EWB-MAP Water Tank Project Construction Progress June 5-12, 2012.

Slides:



Advertisements
Similar presentations
Las Delicias, El Salvador Water Supply Project Current Project Status, January 2010 Richard Cairncross & David Haussler.
Advertisements

Las Delicias, El Salvador Water Supply Project Implementation Proposal Phase I Trip Dates: May 2012 Presented to TAC: March 6, 2012.
ROTARY CLUB Of SARATOGA Rotary International - San Jose Water Company Thailand Water Project Roy Russell, Rotary International and Bill Tuttle, SJWC.
Your Week A record of activity and [WHAT YOU ARE TRYING TO CAPTURE] Prepared by the [YOUR TEAM] team. Instructions 1. Use this diary to record your activities.
MASTER AGREEMENT TRAINING – ARTICLE 5 UNION RIGHTS and REPRESENTATION CBT LESSON 2 OFFICIAL TIME and TRAVEL Release procedures.
4/26/2006 – Nicaragua, Matagalpa: Elder Hogar Improvement Project Team: Nick Carey, Gita Dombrowski, Jeremiah Hess, Chris Lastomirsky Engineers Without.
100 women…one goal. Understanding the Grant Process.
Kindred North Motton Irrigation Scheme Landholder water sale 2 February 2012.
ECE 4334: Capstone Design Fall 2009 Welcome ! Facilitator: Dr. Len Trombetta.
TUESDAY, SEPTEMBER 9, 2014 Committee Chair Meeting Thank you for your time and commitment to serving our Doss students, staff, and school!
Problem of the Week! Max was in charge of getting the equipment for the 14 people on his baseball team. He made sure he had 8 bats and 38 baseballs. He.
BS9990 : 2015 Updates and/or Changes
Energy Savings from Supplying Drinking Water at Two Pressure Levels - a Retrofit in Las Delicias, El Salvador, EWB-MAP Presented by Adam A. Brostow November.
GIS Helps Americus Respond to Tornado March 1, 2007.
CFC RED STAR TRY OUT DATES Academy Evaluation 29 May -1 June (Upper Fields) Girls: Tuesday, Wednesday, Thursday Rising U9/10/U11/U12: 6:00 –
AIMS Orientation Session AETD Advanced Degree Program (ADP)
Material Management. Materials should be ordered early –Minimize risk of price inflation, lack of materials –Just in time delivery minimizes space required.
Cornerstone Engineering Group The Foundation for Your Civil Engineering Needs Camanche Reservoir Water Treatment Plant Project Cecilia Zamora Evangelina.
Saturday May 02 PST 4 PM. Saturday May 02 PST 10:00 PM.
WF SEM II 4.03 Apply quality assurances to enhance product/service offerings. Assess “product” readiness for sport/event (PM:146)
Monroe L. Weber-Shirk S chool of Civil and Environmental Engineering WFP Slideshow Photos from Water For People Projects Courtesy of Jody Camp Photos from.
Energy Savings from Supplying Drinking Water at Two Pressure Levels - a Retrofit in Las Delicias, El Salvador, EWB-MAP.
Engineers Without Borders Princeton University Amanda Li ‘16, Corrie Kavanaugh ‘17, Hana Ku ‘17, Josh Umanky-Castro ‘17, Kasturi Shah ‘16, William Guiracoche.
Las Delicias, El Salvador Water Supply Project Current Project Status, January 2010 Richard Cairncross & David Haussler.
Las Delicias Water Project: Piping System Design EWB-MAP Compiled by: Richard Cairncross Date 1/12/2012 Updated: 2/12/2012.
{ Club Funding Please Sign In. Workshop Topics Eligibility for Funding Club Funding Procedures Requesting Club “6” Account Funds Requesting Co-Curricular.
Las Delicias Water Project: Piping System Design EWB-MAP Compiled by: Richard Cairncross Date 1/12/2012 Update: 2/2/2012.
Las Delicias, El Salvador Water Supply Project Implementation Proposal Phase I Trip Dates: May 2012 Presented to TAC: March 7, 2012.
Las Delicias Water Project: Piping System Design EWB-MAP Compiled by: Richard Cairncross Date 1/12/2011.
The Middle – Essex Softball League is the largest softball league in all of New England. In 2012 we featured over 200 teams across seven divisions. Visit.
1 CTC 450 Review Water Quality Water Quality. 2 CTC 450 Water Distribution Systems Water Distribution Systems.
Lec.16 Underground pipeline irrigation system - structures for underground pipelines.
