1 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – August 2012eere.energy.gov Understanding a Work Order CREW LEADER WEATHERIZATION ASSISTANCE.

Slides:



Advertisements
Similar presentations
Presents 2012 Revisions to the NC Energy Code For Residential Building started after March 1, 2012.
Advertisements

ENERGY STAR Home Sealing Improve home comfort and reduce energy bills.
ENERGY CONSERVATION: HOME WRAP, INSULATION, AND STOPPING AIR LEAKS.
Basic Concepts Identify where air leakage occurs in the home Types of materials used to stop air leakage.
EarthCraft: Insulating Strategies Energy Efficient Insulation Systems by Church Hill Homes.
Identifying and Air Sealing the Building Envelope
Energy Conservation. 1. Air Sealing Holes/Cracks 2. Improved Insulation 3. Increased Efficiency of Heating/Cooling & Domestic Hot Water (DHW) 4. Lighting.
Finishes many options Walls wood shakes, shingles, board & batten (vertical), plank lap (horizontal), T1-11 ply, vinyl, fiber cement, aluminum, stucco.&
Why blower door testing? Measure leakage Detect sources Verify fixes Click your mouse to continue to next slide.
CON 4003 Construction Estimating Prof R. V. Locurcio.
Chapter 8: Duct Design and Sealing To be used with the Guide to Building Energy Efficient Homes in Kentucky.
1 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – August 2010eere.energy.gov House as a System WEATHERIZATION ENERGY AUDITOR SINGLE FAMILY.
1 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – August 2010 eere.energy.gov Generating a Work Order WEATHERIZATION ENERGY AUDITOR SINGLE.
1 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – August 2010eere.energy.gov Energy Movement WEATHERIZATION ENERGY AUDITOR SINGLE FAMILY.
1 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – December 2012eere.energy.gov Building Shell Retrofit Strategies WEATHERIZATION ENERGY AUDITOR.
1 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – July 2012eere.energy.gov Loose-Fill Insulation: Preparation and Installation WEATHERIZATION.
Insulation Photo Resource This presentation is intended to assist the tech in providing information to the customer to help them understand and visualize.
1 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – September 2012 eere.energy.gov Desk Monitoring QUALITY CONTROL INSPECTOR WEATHERIZATION.
1 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – December 2012 eere.energy.gov Generating a Work Order WEATHERIZATION ENERGY AUDITOR SINGLE.
1 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – July 2012eere.energy.gov Plumbing Overview WEATHERIZATION INSTALLER/TECHNICIAN FUNDAMENTALS.
1 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – July 2012eere.energy.gov Spray Foam Insulation WEATHERIZATION INSTALLER/TECHNICIAN FUNDAMENTALS.
1 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – July 2012eere.energy.gov Moisture Barriers WEATHERIZATION INSTALLER/TECHNICIAN FUNDAMENTALS.
The House as a System 1. Air Temperature and Water Vapor.
1 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – December 2012eere.energy.gov Building Assessment WEATHERIZATION ENERGY AUDITOR SINGLE FAMILY.
1 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – December 2012eere.energy.gov Attic Ventilation WEATHERIZATION ENERGY AUDITOR SINGLE FAMILY.
1 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – December 2012eere.energy.gov Intermediate Math WEATHERIZATION ENERGY AUDITOR SINGLE FAMILY.
This 12 part PowerPoint series is taken directly from Energy Savers Booklet, Tips on Saving Energy & Money at Home, U.S. Department of Energy.
1 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – December 2012eere.energy.gov Moisture Assessment WEATHERIZATION ENERGY AUDITOR SINGLE FAMILY.
1 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – December 2012eere.energy.gov Blower Door Basics WEATHERIZATION ENERGY AUDITOR SINGLE FAMILY.
Chapter 4: Air Leakage Control: Materials and Techniques
Residential Construction Unit 6 Interior finishes Mr. Todzia.
2009 Fall MMSC Home Energy Makeover House #1 Chris Baryo Residence 4165 N 850 E Churubusco, Indiana.
Unit A3-12 Insulating Agricultural Structures Problem Area 3 Construction Systems.
Lesson 12 Insulating Agricultural Structures Next Generation Science/Common Core Standards Addressed! CCSS. ELALiteracy. RST.9 ‐ 10.7Translate quantitative.
