CLIC Breakdown Workshop – CERN, May 2008 1 / 13 Delay Times in Breakdown Triggering CERN, TS-MME Antoine Descoeudres, Sergio Calatroni, Mauro Taborelli.

Slides:



Advertisements
Similar presentations
Unit 3 Day 11: RC Circuits RC Circuit Introduction RC Circuit Analysis
Advertisements

ECE201 Lect-231 Transient PSpice Analysis (7.4) Dr. Holbert April 26, 2006.
1 Chapter 24--Examples. 2 Problem In the figure to the left, a potential difference of 20 V is applied across points a and b. a) What is charge on each.
24/05/2010Rui De Oliveira1 Resistive protections for Bulk Micromegas Rui de oliveira, Joerg Wotschack Venetios Polychronakos.
High Voltage Laboratory Department of Electrical Engineering, Indian Institute of Technology, Kharagpur.
Concept Design Review (CoDR) Shore Station DC Breaker Cable model Transient Analysis Components.
Structure Preparation Techniques and New Materials DC breakdown testing –Test of new materials –Test of in situ and ex-situ heating, plasma treatments,
EE 4BD4 Lecture 25 Electrosurgery Biomedical Device Technology: Principles and Design, Charles C. Thomas Publisher 2007 Anthony K. Chan 1.
Field Emission Measurements with CERN DC-Spark System Tomoko MURANAKA Hebrew University / CERN.
Dielectric Materials for Advanced Applications Progress Report (Oct – Feb. 2011) Xuewei Zhang and Prof. Markus Zahn Massachusetts Institute of Technology.
Experimental breakdown studies – breakdown diagnostics Linking simulation and experiment Jan W. Kovermann, CERN, RWTH Aachen SLAC workshop July 2009.
UNIT 4 : MEASUREMENT OF VERY HIGH VOLTAGES AND CURRENTS
High Gradient and High Q R&D Topics 1- Explore Q > for TESLA parameter flexibility –higher luminosity through higher rep rate, longer rf pulse… 2-
ECE 201 Circuit Theory I1 Natural Response of an RC Circuit.
RC Circuit Experiment 1. Set up three different RC circuits using the components supplied. 2. Measure the voltage across the capacitor as a function of.
(You may use the book and/or notes) 1.Find C T 2. Using V C = V S (1 - e -t/  ), what is the voltage across a capacitor at 10 seconds if R = 5Ω, C=2F,
Samuli Heikkinen CLIC Workshop October 2007 a short summary of the doctoral thesis on the CLIC fatigue study.
Engineering Science EAB_S_127 Electricity Chapter 4.
FID Based Pulse Generators for Accelerator Applications Vladimir M. Efanov FID GmbH, 25 Werkstrasse, Burbach, D-57299, Germany 2006.
DC breakdown measurements Sergio Calatroni Present team: Jan Kovermann, Chiara Pasquino, Rocio Santiago Kern, Helga Timko, Mauro Taborelli, Walter Wuensch.
DC breakdown experiments M.Taborelli, S.Calatroni, A.Descoeudres, Y.Levinsen, J.Kovermann, W.Wuensch CERN Ranking of materials Cathode mechanism Field.
DC breakdown measurements Sergio Calatroni Present team: Gonzalo Arnau Izquierdo, Jan Kovermann, Chiara Pasquino, Rocio Santiago Kern, Helga Timko, Mauro.
26 January 07 Trond Ramsvik TS / MME DC Spark Test System for CLIC.
Circuit Lab. Experiment-4 Measurement of Time Constant, Rise Time, Step Response of a RC Circuit.
CERN DC Spark System Capabilities Anders Korsbäck, BE-RF-LRF University of Helsinki.
Accelerating structure test results and what’s next Walter Wuensch CTF3 collaboration meeting
Vacuum Spark Ion Source: High Charge States Ion Beam E.M. Oks, G.Yu. Yushkov, A.G. Nikolaev, and V.P. Frolova High Current Electronics Institute, Siberian.
Statistical analysis of RF conditioning and breakdowns Jorge GINER NAVARRO CLIC Workshop /01/2015 J. Giner Navarro - CLIC WS20151.
Spectroscopy of breakdowns Breakdown physics workshop J.Kovermann
RC Circuits. We can use a resistor to slow the charging of the capacitor. -Current now varies with time. -In the very short term, you can treat the capacitor.