Project Location: El Chaguite, Yoro District, Honduras Northeastern University’s Student Chapter 1Project: El Chaguite Water System.
Water Engineers for the Americas Sampling of Completed WEFTA Projects WEFTA.
Water for Life Project Apatut, La Union, Philippines
 HR Updates  Procurement  Travel Updates.  Employees should for all general HR requests. Paper submissions should be submitted.
Engineers Without Borders-USA 2009 Midwest Workshop.
11 District of Columbia Water and Sewer Authority George S. Hawkins, General Manager September 16, 2013 Bloomingdale Civic Association Briefing for: Northeast.
Monday, September 14, LATE BUS The late bus is available Tuesday and Wednesday afternoons. For more info please contact any Administrator or the.
Thursday, September 17, LATE BUS The late bus is available Tuesday and Wednesday afternoons. For more info please contact any Administrator or.
Thursday, September 10, LATE BUS The late bus is available Tuesday and Wednesday afternoons. For more info please contact any Administrator or.
5.1.9 Student Book © 2005 Propane Education & Research CouncilPage Installing Propane Dispensers Successful propane dispenser installations are.
Las Delicias Water Supply System OPERATION AND MAINTENANCE MANUAL 1.
Engineers Without Borders-USA Mid-Atlantic Professionals Chapter Water for Life Project Apatut, La Union, Philippines Amanda Jacobs Project Lead.
Changes to the Hours of Service Regulations For Truck Drivers Rob Abbott Vice-President of Safety Policy American Trucking Associations.
SHDH Perimeter Radiation Improvements Town Hall Meeting – June 23, 2015.
Las Delicias, El Salvador Water Supply Project Implementation Proposal Phase I Trip Dates: May 2012 Presented to TAC: March 7, 2012.
BLACKSPRING RIDGE PROJECT UPDATE Liaison Committee Presentation July 14th, 2014.
MySocietyClub.com Comprehensive Online Housing Society Management Portal.
Department of Materials University of Oxford TEAM DESIGN PROJECTS BRIEFING FOR ALL TEAMS Adrian Taylor.
Grant Management Seminar Session 3 1 Session 3 Oversight and Reporting 10/13/2012.
WORK REPORT APRIL / JUNE 2013 MONTEREY CHURCH OF CHRIST Presented by: Manuel Azucena and family El Salvador, Central America, Mission Team
1 04/30/2003 ECE 554 COUNTDOWN DEMONSTRATION  Scheduling  Miscellaneous  Content FINAL REPORT  Check-In  Content FEEDBACK.
In this presentation will be presented the many resources available to the students at Salt Lake Community College.
Stacy Hagenbucher.  Process Improvements  Clarification  Trends  Finals Tracking  Trends  Why Missing Dates  Additional Resource  Issues on sites.
ROTARY GLOBAL/DUNN SCHOLARSHIP IMPLEMENTATION SCHEDULE AND PROCEDURE FOR D Using the flyer E. & W. Hartford clubs advertise/spread the word in their.
Schools Finance October  Secure online payment facility hosted by Westpac  Accessed from the home page of the school’s website  $Make a payment.
Expense Report Total Miles MONDAY 5 5 TUESDAY WEDNESDAY 6 6 THURSDAY FRIDAY SATURDAY 0 SUNDAY0 TOTAL 23.
2015 Eastern Oregon Region AWWA/PNCWA Operator’s Conference Water Project of the Year City of Stanfield’s Water System Improvements.
Rural Water Projects in Guatemala Water for the Americas Agua para las Américas.
Pressure and Flow Analysis Through EPANET Open source software package for hydraulic simulation of water distribution networks Used to determine impact.
Town of East Greenbush Waste Water Treatment Plant Project Monthly Update – September 2014.
1 Eagle P3 Project Update FasTracks Monitoring Committee May 12, 2015.
Travel or Conference Training Sponsored by Classified Senate.
WELCOME TO GENESEO HILLS ANNUAL MEETING OCTOBER 21, 2010.
Approve Change Order No. 4 for the Caylor Wholesale Meter Modification Item 4B.
RESIDENTIAL PLUMBING SYSTEMS (WATER SUPPLY)
Pinole-Hercules Water Pollution Control Plant Upgrade Project
1/22-1/25 Our plan and play for next week will be:
Research Phase, Indiana 811, Initial Notice, Verification
Presentation transcript:

