MuTr Recap Status and Plan. Plan We are shooting for North Station-1 for post Run10 shutdown installation. Best scenario is to mount portable “clamp”

Slides:



Advertisements
Similar presentations
Manchester 09/sept/2008A.Falou & P.Cornebise {LAL-Orsay}1 CALICE Meeting/ Manchester Sept 2008 SLAB Integration & Thermal Measurements.
Advertisements

Recap Clamp 1008 and Production RIKEN/RBRC Itaru Nakagawa 1.
ROTHENBUHLER ENGINEERING
HPK FPIX & BPIX sensor research summary at Purdue E. Alagoz 1, M. Bubna 1, A. Krzywda 1, K. Arndt 1, D. Bortoletto 1, I. Shipsey 1, G. Bolla 1, S. Kwan.
MuTr Recapacitation RIKEN/RBRC Itaru Nakagawa 中川格 1.
Status of the LARP Phase II Secondary Collimator Prototype 30 September 2013 LHC Collimation WG Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US.
Recap Clamp Production and Installation RIKEN/RBRC Itaru Nakagawa 1.
Walls crates cables gas chambers electronics CERN adb.
Status of the LARP Phase II Secondary Collimator Prototype 14 October 2013 LHC Collimation WG Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC.
Bicycle Mechanics and Repair Decal Mechanical Engineering 98/198 Spring 14 Lecture 3 – staaaahp it.
Facility Upgrade Status at SSL, UCB Small Prototype Systems – 33mm Demountable Detector Body Parts arrived, cleaned. – 33mm Demountable Detector Test Flange.
Heated Lavage Joe McFerron, Justin Miller, and Ashley Danicic Dr. Dinakar Golla, M.D Linda Huckenstein, R.N.
Chiho Wang ATLAS TRT Duke University Dubna, May Fuse Box Production Chiho Wang/Jack Fowler.
CVD PCB, first steps. 15 mm 25 mm Chip area. No ground plane underneath the chip. Bulk isolated => only one ground line Power lines Connector: 11,1mm*2,1mm:
PHENIX WEEKLY PLANNING 5/17/2007 Don Lynch. 5/17/2007 Weekly Planning Meeting 2.
November 18, 2008 John Haggerty 1 PHENIX In Run 9 John Haggerty Brookhaven National Laboratory.
PHENIX WEEKLY PLANNING 2/21/2008 Don Lynch. 2/21/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
MuTR/MuTrig Readiness for Run13 Itaru Nakagawa on Behalf of MuTrig/MuTr Group 1.
May 2001, Istanbul Workshop High Voltage Plates and Capacitor Status Jack Fowler.
DOE Rev of Run IIb Sep 24-26, Detector Production WBS James Fast Fermilab.
PHENIX WEEKLY PLANNING 3/8/2007 Don Lynch. 3/8/207 Weekly Planning Meeting 2 Schedule Cosmic Ray Run (Run 6.9) Continues…. All Up Commissioning In Progress.
1 MuTRG-FEE Upgrade Status RIKEN/RBRC Itaru Nakagawa.
Technical Support /4/08 PHENIX WEEKLY PLANNING 9/4/2008 Don Lynch.
16/04/20031PNPI / LHCb Muon EDR Wire Pad Chambers PNPI design for regions R4 in Stations M2,M3,M4  4 gas gaps of 5mm±70µm;  Active area: 1224x252.8 mm².
PHENIX WEEKLY PLANNING 2/14/2008 Don Lynch. 1/31/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
1 HBD update Itzhak Tserruya DC Upgrades meeting, January 14, 2005 NIM paper II: Generic R&D ~ completed Full scale prototype construction Pending issues.
Introduction to High Momentum Trigger in PHENIX Muon Arms RIKEN/RBRC Itaru Nakagawa 中川格 1.
Spare Parts List (not to scale)
PHENIX WEEKLY PLANNING 10/11/2007 Don Lynch. 10/11/2007 Weekly Planning Meeting2 Run 8 Prep Schedule ItemStartFinish MPC South InstallationDoneDone Elec.
M. Brooks DC Meeting, 15-Sep-00 MuTr Mechanics Status SOUTH ARM: Chambers fabrication complete Stations 2+3 installed Station 1 test-installed will be.
1 South Arm Installation Plan Itaru Nakagawa RIKEN/RBRC.
10/18/20121 PHENIX WEEKLY PLANNING 10/18/12 Don Lynch.
Production Readiness Review at PNPI Chamber assembling: Main production and quality control steps 30 January 2004 – G.Alkhazov 1.Input components control.
PHENIX WEEKLY PLANNING 3/22/2007 Don Lynch. 3/22/2007 Weekly Planning Meeting 2 Schedule Re-Start 5 man shifts 3/20/07 Beam: blue ring 3/8/07, in yellow.
PHENIX WEEKLY PLANNING 1/10/2008 Don Lynch. 1/10/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn Going1/18 Gas.
Muon Tracker Responsibilities This Year South arm commissioning through this year’s run Analysis Software oversight and development North Arm station 2.
Muon Meeting April 2004JsG Status of Chambers Production at CERN Jean-Sebastien Graulich o Open Questions from the PRR O-ring Aging, Aging tests, Storage.
PHENIX WEEKLY PLANNING 12/6/2007 Don Lynch. 12/6/2007 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn GoingOn Going.
PHENIX WEEKLY PLANNING 10/4/2007 Don Lynch. 10/4/2007 Weekly Planning Meeting 2007 PHENIX Shutdown October 2007: Finish MPC South Installation, replace.
EMAS Stirling Cooler Operations Feb 24, 2011 Mike Watson.
1 Onsite Status Itaru Nakagawa RIKEN/RBRC. 2 Schedule.
10/7/2003Thomas Schneider1 Status report of CERN/PNPI Tooling support for PNPI M2R2 Prototype Plans towards the PRR.
Quality Control QC is taken very serious QC Document for Tube Production QC Document for Module Assembly QC Document for Installation.
10/2/2002MJL - MuTr DC Report Muon Tracking Status South North.
PHENIX WEEKLY PLANNING 11/15/2007 Don Lynch. 11/8/2007 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn Going11/30.
Recap Clamp for MuTr Station-3 Itaru Nakagawa For the PHENIX Muon Trigger Upgrade Collaboration Especially credit to: Tsutomu Mibe (KEK) Yoshinori Fukao.
PHENIX WEEKLY PLANNING 12/27/2007 Don Lynch. 12/27/2007 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn GoingOn Going.
PHENIX WEEKLY PLANNING 3/15/2007 Don Lynch. 3/15/2007 Weekly Planning Meeting 2 Schedule Cosmic Ray Run (Run 6.9) Done All Up Commissioning On Going Re-Start.
Onsite Status RIKEN/RBRC Itaru Nakagawa. OASys Light Source Spacer.
PHENIX WEEKLY PLANNING 1/24/2008 Don Lynch. 1/17/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going Switch.
PHENIX WEEKLY PLANNING 6/28/2007 Don Lynch. 6/14/2007 Weekly Planning Meeting 2007 Summer Shutdown Schedule ItemStartComplete RPC Factory set up5/ ?
Recap Clamp Installation RIKEN/RBRC Itaru Nakagawa 1.
PHENIX WEEKLY PLANNING 1/31/2008 Don Lynch. 1/31/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going Switch.
MuTrig-FEE Install Status RIKEN/RBRC Itaru Nakagawa 1.
Chiho Wang ATLAS TRT Duke University CERN, Feb Fuse Box & Capacitor Status Chiho Wang Duke University.
1 Installation Status Remaining Issues RIKEN/RBRC Itaru Nakagawa.
PPAC production and status Kwangbok Lee Low Energy Nuclear Science team Rare Isotope Science Project Institute for Basic Science July 11,
Sanding is used to remove small amounts of material from surfaces, and to make them smoother.surfaces.
Study of polarized sea quark distributions in polarized pp collisions at sqrt(s)=500GeV with PHENIX Oct. 10, 2008 Tsutomu Mibe (KEK) for the PHENIX collaboration.
Origami and Cooling 24th September 2012 C. Irmler (HEPHY Vienna) Joint PXD and SVD Meeting Göttingen.
1 2/19/2009 PHENIX WEEKLY PLANNING 2/19/2009 Don Lynch.
PHENIX WEEKLY PLANNING 2/14/2008 Don Lynch. 2/14/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
Onsite Work Summary RIKEN/RBRC Itaru NAKAGAWA. Completed Re-capacitation St-1, Gap-1 N&S Completed St-2 Terminators Install to South Oct.5 (except for.
Radiation Shutter Re-Purposing Roy Preece STFC RAL 18 th December 2014.
Some proposals on HV circuits realization for segmented straw detector
Equipment for Assembly – UK Experiences
Sander safety.
BaBar IFR Upgrade Mark Convery SLAC 7 Jun 06.
Seyoung Han / Ewha Woman’s Univeristy
Limited Streamer Tube Project Summary
Presentation transcript:

MuTr Recap Status and Plan

Plan We are shooting for North Station-1 for post Run10 shutdown installation. Best scenario is to mount portable “clamp” type re-capacitation board without soldering, without taking out Station-1 chamber. Prototype re-capacitation boards are tested in RIKEN.

Recap Board Prototype I

Recap Board Prototype Test Measured Electrical Contact of between probe and pad after disassembly/re-assembly of recap boards – About 50% of probes lost contact. Problem: – Individual probe doesn’t have flexibility to absorb unique surface structure of pad probe pad Capacitor board

Improvement for Prototype II Let individual probe have flexible freedom to adjust elevation so that it can absorb surface structure (remaining solder on pad). – Rubber pad – Spring probe (Current limit < 0.2A to prevent from burning spring) – Comb shape capacitor board Let capacitor board have more power to push probe – Thicker G10 – Angled G10 Prototype IPrototype II Spring probe

Conductive Silicon Rubber Pad About 30m  for 2mm thickness probe pad Conductive Rubber 2~3mm thick ~10m  for our probe size

Conformal Coating and Remover Conformal coating Removed coating Conformal coating can be removed by “remover”. Removed coating need to be suck up.

Schedule Prototype I Prototy pe II HV test mounting production shipping Install HV test Production cost : ~ $50k / Station-1 / Arm

Installation Scenario If “clamp” works: – Need Station-1 Scaffold – 1 hour coating removal / octant / man – 2 hours clamp install / gap / octant /man – 1 hour HV test / gap / octant /man – 1 octant/day/2men – 2 weeks + 1 week contingency = 3 total weeks If Station-1 need to be taken out: – 2 ~ 3 months