In-Class Problems 1.Sketch the following functions: a) x(t) = 3sin(40  t) for 0≤ t ≤ 0.2 sec b) z(t) = 10e -4t for 0≤ t ≤0.5 sec 2.What is ? 3.What is.
CLIC Workshop – CERN, October / 17 DC breakdown experiments for CLIC CERN, TS-MME Antoine Descoeudres, Trond Ramsvik, Sergio Calatroni, Mauro Taborelli.
Power Supply System for DRFS
Team meeting Sparks in EDM 1 / 36 All about sparks in EDM Centre de Recherches en Physique des Plasmas (CRPP), Ecole Polytechnique Fédérale de.
Comparative studies of high- gradient rf and dc breakdowns CLIC talk Jan W. Kovermann
The Adventures of Sparky LeCroy TK Hemmick for the Stony Brook Crew and Maxim.
1 An investigation into the breakdown mechanisms of a triggered water gap switch Mohsen Saniei Institute for Energy and Environment University of Strathclyde.
Kévin Pepitone 1CLIC project meeting, CERN, December 1st, 2015 Kevin PEPITONE, BE-RF Drive Beam Injector Gun.
Experimental investigation and nanosecond imaging of streamers T.M.P. Briels, E.M. van Veldhuizen, U. Ebert Workshop Leiden, 9-13 May 2005.
Progress and Plans on Warm Cavity Technology Sergio Calatroni – CERN On behalf of the CLIC Structures Team.
1 Al Moretti, APC, Fermilab MAP- Winter Meeting February 28 - March 4, 2011 TJNAF Newport News, VA.
The CLIC accelerating structure development program Walter Wuensch CARE05 23 November 2005.
DC Spark Developments Nick Shipman - Thursday, 16 August
Electric Circuits Voltage Measurement. Current Measurement.
DC Spark Test System for CLIC
Electron Stimulated Desorption of OFE Copper Chiara Pasquino, Politecnico di Milano 9th March 2011, RF Structure Meeting.
CLIC workshop 2015 EXTRACTION KICKER STRIPLINE MEASUREMENTS C. Belver-Aguilar (IFIC) On behalf of: A. Faus-Golfe (IFIC), F. Toral (CIEMAT), M.J. Barnes.
Review (Only leave this in if it makes sense) Get white boards out for all this lecture) How long does it take a 5uF capacitor in a series RC circuit to.
NEXT EXCELLENCE IN SOLID STATE PULSED POWER BY SCANDINOVA SYSTEMS AB Klas Elmquist.
7. Direct Current circuits. 11 Find the currents, which flow in all the wires of the circuit in this figure 12  9 V 6 V b a cd 18 
Pre-breakdown and Breakdown Phenomena on Contacts in Vacuum Interrupters From Edgar Dullni’s Presentation ABB Group.
RC Circuits.
High-gradient rf constraints W. Wuensch X-band workshop
Impedance is the measure of the opposition that a circuit presents to the passage of a current when a voltage is applied. In quantitative terms, it is.
Kévin Pepitone 1CLIC workshop, CERN, January 2016 Kevin PEPITONE, BE-RF LEETCHI: Drive Beam Electron Source.
Chapter 3 – Diode Circuits – Part 3
J. Ardila, R. Albarracín, J.M. Martínez-Tarifa, G. Robles.
ADVANCED WATER LEVEL CONTROLLER
Outgassing studies DC Spark Corrected calibration Mo and Cu data with same calibration data and same experimental environment Field emission measurements.
Electrostatic deflector development at RWTH Aachen
Alternating Current Module
A study of the effect of salinity on pulsed arc discharge in water
Pulsed DC System Facilities
Consider the function in which E, R, and C are known constants
Capacitor Action Topics covered in this presentation: Capacitors on DC
Schematic diagram of part of a house wiring system
Constant current charging circuit for power pulsing
1) Schematic diagram of part of a house wiring system
Electromechanical Systems
Natural Response of an RC Circuit
Presentation transcript:

CLIC Breakdown Workshop – CERN, May / 13 Delay Times in Breakdown Triggering CERN, TS-MME Antoine Descoeudres, Sergio Calatroni, Mauro Taborelli CLIC Breakdown Workshop May 2008

CLIC Breakdown Workshop – CERN, May / 13 Time matters Study of delays can give information about the breakdown mechanism t 0 : high voltage is applied between the electrodes no spark… spark ! t > t 0 : Q: how long ?

