Operate a Manufacturing Company (Case Study 2) (Rounds 2 and 4) EGN 5621 Enterprise Systems Collaboration Fall, 2011.

Slides:



Advertisements
Similar presentations
Production Planning & Execution (PP)
Advertisements

Consumption-based Planning
© Léger et al ERPsim is proprietary technology developed by researchers at HEC Montréal, École Polytechnique de Montréal and Western Michigan Univ.
Pierre-Majorique LÉGER Jacques ROBERT Gilbert BABIN Robert PELLERIN Bret WAGNER Version : August 2011 © Léger et al ERPsim is proprietary technology.
Case Study I EGN 5621 Enterprise Systems Collaboration (Professional MSEM) Fall, 2011.
Pierre-Majorique LÉGER Jacques ROBERT Gilbert BABIN Robert PELLERIN Bret WAGNER Version : August 2012 © Léger et al ERPsim is proprietary technology.
SAP R/3 Materials Management Module
Module 10 Setup for Production.
Production Scheduling: What Tool is Right for You?
SAP Purchasing Prepared by Lavanya.M. Purchasing The R/3 System consists of a number of components that are completely integrated with one another. This.
Operate a Logistics Company EGN 5621 Enterprise Systems Collaboration (Professional MSEM ) Fall, 2011.
Production Logistics and ERP
Production Planning Processes Theories & Concepts
Enterprise Systems Collaboration EGN 5621 Enterprise Systems Collaboration Fall, 2011.
Case Study 3: Operate a Manufacturing Company EGN 5621 Enterprise Systems Collaboration (Professional MSEM) Fall, 2011.
Operate a Manufacturing Company (Case Study 2) (Rounds 2 and 4) Part 2 EGN 5621 Enterprise Systems Collaboration Fall, 2011.
Pierre-Majorique LÉGER Jacques ROBERT Gilbert BABIN Robert PELLERIN Bret WAGNER Version : August 2011 © Léger et al ERPsim is proprietary technology.
University of Southern California Enterprise Wide Information Systems Manufacturing Planning and Execution (cont.) Instructor: Richard W. Vawter.
Pierre-Majorique LÉGER Jacques ROBERT Gilbert BABIN Robert PELLERIN Bret WAGNER Version : August 2011 Copyright © 2011 HEC Montréal ERP Simulation Game.
© Léger et al ERPsim is proprietary technology developed by researchers at HEC Montréal, École Polytechnique de Montréal and Western Michigan Univ.
High-Level OP Planning and Demand Management EGN 5622 Enterprise Systems Integration Spring, 2013 High-Level OP Planning and Demand Management EGN 5622.
Operate a Logistics Company EGN 5621 Enterprise Systems Collaboration (Professional MSEM ) Fall, 2012.
Case Study 3: Operate a Manufacturing Company (Introduction) EGN 5621 Enterprise Systems Collaboration Professional (MSEM) Fall, 2012.
JOB COSTING AND PROCESS COSTING WEEK 13. Production methods  Custom  Unique, single products  Batch  A quantity of the same goods produced at the.
Overview and Case Study 2: ERPsim Manufacturing (I)
Case Study 2: Operate a Manufacturing Company (I) EGN 5621 Enterprise Systems Collaboration (Professional MSEM) Fall, 2011.
Enterprise Systems Collaboration EGN 5621 Enterprise Systems Collaboration Summer B, 2012.
 Adam Stramel  Jonathan Folsom  Leanne Sawyer  Kenneth Aerts  Robin Lilly.
Case Study 2: Operate a Logistics Company EGN 5621 Enterprise Systems Collaboration Summer B, 2014.
© Léger et al ERPsim is proprietary technology developed by researchers at HEC Montréal, École Polytechnique de Montréal and Western Michigan Univ.
Case Study 4: Operate a Manufacturing Company (Extension) EGN 5621 Enterprise Systems Collaboration Professional (MSEM) Fall, 2012.
Production Planning Processes EGN 5620 Enterprise Systems Configuration Fall, 2015.
Case Study 3: Operate a Manufacturing Company (Introduction) EIN 6133 Logistics Engineering Summer B, 2015.
Case Study I EIN 6133 Enterprise Engineering Fall, 2015.
Pierre-Majorique LÉGER Jacques ROBERT Gilbert BABIN Robert PELLERIN Bret WAGNER Version : August 2011 © Léger et al ERPsim is proprietary technology.
Case Study 4: Operate a Manufacturing Company (Extension) EGN 5621 Enterprise Systems Collaboration Summer B, 2015.
Case Study 2: Operate a Logistics Company EIN 6133 Enterprise Engineering Fall, 2015.
High-Level OP Planning and Demand Management EGN 5622 Enterprise Systems Integration Fall, 2015 High-Level OP Planning and Demand Management EGN 5622 Enterprise.
Course Overview EGN 5621 Enterprise Systems Collaboration (Professional MSEM) Fall, 2011.
Case Study 4: Operate a Manufacturing Company (Extension) EGN 5621 Enterprise Systems Collaboration Fall, 2015.
ERPsim Overview EIN 6133 Enterprise Engineering Fall, 2015.
MRP (Material Requirement Planning) The main function of material requirements planning is to ensure material availability on time. MRP helps monitor the.
Version : March 2016 © Léger et al ERPsim is proprietary technology developed by researchers at HEC Montréal, École Polytechnique de Montréal Updated:
ERPsim Overview EGN 5621 Enterprise Systems Collaboration MSEM, Professional Fall, 2013.
Analysis and Interim Report Valeria Balseca Sales & Marketing Manager Claudia Prada MM Manager Jhonattan Polo CEO.
High-Level OP Planning and Demand Management EGN 5622 Enterprise Systems Integration Fall, 2015 High-Level OP Planning and Demand Management EGN 5622 Enterprise.
Distribution Game Version 2015.
SAP SCM ONLINE TRAINING
Enterprise Systems Collaboration Logistics Game
Case Study 3: Operate a Manufacturing Company - II (Extension)
Case Study 3: Operate a Manufacturing Company (Introduction)
ERP – Muesli Simulation
ERPsim Overview EGN 5621 Enterprise Systems Collaboration (Professional MSEM) Fall, 2012.
ERPsim4HANA Business Experience Manufacturing - Intro Simulation
Case Study 2: Operate a Logistics Company
Managing Materials Requirements Planning Course
ERPsim4HANA Business Experience Manufacturing - Short Simulation
Operate a Logistics Company (Case Study 3) (Overview and first 3 Runs)
Operate a Manufacturing Company (Case Study 2) (Rounds 2 and 4) Part 2
Enterprise Systems Collaboration
Case Study 4: Operate a Manufacturing Company (Extension)
Enterprise Operations Overview & Strategic Planning EGN 5622 Enterprise Systems Integration (Professional MSEM) Fall, 2012.
EGN 5621 Enterprise Systems Collaboration Fall, 2011
EGN 5621 Enterprise Systems Collaboration
EGN 5621 Enterprise Systems Collaboration Summer B, 2013
Case Study 4: Operate a Manufacturing Company (Extension)
Case Study 2: Operate a Logistics Company
Analysis and Interim Report
Presentation transcript:

Operate a Manufacturing Company (Case Study 2) (Rounds 2 and 4) EGN 5621 Enterprise Systems Collaboration Fall, 2011

Tasks for the Manufacturing Case Study (Rounds 2 and 3) NoRolesFunctionsTransaction Code 1CEOFinancial statementF.01 Price market reportZMarket Summary sales reportZVC2 Sales & MarketingSales order reportZVA05 Summary sales reportZVC2 Price market reportZMarket Marketing expenseZADS Change priceVK32 3Production & PlanningForecast – create planned independent Requirements MD61 MRP runMD01 Release production ordersCO41 Monitor production scheduleZCOOIS Product cost analysisZCK11 Check RM cost per Prod. orderZKSB1 4Procurement ManagementAutomatic generate of POsME59 Track PO reportZME2N MRP results displayMD07 Warehouse ManagementCheck stock levelMD04 Inventory reportZMB52 2

Cost, inventory & initial pricing Material$$-F01$$-F02$$-F03$$-F04$$-F05$$-F06 Name Nut Muesli 1.0 kg. Blueberry Muesli 1.0 kg. Strawberry Muesli 1.0 kg. Raisin Muesli 1.0 kg. Original Muesli 1.0 kg. Mixed Fruit Muesli 1.0 kg. Raw material Cost€ 1.53€ 1.97 € 1.38€ 1.36€ 1.76 Standard cost€ 2.48€ 3.09 € 2.50€ 2.65€ 2.89 Initial price € 4.24 € 4.49 € 5.18 € 5.43 € 5.18 € 5.43 € 3.92 € 4.17 € 3.87 € 4.12 € 4.75 € 5.00 Initial stock100,000

Parameters of the Operation

Introductory Game: Round 2 30 steps 30 min

Participant’s job aid & Menu

Create Independent Requirement Pland for 6 Finished Products (MD61)

Create Independent Requirement Plan for 6 Finished Products (MD61)

Run MRP (MD01)

Conversion of Planned Order (CO41)

Release production order

Release Production Orders (CO41)

Check Production Schedule

Automatic Creation of Purchase Orders from Requirement (ME59)

Purchase Order Tracking(ZME2N)

Introductory game: Round 2 (30 steps - days) Now start the simulator for 30 steps

Introductory Game: Round steps 30 min

Participant’s job aid & Menu

Raw material cost per PO

Forecasting

Execute MRP

After the MRP run

Convert purchase requisitions into purchase orders

Introductory game: Round 3 (30 steps – 30 days) Now start the simulator for the last 30 steps

Track purchase orders

Profit center analysis

Liquidity planning