EWB-MAP Water Tank Project Construction Progress June 5-12, 2012

Map of Las Delicias Water System DOWNHILL

260 Homes Served by Tanque 3 33 Homes Served by Tanque Homes Served by Tanque 1 DOWNHILL Map of current Las Delicias Water System from ADESCO with approx house locations indicated

117 Homes Served by Tanque 3 33 Homes Served by Tanque Homes Served by Tanque 1 Proposed Water Distribution System 280 Homes Served by New Tank DOWNHILL

Map of Current Water System (section relevant for EWB-MAP modifications) RED lines – supply lines to tank (uphill by pump) BLUE lines – distributions lines by gravity DOWNHILL New 17,000 gallon tank Exisiting 11,000 gallon tank

Proposed update to Water System (section relevant for EWB-MAP modifications) RED lines – supply lines to tank (uphill by pump) BLUE lines – distributions lines by gravity NEW SUPPLY LINE 1 NEW DISTRIBUTION LINE 2c NEW DISTRIBUTION LINE 2a NEW DISTRIBUTION LINE 2b NEW TANK A B C D E F DOWNHILL 1.Tank Construction 2.Pipe connections 3.Pipeline Plans 4.Distribution of Work

DAY 1 – June 5, 2012

Photos

Day 2 – Wednesday June 6, 9 AM

Day 2 – 3 PM

Daniel Rivera (Engineer from Rotary) Miguel Delgado (driver/handyman) from FIAT) Miguel Martinez (Supervisor) Holman (driver from FIAT) Sergio (LD ADESCO member) Mario (LD resident)

Day 3 – Thursday June 7, 9 AM

Day 4 – Friday June 10, 11 AM

Day 5 – Saturday June 9, noon

Day 6 – June 11: noon

Day 7 – June 12 noon

Day 7 – 4 PM – ‘mesita’ complete

Schedule for Completion of Tank 1.Wed June 13: start laying rocks/sand for base of foundation 2.Thur June 14: continue laying rocks/sand for base of foundation 3.Fri June 15 – Tue June 19: cut/tie rebar and prepare form for foundation 4.Wed June 20: pour foundation 5.Rain could delay these tasks

Photos

Ordered tubing and fittings from local supply store in San Salvador

Proposed update to Water System (section relevant for EWB-MAP modifications) RED lines – supply lines to tank (uphill by pump) BLUE lines – distributions lines by gravity NEW SUPPLY LINE 1 NEW DISTRIBUTION LINE 2c NEW DISTRIBUTION LINE 2a NEW DISTRIBUTION LINE 2b NEW TANK A B C D E F DOWNHILL 1.Tank Construction 2.Pipe connections 3.Pipeline Plans 4.Distribution of Work

Proposed update to Water System (section relevant for EWB-MAP modifications) RED lines – supply lines to tank (uphill by pump) BLUE lines – distributions lines by gravity NEW SUPPLY LINE 1 NEW DISTRIBUTION LINE 2c NEW DISTRIBUTION LINE 2b NEW TANK A B C D E F DOWNHILL

Photos along Pipeline Path Area of Connection to Tubo Madre NEW SUPPLY LINE 1 NEW DISTRIBUTION LINE 2b NEW TANK A B C D

Photos along Pipeline Path (location of valve box?) NEW SUPPLY LINE 1 NEW DISTRIBUTION LINE 2b NEW TANK A B C D

Photos along Pipeline Path (location of valve box?) NEW SUPPLY LINE 1 NEW DISTRIBUTION LINE 2b NEW TANK A B C D

Photos along Pipeline Path NEW SUPPLY LINE 1 NEW DISTRIBUTION LINE 2b NEW TANK A B C D

Photos along Pipeline Path NEW SUPPLY LINE 1 NEW DISTRIBUTION LINE 2b NEW TANK A B C D

Photos along Pipeline Path NEW SUPPLY LINE 1 NEW DISTRIBUTION LINE 2b NEW TANK A B C D

Photos along Pipeline Path NEW SUPPLY LINE 1 NEW DISTRIBUTION LINE 2b NEW TANK A B C D

Photos along Pipeline Path NEW SUPPLY LINE 1 NEW DISTRIBUTION LINE 2b NEW TANK A B C D

Photos along Pipeline Path NEW SUPPLY LINE 1 NEW DISTRIBUTION LINE 2b NEW TANK A B C D

Photos along Pipeline Path NEW SUPPLY LINE 1 NEW DISTRIBUTION LINE 2b NEW TANK A B C D

Meeting with Mayor to discuss installation of pipeline Alcalde (Mayor) Ingeniero Romeo Jose Barillas Travelled to Alcaldia (Mayor’s office) with Alfredo Torres (member of LD ADESCO) on Tuesday June 12, 2012) Got on waiting list at 8:30 & met with Mayor at 10:45 Requested help digging trench and installing PVC tubing. Alfredo had official letter from ADESCO Mayor knew about project (had been contacted by Ana Maria de Keene – honorary consul of El Salvador in Philadelphia) and agreed to help with everything including supplying the 4” (supply) and 2” (distribution) pipes. Questions from mayor: – Is 160 PSI PVC acceptable? – Do you want cemented PVC or rapid connection? – Will send an engineer to evaluate poject. Other questions (from RAC) – Location of valve boxes, air bleeds, T’s, cleanouts – Should prepare detailed plan to send to mayor ASAP

Distribution of Work EWB-MAP – Overall project management and communication between parties – Updating design verifying that work meets design specs. – Long term planning FIAT (Sister Gloria) – Purchase of last minute supplies, order trucks of materials, submission of receipts to Rotary for reimbursement. Storage of supplies. – Organizing volunteers, hiring one mason Las Delicias ADESCO – Organizing community labor (each house volunteers 1 day or pays $6 for another person to do the work) – Ensuring secure storage of supplies – Communication with Alcaldia Daniel Rivera (Rotary San Salvador) – Purchase of supplies (1 week notice): rebar, concrete – Payment of supervisor and mason (hire one mason) – Local project management and oversight of supervisor (Miguel Martinez) Alcaldia San Juan Opico – Installation of two lines (4” supply and 2” distribution) of tubing in the same trench between Calle Principal and Tanks.

Project Expenses (Thru June 11)

Contacts FIAT guest house: Miguel Delgado (FIAT driver/helper) cell: Rene (LD President): Miguel Martinez (Supervisor on work site): Alcalde (Mayor) Ingeniero Romeo Jose Barillas