CLIC Breakdown Workshop – CERN, May / 13 DC spark : experimental set-up V 1) 2) power supply (up to 12 kV) 28 nF UHV V HV probe Charged capacitor connected to the electrodes during 2 sec, through a high current mechanical relay Voltage and current measured with probes, connected to a scope  HV probe : 20kV, 75MHz, 1:1000, 100M   current transformer : 500MHz, 1kA peak  scope : 1GHz to scope current probe

CLIC Breakdown Workshop – CERN, May / 13 DC spark : experimental set-up NB: slow discharge of the capacitor during the voltage ‘pulse’ due to finite resistance of HV probe (RC circuit) V i 100 M  28 nF resulting ‘pulse’ : circuit time constant :  = RC = 2.8 sec

CLIC Breakdown Workshop – CERN, May / 13 DC spark : experimental set-up The moving part of the mechanical relay is bouncing sometimes (loss of contact) …but voltage pulse is ‘flat’ over at least 5 ms (and 5 ms = max. delay observed)

CLIC Breakdown Workshop – CERN, May / 13 Timing diagram of a spark Schematic evolution of the voltage and current across the electrode gap t V I ??? HV relay is closed rising time ~ 100 ns spark ~ 2  s delay (< 5 ms)

CLIC Breakdown Workshop – CERN, May / 13 Example of a spark delay

CLIC Breakdown Workshop – CERN, May / 13 Delay times with Mo electrodes Histogram of delays population #2 ‘delayed’ brkds average : 1.17 ms (  = 0.33 ms) 2 populations, separated by a gap (1 – 100  s) Two different breakdown mechanisms ? population #1 ‘immediate’ brkds average : 129 ns (  = 16 ns) voltage rising time: ~ 100 ns

CLIC Breakdown Workshop – CERN, May / 13 Delay times with Mo electrodes Delays during conditioning Delays after conditioning 82% immediate brkds dominate during conditioning delayed brkds dominate after conditioning 24% percentage of delays < 200 ns : gap

CLIC Breakdown Workshop – CERN, May / 13 Delay times with stainless steel electrodes Conditioning Same tendency both populations observed at every field, but  immediate breakdowns dominate during conditioning  delayed breakdowns dominate after conditioning ??? pop. #2: delays increase linearly with breakdown field ???

CLIC Breakdown Workshop – CERN, May / 13 Delay times with copper electrodes Cu : ‘immediate’ conditioning, lower breakdown field Large majority of immediate breakdowns average : 163 ns (  = 44 ns)

CLIC Breakdown Workshop – CERN, May / 13 Delay times with different materials CuTaMoSS R = fraction of delayed breakdowns (excluding conditioning phase) R = 0.07R = 0.29R = 0.76R = 0.83 R increases with average breakdown field E b = 170 MV/mE b = 300 MV/mE b = 430 MV/mE b = 900 MV/m

CLIC Breakdown Workshop – CERN, May / 13 Summary Two populations of delays observed :  immediate breakdowns (average ~ 120 ns)  delayed breakdowns (from 0.1 to 5 ms, average ~ 1.3 ms) Both populations observed at every field  during conditioning mostly immediate brkds  after conditioning mostly delayed brkds  delays ~ breakdown field? (SS) Two different breakdown mechanisms?  immediate: associated with surface contamination? gas desorption?  delayed: once the surface is cleaned? Repartition of delayed / immediate breakdowns  depends on the material  the ratio of delayed brkds R increases with the average breakdown field of the material Next : in BDR mode ideas are welcome!

CLIC Breakdown Workshop – CERN, May / 13 Thank you !