches = fewer setups For bottleneck items, larger batches are desirable. Smaller batches to reduce work-in-process (WIP) inventory Customer Supplier Manufa cturer Pull/Make to Order Match capacity to demand Create flexibility in service Cross-train employees Align policies and procedures with objectives

Introduction to Lean14 Kanban Systems The use of a signaling device (card, bell, switch, light) to notify the (internal or external) supplier that additional materials are needed – what is needed (SKU# and description), the quantity needed, and only when it is needed! Previous Sub- Process or Supplier Next Sub- Process

Introduction to Lean15 Ways to Prevent Errors (Poka-Yoke)

What’s wrong with this picture? Introduction to Lean16 Faculty break room at GSU’s Alpharetta Center Photo by Satish Nargundkar

Introduction to Lean17 Process for Mistake Proofing Describe Defect and Defect Rate Determine Defect Location Study the Process Flow Observe the Process Identify Errors and Determine Cause Determine Prevention Method Test/Re-test in Extreme Conditions

Introduction to Lean18 Facility Layout Recommended configuration: U-shaped Why? Other Configurations Z if obstacles; T if merged assembly Tool: The Spaghetti Chart Also called Layout Diagram or Physical Process Map 3

Introduction to Lean19 Group (Cellular) Technology Departmental specialization causes wasted motion! A AA BBB DD EE E C

Introduction to Lean20 Group (Cellular) Technology Combine equipment used, steps taken, distances traveled, and frequency of trips to determine ideal cell configurations. A AA BBB DD EE E C Spaghetti Chart

Introduction to Lean21 Group Technology A B D B E E C A B D B Establishing cells reduces movement

Introduction to Lean22 Lean Improve Activities Plan for and conduct a week long Kaizen event Learn by doing, and doing it again Repeat Kaizen’s for key processes The Lean Transformation Fight Fires React Improve Processes time “Each new improvement reveals new problems!” Freddy Ballé

Introduction to Lean23 Kaizen Events “Improve” process for Lean, 3-5 day event Cross-functional teams Project completion in 30 days Support from management “Walk” the process Share “peak” experiences Make quick changes 2

Introduction to Lean24 Standardization and Documentation What are the reasons for standardizing? Steps necessary to create SOPs: Answer the following regarding tasks: Why is it being done? How often? Who will do it? How will it be done? corrective actions if the task is performed incorrectly who is responsible timing for updates and revisions

Introduction to Lean25 Lean Metrics Lead time reduction Objective: at least 50% of industry average Inventory turn reduction 52 turns per year = 1 week total lead time Objective: greater than 2X per month Productivity Objective: increase at least 1% Growth Objective: at least 3X industry average