1 Procurement Quality Assurance Use quality as the framework for process/continual improvement Use quality as the framework for process/continual improvement.

Slides:



Advertisements
Similar presentations
Effectively applying ISO9001:2000 clauses 6 and 7.
Advertisements

1 Professionalising Programme & Project Management Developing programme & project management capacities for UNDP and national counterparts External Briefing.
How ISO9001 Compares with CMM Mark C. Paulk JAN,1995 CMM version 1.1 ISO9001 July 1994 presented by Zhilan Zhou.
ISO 9001 : 2000.
SAE AS9100 Quality Systems - Aerospace Model for Quality Assurance
QLF Contract Quality Clauses Working Group QUALITY LEADERSHIP FORUM CONTRACT QUALITY CLAUSES WORKING GROUP Ken Crane MSFC September 24, 2002.
The ISO 9002 Quality Assurance Management System
Recruitment and Partnerships Module 2. Getting Acquainted How many of you have a background in 4‐H? Can any of you tell me just one thing about the system.
FAA Regulatory Policy for Composite Material Control Presented at 8/8/02 FAA/NASA Workshop (Chicago, IL) Introduction – Importance of stabilizing composite.
FAA FAA Advisory Circular Presented at 9/16/03 Workshop (Chicago, IL) Background – Purpose of the advisory circular – Related regulations & guidance materials.
TEMPUS ME-TEMPUS-JPHES
OAG Office of the Auditor-General Promoting Accountability in the Public Sector Using Audit to Oversee Public Procurement Edward Ouko Auditor-General Kenya.
This teaching material has been made freely available by the KEMRI-Wellcome Trust (Kilifi, Kenya). You can freely download, adapt, and distribute this.
OGC’s Managing Successful Programmes MSP. Purpose of MSP To provide a framework of best practice principles and concepts for programme management drawn.
ISO 9000 Certification ISO 9001 and ISO
For Internal Use Only General Learning Programme Business Case ECR National Initiatives Presentation Sept. 4 th, 2003.
4. Quality Management System (QMS)
Welcome ISO9001:2000 Foundation Workshop.
Project Management Lecture 5+6 MS Saba Sahar.
Quality Management System
 A project is “a unique endeavor to produce a set of deliverables within clearly specified time, cost and quality constraints”
CHAPTER 5 Infrastructure Components PART I. 2 ESGD5125 SEM II 2009/2010 Dr. Samy Abu Naser 2 Learning Objectives: To discuss: The need for SQA procedures.
Introduction to Software Quality Assurance (SQA)
ISO 9000 and Public Awareness and Information Session 22 February 2006 Owen Glave, MBA-TQM.
Software Quality Assurance Lecture 4. Lecture Outline ISO ISO 9000 Series of Standards ISO 9001: 2000 Overview ISO 9001: 2008 ISO 9003: 2004 Overview.
Quote for today “Sometimes the questions are complicated and the answers are simple” - ?? ????? “Sometimes the questions are complicated and the answers.
Chapter 11: Strategic Leadership Chapter 8 Production and operations management.
For Internal Use Only General Learning Programme Business Case ECR Europe Board Presentation Sept. 5 th, 2003.
ETICS2 All Hands Meeting VEGA GmbH INFSOM-RI Uwe Mueller-Wilm Palermo, Oct ETICS Service Management Framework Business Objectives and “Best.
Green Partnerships Local Partnerships for Greener Cities and Region Stavroula Tournaki, Chemical Engineer MSc, ΕU Projects Manager Konstantinos Voumvourakis,
What is a Business Analyst? A Business Analyst is someone who works as a liaison among stakeholders in order to elicit, analyze, communicate and validate.