Duke Elliott Setting Up a Weatherization Training Center: The LACAP Case Study.
Adriana Galue Wolfgang Custom Finishes HOME ENERGY STATS Biggest energy consumers Space heating – 34% Appliances and lighting – 34% Refrigerator.
1 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – September 2012 eere.energy.gov In-Progress Monitoring and Inspecting QUALITY CONTROL INSPECTOR.
1 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – July 2012eere.energy.gov Dense-Pack Sidewall Insulation WEATHERIZATION INSTALLER/TECHNICIAN.
Your House as a Healthy System Bruce Stahlberg. Improvements / Remodeling When one has finished building one's house, one suddenly realizes that in the.
Construction Residential Houses Definition of a House: A structure serving as a dwelling for one or more persons, especially for a family.
Demonstrating a Home Under Construction Purpose: To use your knowledge of the construction process and production USPs to influence the sales process and.
1 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – August 2010eere.energy.gov House as a System WEATHERIZATION ENERGY AUDITOR SINGLE FAMILY.
CONSTRUCTING HOMES & OTHER BLDGS. Preparing the Construction Site –Clearing the Site: the site must be cleared of anything that would get in the way of.
LOW COST & NO COST ENERGY REDUCTION STRATEGIES FOR HOUSES OF WORSHIP Lou Ann Wright, LEED AP Roman Catholic Diocese of Pittsburgh May 2014.
Part 2: Buildings as a System Lee F. Ball Jr., PhD
Conservation and Environmental Design and Construction
Walls of Structure Decreasing the Amount of Heat Exchange.
1 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – July 2012eere.energy.gov Combustion Safety WEATHERIZATION INSTALLER/TECHNICAN FUNDAMENTALS.
Finishing the Building
1 | Program Name or Ancillary Texteere.energy.gov The Parker Ranch installation in Hawaii WEATHERIZATION ASSISTANCE PROGRAM Audits 201 Glen Salas SMS
CON 4003 Construction Estimating Prof R. V. Locurcio.
CONSTRUCTION Objective You will need to write all the information down but you need to highlight, mark, or note that the items in yellow are important.
Residential Construction Unit 4- Window and Doors Mr. Todzia.
1 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – August 2012eere.energy.gov Materials Tracking CREW LEADER WEATHERIZATION ASSISTANCE PROGRAM.
1 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – December 2012eere.energy.gov Zone Pressure Diagnostics WEATHERIZATION ENERGY AUDITOR SINGLE.
PowerPoint ® Presentation Unit 52 Thermal Insulation and Other Insulating Methods Thermal Insulation Exterior Insulation and Finish Systems (EIFS) Roof.
1 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – July 2012eere.energy.gov Safe Work Practices WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED.
1 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – September 2012eere.energy.gov QUALITY CONTROL INSPECTOR Interpreting Infrared.
1 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – December 2012eere.energy.gov WEATHERIZATION ENERGY AUDITOR SINGLE FAMILY Interpreting Infrared.
1 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – August 2010eere.energy.gov Monitoring Discoveries from the Field NASCSP 2011 WEATHERIZATION.
1 1 Weatherization & Indoor Air Quality Impacts of Weatherization on Air Quality and Comfort Inside Your Home Prepared with the assistance of Jed Harrison,
1 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – August 2010eere.energy.gov Building Shell Retrofit Strategies WEATHERIZATION ENERGY AUDITOR.
1 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – August 2010 eere.energy.gov Duct Sealing and Insulation TRAIN THE TRAINER WEATHERIZATION.
1 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – August 2010eere.energy.gov Attic Ventilation WEATHERIZATION ENERGY AUDITOR SINGLE FAMILY.
1 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – August 2010eere.energy.gov Moisture Assessment WEATHERIZATION ENERGY AUDITOR SINGLE FAMILY.
1 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – July 2012eere.energy.gov ROOFING, FLASHING AND ATTIC VENTILATION Roofing, Flashing, and.
Chapter 10 Construction Basics.
Did you know? In the U.S. alone, buildings account for: 72% of electricity consumption
Components of Construction
Building standards Mr. Da Silva.
Presentation transcript:

