TAU - status December 14. Lab setup 9/7/2011TAU - status report2 Each RO line is X100 Attenuated and 100Ω terminated 10 μm position precision of collimated.

Slides:



Advertisements
Similar presentations
CSC Test Beam Data Analysis Alexander Khodinov and Valeri Tcherniatine.
Advertisements

Status of test beam data analysis … with emphasis on resistive coating studies Progress and questions 1Meeting at CEA Saclay, 25 Jan 2010Jörg Wotschack,
R Squared. r = r = -.79 y = x y = x if x = 15, y = ? y = (15) y = if x = 6, y = ? y = (6)
PPS telescope – main idea Have 10 layers of PPS in one test-bench The entire construction is between scintillators (top and bottom) for external trigger.
Mechanical check of PMT Check base: Remove black tape and two small screws that secure the base. Tighten the nuts on the BNC connector for the HT input.
Veto Wall Test Hyupwoo Lee MINERvA/Jupiter Group Meeting Feb, 13, 2008.
Veto Wall Test Hyupwoo Lee MINERvA/Jupiter Group Meeting Oct, 3, 2007.
Beam profile vs time Analyzed Vx vs Vy distributions vs time for –Run 72 (13:26:02 – 28:25) –Run 73 (13:36:10 – 13:37:30) –Run 74 (43:12 – 44:21) Binned.
Veto Wall Test Hyupwoo Lee MINERvA/Jupiter Group Meeting Oct, 24, 2007.
Veto Wall Test Hyupwoo Lee MINERvA/Jupiter Group Meeting July 18, 2007.
N_TOF fission data of interest for ADS
UM PPS Lab Activities PPS meeting October 9 and 16, 2012.
Procedure for Pro4 using Keithley
ITOP carrier amplifier test at Indiana University G. Visser 4/27/2015 (latest update) I use the recently (here) characterized JT0947 ch3 as input source.
 What is Four Point Probing  How the system works  Pro 4 Set Up  Simple Calculations behind Four Point Probing  Procedure for using Pro4.
 A constant ratio in any proportional relationship  Really just another name for unit rate! Remember, to be constant means it never changes!
UM PPS Lab Activities - HV Readout Long Run - Single Source Saturation Test PPS meeting April 30, 2012.
Polynomial Functions and Models Section 5.1. Polynomial Functions.
Large Cell Scope Pictures HV Gnd 1nF Large Cell Tube Anode signal Cathode signal scope S1 S2 S1 S2 The following scope pictures were all taken with the.
Yiftah Silver Tel Aviv University September 27 th 2012.
Plasma Panel Sensor – Tel-Aviv September
UM PPS Lab Activities PPS meeting January 22, 2012 Claudio, Curtis, Dan, Riley.
Algebra1 Graphing Functions
Density, Mass, & Volume Concepts & Equations Mr. Abud.
Report on SiPM Tests SiPM as a alternative photo detector to replace PMT. Qauntify basic characteristics Measure Energy, Timing resolution Develop simulation.
Timing Jitter and Cross Talk in the SRS + Xray scan of FIT zigzag board Michael Phipps, Bob Azmoun, and Craig Woody 1.
Procedure for Pro4 using Keithley
TAU status 14/2/2012. Temperature behavior in red Delayed response No A/C T=24-25 C 19 o C Cold A/C T=19-20 C 30 o C Hot A/C T=28-32 C 16:30 18:00 04:00.
= = Proportions A proportion is an equation that states
IPM status and plans 1.Yellow vertical detector has extremely low coupling to beam and to signal-gating grid. It also has improved resolution due to reduced.
HV connection for a Common GEM foil design Aiwu Zhang
Long Run Test on Microcavity #2 PPS meeting 01/06/ The UoM guys SETUP 90 Sr (4.7 mCi in 1993) Source at ~3 inches over the panel over the pixel in.
Regression Lines. Today’s Aim: To learn the method for calculating the most accurate Line of Best Fit for a set of data.
1 TRD-prototype test at KEK-FTBL 11/29/07~12/6 Univ. of Tsukuba Hiroki Yokoyama The TRD prototype is borrowed from GSI group (thanks Anton).
IEEE 2011 NSS-MIC Valencia Yiftah Silver October 26 th 2011.
Muon Detection with Resistive Plate Chambers (vis a vis MARTA upgrade proposal) Joseph Berlin Penn State University Auger Data Analysis Meeting, Oct
Foundry Characteristics
Yiftah Silver Tel Aviv University September 27 th 2012.
On lab reports and other details January 20, 2011 Kevin Stenson.
SPH3UIB DAY 3/4 NOTES METRIC SYSTEM,GRAPHING RULES.
1 4 PCB: LEFT TOP 115 channels, LEFT BOTTOM (115), RIGHT TOP (106), RIGHT BOTTOM (106). For LEFT TOP board 115 channels we have: 115 smd connectors (AMP.
M. Bianco On behalf of the ATLAS Collaboration
Slope of a Line Slope basically describes the steepness of a line.
5 July 2010Ivo Polák, FZU, Prague LED notched fibre distributing system Calibration system for SiPM Ivo Polák, Ji ř í Kvasni č ka
Update on the Triple GEM Detectors for Muon Tomography K. Gnanvo, M. Hohlmann, L. Grasso, A. Quintero Florida Institute of Technology, Melbourne, FL.
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC January 17, 2003TOTEM plenary meeting -Marco Bozzo1 CSC detectors for T1.
K. Matsuoka (Kyoto Univ.) for T2K muon monitor group
Status 29/09/15. Trigger system: - Scintillator system : scintillator+pmt, discriminator+ coincidence module -TLU module + PC + USB cable Detectors :
Production Readiness Review at PNPI Chamber assembling: Main production and quality control steps 30 January 2004 – G.Alkhazov 1.Input components control.
Demodulating a PAM Signal Generated by Sinc- Shaped Pulses (Part 2)
E.Guschin (INR,Moscow) 3 May 2006Calorimeter commissioning meeting Status of PRS/SPD detector Cosmic test results Installation/tuning of monitoring system.
Simulations of various aspects of the PPS Various members of the collaboration, to be enumerated later.
UM PPS Lab Activities Mid-size Panel Tests PPS meeting January 15, 2012 Claudio, Curtis, Dan, Ethan, Riley.
Zaragoza, 5 Julyl Construction of and experience with a 2.4 x 1 m² micromegas chambers Givi Sekhniaidze On behalf of the Micromegas community.
Inverse Variation. A relationship that can be written in the form y =, where k is a nonzero constant and x ≠ 0, is an inverse variation. The constant.
The fault occurred at the level of 400V-500V. Investigation of the fault to ground at the RCS.A34B2 circuit Between 3 and 12 September, 2014 we carried.
1 First Results of the SLD Cerenkov Polarimeter at the DESY test beam Oleg Eyser Daniela K äfer, Christian Helebrant, Jenny List, Ulrich Velte*
Single GEM Measurement Matteo Alfonsi,Gabriele Croci and Bat-El Pinchasik June 25 th 2008 GDD Meeting 1.
1 9 December 2002A.P.Kashchuk (LNF/INFN), Frascati) New approach to CPC design.
Infrared Laser Test System Silicon Diode Testing 29 May 2007 Fadmar Osmić Contents: Setup modifications new amplifier (Agilent MSA-0886) new pulse generator.
3D Diamond Detectors: Update on Current Work Steven A. Murphy 16 th July 2014.
Area The amount of space inside the boundary of a two- dimensional shape. Perimeter The distance around a two- dimensional shape.
LED notched fibre distributing system Calibration system for SiPM
GRAPHS – MODE OF OPERATION
Setup for Cosmic Ray Test of VPA panel, using MiniDAQ
Investigation on tray MID 063 Back
Power Circuit By: AAA.
Neutron Beam Test for Measuring Quenching Factor of CsI(Tl) Crystal
CTY SAR FCPS Alexander Velikanov
Presentation transcript:

TAU - status December 14

Lab setup 9/7/2011TAU - status report2 Each RO line is X100 Attenuated and 100Ω terminated 10 μm position precision of collimated source Discriminator 10 RO lines VME V560 counter HV line quenched with 20MΩ connected to a 1MΩ /100MΩ voltage divider

Source position 9/7/2011TAU - status report3 Source sits here 1cm thick, Delrin collimator, with a 3 mm slit opening

All night measurement collimated Source was left on the same position (above RO channel 7) for ~14 hours. 9/7/2011TAU - status report4

9/7/2011TAU - status report5 Each histogram shows the ratio between each channel and the channel beneath the source (7). hour ra ti o

Position scan Each full turn of the micrometer moves the source by 1mm Started the scan when the micrometer read is 60mm Made 16 measurements each of 5minutes and 1mm apart. CF4 gas, 600 Torr, 1316V. Actual voltage on the panel is ~4/5 of the HV applied due to the voltage divider. 9/7/2011TAU - status report6

9/7/2011TAU - status report7 49mm50mm51mm52mm 53mm54mm55mm 56mm 60mm 59mm 58mm 57mm cpmcpm Channel

Source position measurement 9/7/2011TAU - status report8 points in this graph are the Gaussian fit results Errors are σ/ √ (n-1) Numbers in the x-axis have no global meaning, simply the read of the micrometer and not the distance from any real point in space… The electrode pitch in this panel (10 electrodes per inch) is the slope of this line: 0.4 electrodes per mm…

XY signal processing Measuring the pulse as a function of HV line number. RO Volts Time Panel HV

HV lineAreaWidth at bottom Width at 60% Maxim um bins21 bins bins33 bins bins64 bins bins57 bins1.05 XY signal processing Cutting out the noise. Flipping the signal to the positive side. Trying to discriminate between the two pulses (table above). None of the quantities above seems to give good separation between the two pulses.

Last minute plots … Seems that the r/o pulse can be parameterized according an electric damped oscillator 9/7/2011TAU - status report11

r/o pulse fit 9/7/2011TAU - status report12 If we supposed R=100 ohms, the fit results gives C=15pF

Future plans Measuring the signal at stripe #1, we expect to get the signal shape with a factor 2. This should include the negative side of the bi- polar signal. Fitting the two pulses with the shape extracted from the above measurement. Allowing the location of the two signals to float.