Quality Concepts within CMM and PMI G.C.Reddy
1. Housekeeping Items June 8 th and 9 th put on calendar for 2 nd round of Iowa Core ***Shenandoah participants*** Module 6 training on March 24 th will.
Key Functions of Business Operations
Process System Capability An introduction to 9103 ‘VARIATION MANAGEMENT OF KEY CHARACTERISTICS’ Bernard LAURAS AIRBUS.
QUALITY MANAGEMENT STATEMENT
Protecting the Public, Astronauts and Pilots, the NASA Workforce, and High-Value Equipment and Property Mission Success Starts With Safety Aerospace Process.
NASA Quality Leadership Forum: Supply Chain Management Case Study Ken Ortiz/Alphaport, Inc. net-inspect ™
1 EMS Fundamentals An Introduction to the EMS Process Roadmap AASHTO EMS Workshop.
1 UNEP/IETC EST Initiative Proposed Cooperation Framework 4 December 2003 Otsu, Japan.
Consultant Advance Research Team. Outline UNDERSTANDING M&E DATA NEEDS PEOPLE, PARTNERSHIP AND PLANNING 1.Organizational structures with HIV M&E functions.
CurriculumCurriculum Department of Curriculum & Testing March, 2011 A Look at the New Curriculum Guides & the Instructional Process.
Purpose: The purpose of CMM Integration is to provide guidance for improving your organization’s processes and your ability to manage the development,
Software Quality Assurance SOFTWARE DEFECT. Defect Repair Defect Repair is a process of repairing the defective part or replacing it, as needed. For example,
It was found in 1946 in Geneva, Switzerland. its main purpose is to promote the development of international standards to facilitate the exchange of goods.
The Second Annual Medical Device Regulatory, Reimbursement and Compliance Congress Presented by J. Glenn George Thursday, March 29, 2007 Day II – Track.
The Project Plan Plan Your Work, then Work Your Plan
Defining the Functional Needs of Our College. Strategic Technology Plan Project Roadmap Project Principles Developed Readiness Assessment.
IPSP Outcomes Reporting Framework What you need to know and what you need to do.
SE513 Software Quality Assurance Lecture12: Software Reliability and Quality Management Standards.
California Department of Public Health / 1 CALIFORNIA DEPARTMENT OF PUBLIC HEALTH Standards and Guidelines for Healthcare Surge during Emergencies How.
BUS OPERATOR WORKSTATION PROCUREMENT TEAM TRAINING T O ENHANCE BUS OPERATOR ERGONOMICS, HEALTH, AND SAFETY A TRAINING TEMPLATE FOR TRANSIT AGENCIES [ADD.
To the Greater Phoenix Chapter of ASQ January 10, 2013.
Technology Services – National Institute of Standards and Technology Conformity Assessment ANSI-HSSP Workshop Emergency Communications December 2, 2004.
Canberra Chapter July PMI Chapter Meeting July 2007 PMCDF Competence Framework A presentation by Chris Cartwright.
Safety Management Systems Session Four Safety Promotion APTA Webinar June 9, 2016.
Introduction for the Implementation of Software Configuration Management I thought I knew it all !
External Validation of Quality Programs
Prepared by Rand E Winters, Jr. ASR Senior Auditor October 2014
UNIT V QUALITY SYSTEMS.
Food Production Systems
ISO 9001 Awareness Training.
Lockheed Martin Canada’s SMB Mentoring Program
ISO 9000 Dr. S. Thomas Foster, Jr..
AS 9100 Awareness Training.
External Validation of Quality Programs
Supplier Corrective ACTION RESPONSE REVIEW TRAINING
Quality Systems ISO 9000 Series QS-9000 TE-9000 AS9000
Presentation transcript:

1 Procurement Quality Assurance Use quality as the framework for process/continual improvement Use quality as the framework for process/continual improvement Don’t mandate specific business approaches Don’t mandate specific business approaches Focus on the basic quality requirements (AS9100A) Focus on the basic quality requirements (AS9100A) Provide assistance in understanding and reference best practice Provide assistance in understanding and reference best practice Here is the basic requirement you have under contract, this is what it means, here are examples of how people have addressed it Here is the basic requirement you have under contract, this is what it means, here are examples of how people have addressed it Reinforce common understanding without a lot of new requirements (avoid interpretation letters, definition documents, etc) Reinforce common understanding without a lot of new requirements (avoid interpretation letters, definition documents, etc) Allow “best business practice” tools to work within this road map Allow “best business practice” tools to work within this road map NASA’s Perspective of Supplier Process/Continual Improvement Continuous improvement and process control in the context Useful guidance and reference based on AS9100A requirements

2 Procurement Quality Assurance The Plexus Perspective of Supplier Process/Continual Improvement Use an industry specific and internationally accepted system approach (AS9100A) Use an industry specific and internationally accepted system approach (AS9100A) Create tools that complement the system and allow stakeholders to utilize the tools in their business approaches Create tools that complement the system and allow stakeholders to utilize the tools in their business approaches Provide types of training that are focused on assisting in understanding and reference best practice Provide types of training that are focused on assisting in understanding and reference best practice Apply the Plexus Learning Model, a proven approach to transferring concepts and knowledge Apply the Plexus Learning Model, a proven approach to transferring concepts and knowledge Assist the stakeholders in cascading knowledge throughout their organizations and supply chains Assist the stakeholders in cascading knowledge throughout their organizations and supply chains Focus Tools and Training on Practices That are based on the Process Approach of the AS9100A requirements. This Provides the Best Chance for True Improvement

3 Procurement Quality Assurance AS9100A Practitioners Guidance Operators Reference Management Work Floor Technician Process /System Owner What Does AS9100A Mean to Me? We believe that if you can really address this question, you will have continuous improvement Customer/Supplier/Assessor- Registrar

4 Procurement Quality Assurance How to provide useful reference and guidance: AS9100A The overarching process based standard that allows Quality and Business Systems to be Linked Practitioner’s Guides Useful Guidance on how AS9100A relates to individual process/systems owners Operator’s References Practical Information to assist deployment at the operator level with respect typically operations within the aerospace environment Continuous Improvement Results AS9100A Practitioners Guidance Operators Reference

5 Procurement Quality Assurance AS9100A A common set of requirements for continuous improvement is already in place Adopted Across the Aerospace Industry International standard with the key requirements for the aerospace industry Allows processes in operations across the supply chain to link AS9100A Management Responsibility Measure, Analyze, Improve, and Control Quality Management System Product Realization Resource Management

6 Procurement Quality Assurance PRACTITIONER’S GUIDES Understanding on how to apply the standard Best practices from the aerospace industry Shared ideas from other industries and sectors Guidance for application, measurement, analysis, improvement, and control Practitioner’s Guide AS9100A Requirement Practitioner Perspectives Product Realization Purchasing Manufacturing Engineering Production/ Planning Other Example: Product Realization Continuous Improvement From the Perspective of a Manufacturing Lead What do I need to Know About implementing AS9103, etc.?

7 Procurement Quality Assurance Operators Reference Key Definitions Pictures - what might it look like (on a print, in a work instruction – use common examples) What do I need to think about? Operator’s Reference Manufacturing AS9100A Requirement Practitioner Perspectives Product Realization Example: Product Realization Continuous Improvement From the Perspective of a Operator working in manufacturing What do I need to Know About Key Characteristics? Operator Reference Other Topic Key Character

8 Procurement Quality Assurance Practitioner’s Guide Operator’s Reference Process Control Information For: Program Management Planning Purchasing Design Product Realization Measurement and Test Operations Topics Related To Guide Information EXAMPLES: Key Characteristics Configuration Management Receiving Materials Blueprints and Specifications Manufacturing Processes ECT.