1 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – August 2012eere.energy.gov Understanding a Work Order CREW LEADER WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – August 2012

2 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – August 2012eere.energy.gov Learning Objectives By attending this session, participants will be able to: List basic work order components. Discuss simple materials procurement methods. Give examples of how to correct work order errors and oversights. Demonstrate planning job flow to execute a work order. UNDERSTANDING A WORK ORDER

3 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – August 2012eere.energy.gov Pre-Job Planning Photo courtesy of Maine State Housing Authority UNDERSTANDING A WORK ORDER

4 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – August 2012eere.energy.gov Pre-Job Planning – Exercise #1 Pre-Job Planning (1 hour) UNDERSTANDING A WORK ORDER

5 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – August 2012eere.energy.gov Typical Work Order Anytown CAA Anytown, USA Purchase Order To: AnytownWeatherizers Anytown, USA Anytown CAA Contact: Andy Auditor (XXX)XXX-XXXX Client: John Homeowner 92 Norton Hill Road Anytown, USA (XXX) XXX-XXXX (Call after 8:00 AM) Turn onto Norton Hill Rd from Main AnytownPO. Yellow House 0.6 mile on right. UNDERSTANDING A WORK ORDER Photo courtesy of the US Department of Energy

6 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – August 2012eere.energy.gov Floor Plan UnheatedKitchen Den Living Bath BR Garage Shed Stair OpenPorch 16’ 26’ 15’ 12’ 8’ 16’ Green = Conditioned space 7’ cellar under main house Den & Kitchen Floor ≈ 1 foot clearance to ground Second floor 12’ N BR H 13’ UNDERSTANDING A WORK ORDER First Floor

7 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – August 2012eere.energy.gov 1.Carefully air seal wall between kitchen and shed by stuffing large holes with scrap fiberglass and sealing over with spray foam. Seal wire penetrations with spray foam. Install weatherstrip and door sweep on door. Materials: Scrap batt fiberglass, two cans expanding one-part foam, one Porta Seal weatherstrip, one flexsteel door sweep, two tubes silicone caulk. 2.Install continuous 6 mil poly ground cover under kitchen and rear addition. Material: 300 sq’ 6 mil poly. 3.Install 1.5 sone bath fan vented to gable end as per State Technical Manual (STM), using 4 in. metal duct sloped slightly to exterior. Seal all joints. Insulate duct. Materials: 1 bath fan, 8 ft. of 4 in. metal duct, one 4 in. elbow, 1 qt RDC#6, 1 exterior vent hood, 10 feet of 4 in. duct insulation. 4.Seal around main house chimney flashing as per STM. Material: 1 quart plastic roof cement. 5.Seal all furnace duct work. Material: 1 gallon RDC#6 mastic, two rolls web-type drywall tape. 6.Air seal all penetrations from living space to attics as per STM. Material: 1 can one-part foam for plumbing vent stack & around new bath fan, 2 tubes caulk for all wire penetrations, 4 sq ft. galvanized steel & 1 tube high temperature caulk for chimney chase. Task List #1 UNDERSTANDING A WORK ORDER