9 PHASE 3 : Acquisition (Purchasing) PEOPLE - RESPONSIBILITY FOR QUALITY IN PURCHASING HAS BEEN ASSIGNED - PEOPLE WITH RESPONSIBILITY ARE FAMILIAR WITH QUALITY CONCEPTS IN PURCHASING PEOPLE - RESPONSIBILITY FOR QUALITY IN PURCHASING HAS BEEN ASSIGNED - PEOPLE WITH RESPONSIBILITY ARE FAMILIAR WITH QUALITY CONCEPTS IN PURCHASING EQUIPMENT - PRODUCTION EQUIPMENT IS PURCHASED FROM QUALIFIED BUILDERS - EQUIPMENT AND TOOL RUN-OFF IS PERFORMED PRIOR TO ACCEPTANCE OF EQUIPMENT MATERIALS - CERTIFICATES AND TEST RESULTS ARE VERIFIED AGAINST PURCHASING DATA - INSPECTION AND TESTING ARE PERFORMED TO VERIFY MATERIAL CONFORMANCE METHODS - SUPPLIERS ARE SELECTED ON THE BASIS OF THEIR ABILITY TO PRODUCE AND DELIVER MATERIALS THAT MEET THE REQUIREMENTS - PURCHASING INFORMATION CLEARLY DEFINES ALL REQUIREMENTS METHODS - SUPPLIERS ARE SELECTED ON THE BASIS OF THEIR ABILITY TO PRODUCE AND DELIVER MATERIALS THAT MEET THE REQUIREMENTS - PURCHASING INFORMATION CLEARLY DEFINES ALL REQUIREMENTS AS9100A Requirement Product Realization Purchasing Manufacturing Engineering Production/ Planning Other ENVIRONMENT - SUPPLIER CERTIFICATIONS OF MATERIALS INCLUDE ENVIRONMENTAL CONTROL DATA -STORAGE AREAS ARE MONITORED FOR ENVIRONMENTAL CONDITIONS THE RECOMMENDATIONS IN STANDARDS #1, #2, #6 SUPPORT THIS PHASE OPERATOR REFERENCES  Receipt of Materials  Identification and Storage SUPPORT THIS PHASE Procurement Quality Assurance

10 Operator’s Reference for Integrated Process Management PROCESS:Procurement OPERATION:Receipt of Materials KEY ACTIVITIES  VERIFY IN-COMING PAPERWORK  VERIFY TYPE/CLASS OF MATERIAL  VERIFY AMOUNT/QUANTITY OF MATERIAL  INSPECT CERTIFICATIONS  INSPECT MATERIAL KEY ITEMS  ALL PAPERWORK IS CORRECT  CERTIFICATIONS ARE CORRECT  IN-COMING MATERIALS MEET SPECIFICATIONS  IN-COMING MATERIALS ARE IN USABLE CONDITION  MATERIAL IS PACKAGED PROPERLY  MATERIAL INSPECTION/TEST SHOWS MATERIAL IS CONFORMING KEY MEASUREMENTS  INCOMING QUANTITIES  CERTIFICATE OF CONFORMANCE TO SPECIFICATIONS  INSPECTION/TEST REPORTS Keys to Presentation: Simple Descriptions of Activities Key Items Tied to Critical Actions Measurements Represent Best Practices from Guide Real Activity Photos Used Where Possible (Instead of Clip Art) Procurement Quality Assurance

11 Procurement Quality Assurance Practitioner’s Guide and Operator’s References Plan Produce Provide A Three Step Approach: Plan: Determine Best Industry Practices Seek Stakeholder Input Outline Concept and Delivery Produce: Design Guide and References to Match Concept and Delivery Goals Select and Use Medias to Best Provide Information to Target Audiences Provide: Deliver Reference and Guides to Target Audiences Via: Hard Copies Electronic Copies Seminars/Symposiums Training

12 Procurement Quality Assurance A consistent message Utilize a single development resource Provide outreach to the industry and supply chain (a common set of basic guidance/reference) Symposiums, Seminars and Focus Groups Stakeholder Feedback On-Demand Training Train-The-Trainer –Quality leads trained on working with practitioners –Practitioners trained on working with operators –Registrars trained on both

13 Procurement Quality Assurance AS9100A Implementation -Wish List -Outreach -1 st set of Guides and Reference Complete Set of Guides and References Current & On-Going Oct Aug Time Line

14 Concept Development And Presentation First Set – Guide and References Sept Where Are We Today? Meet Industry Needs Publications – Presentations - Training Oct. 2002The future Procurement Quality Assurance

15 Procurement Quality Assurance NASA lead role in starting the process (working with PLEXUS) Coordinate with AAQG on content, format, and delivery Provide to the AAQG as a reference material available to the suppliers Let AAQG lead follow-on coordination and update