8 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – August 2012eere.energy.gov Task List #2 7.Replace existing hatch (include photos) with new airtight, insulated attic hatch as per STM. Materials: 4 sq. ft. ¾ in. AC plywood, 20 ft. #2 pine 1 in. x 4 in., 8 ft. weatherstrip, two 3 in. hooks & eyes, 8 sq. ft. 2 in. rigid foam insulation (2 layers), misc. fasteners. 8.Tag location of any knob and tube (K&T) wiring to be buried by attic insulation. 9.Dense pack main house slopes with cellulose as per STM. Material: 416 sq. ft. x 6 in. 10.Install 12 in. cellulose on attic flats as per STM. Material: Main house = 204 sq. ft., kitchen ell = 180 sq. ft., rear addition = 128 sq. ft. 11.Dense pack all walls with cellulose as per STM. Material: 945 sq. ft. x 4 in. 12.Weatherstrip and door sweep front & rear doors as per STM, Materials: Two Q- lon™ weather-strips, two Flex-steel™ door sweeps. 13.Close off uphill basement window. Materials: 3 sq. ft. ¾ in CDX, 1 qt. wood primer, necessary caulk & fasteners. 14.Insulate box sills in basement & crawl spaces per STM using two-part foam. Be sure that two-part foam seals to 6 mil poly ground cover and first floor sub- flooring. Materials: One 200 board feet two-part foam kit. UNDERSTANDING A WORK ORDER

9 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – August 2012eere.energy.gov Items From Truck Inventory UNDERSTANDING A WORK ORDER Four tubes silicone caulk Ten ft. of 4 in. duct insulation Three cans one-part foam One tube high temperature caulk Four sq. ft. ¾ in. AC plywood Two hooks & eyes Eight ft. neoprene bulb (bulk roll) weatherstrip Wiring tags Three sq. ft. of ¾ in. CDX plywood Fasteners (screws – nails) Scrap fiberglass batt

10 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – August 2012eere.energy.gov Items from CAA Warehouse These items are in the warehouse and should be loaded into the truck before heading out to the job. One 200 board foot two-part foam kit One gallon RDC#6 mastic UNDERSTANDING A WORK ORDER

11 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – August 2012eere.energy.gov Items from Local Supplier One PortaSeal™ weatherstrip One Flexsteel™ door sweep Three hundred sq. ft. 6 mil poly One 100 CFM bath fan Eight ft. of 4 in. metal duct One 4 in. elbow One exterior vent hood One quart plastic roof cement Two rolls web-type drywall tape Four sq. ft. galvanized steel sheet metal Twenty ft. #2 pine 1 in. x 4 in. Eight sq. ft. 2 in. rigid foam insulation Two Q-lon™ weatherstrips Two Flex-steel™ door sweeps One quart wood primer UNDERSTANDING A WORK ORDER

12 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – August 2012eere.energy.gov On Arrival Same house… Different season ! UNDERSTANDING A WORK ORDER Photos courtesy of the US Department of Energy

13 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – August 2012eere.energy.gov On Site: First Things First! Crew Leader and Client UNDERSTANDING A WORK ORDER Photos courtesy of the US Department of Energy

14 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – August 2012eere.energy.gov Assess job site safety. Address hazards. Document pre-existing conditions. Ensure access to work areas. Identify potential changes to work order. Determine if the work schedule needs adjustment. Purpose of Walk Through UNDERSTANDING A WORK ORDER

15 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – August 2012eere.energy.gov In General… UNDERSTANDING A WORK ORDER Photo courtesy of the US Department of Energy

16 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – August 2012eere.energy.gov Site-Discovered Issues - Exercise #2 Site Discovered Issues (30 Minutes) UNDERSTANDING A WORK ORDER

17 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – August 2012eere.energy.gov Summary At the shop, review the work order: Check for obvious errors/oversights. Procure materials. Plan the job flow. At the job site, check: You and client understand what is to be done. Planned measures are doable. Provided materials are correct. Resolve any installation problems discovered on site. UNDERSTANDING A WORK ORDER