 The Purpose of HMIS is NOT the generate Reports for your APR  The purpose of HMIs is to track a client’s progress through the Continuum of care from.

Slides:



Advertisements
Similar presentations
NIMAC 2.0: The Accessible Media Producer Portal NIMAC 2.0 for AMPs.
Advertisements

BAI HELPDESK Pressing your spacebar will take you through this presentation.
2014 HUD Data Standards. New & Active Clients All ESG, CoC and SSVF funded agencies are required to begin collecting data on new and active clients based.
Students in Temporary Housing (STH) ATS Training Manual Office of Youth Development and School-Community Services March 2004.
DKJ. Logging On 1.Open Firefox. If Firefox is not installed on the machine download and install it. 2.If the screen does not look like the screen above.
Ohio Balance of State Continuum of Care Introduction to the 2014 HUD Data Standards July 17, 2014.
Genelle Denzin, Matt Dicks, Rhonda Taylor from Coalition on Homelessness and Housing in Ohio.
Welcome to Clienttrack and the World of HMIS
Recertification Process Meeting July 13,  In March 2010, HUD distributed a revised version of the Data Standards for HMIS  New set of Program.
Introduction to Online Data Collection (OLDC) Community Based Abstinence Education September, 2009.
Supportive Services for Veteran Families (SSVF) Data Bigger Picture Updated 5/22/14.
OCTOBER 24, 2012 PRESENTED BY RENEE LAMBERJACK, RESEARCH & EVALUATION ASSISTANT Annual Homeless Assessment Report Presentation to Safe Harbors Partners.
HMIS Fundamentals HMIS Data Standards for VA Community Contract Programs.
Supportive Services for Veteran Families (SSVF) Data
Supportive Services for Veteran Families (SSVF) Webinar Series SSVF and the 2014 HMIS Data Standards 9/24/2014 Audio can be accessed through the following.
SAFE HARBORS 2011 AHAR Preparation. AHAR Reporting Categories King County  Emergency Shelter – Individuals  Emergency Shelter – Families  Transitional.
Data Standards and Reporting 2014 Updates and what they mean for your programs.
Annual Homeless Assessment Report (AHAR) What data will be included in the 2010 AHAR? October 1, 2009 – September 30, 2010 Seattle and King County.
Welcome to the Second Tutorial Welcome to the second part of this communication system website tutorial! This tutorial is for church planters. When you.
Primary Care Residency Funding Presented by: Rachael Gastelum, Song-Brown Program Analyst July 22,
Nutmegit.com Provided by: P W HMIS DATA COORDINATOR MEETING May 2013.
Office of Human Resources Payroll Department Time Entry (DTE) Entering Time 1.
Supportive Services for Veteran Families (SSVF) Data HMIS Lead and Vendor Training Updated 5/22/14.
Improving Data Entry and Reporting for the HOPWA Program May 2012.
Think Change Be Change Lead Change CT PIT 2013 Program Staff Training January 2013 Training PowerPoint Provided by CCEH CT Coalition to End Homelessness.
Online Reporting Guide
SurplusSurplus Surplus Forum January 8, SurplusSurplus Changes at Surplus Presented by Margaret Chambers, Director.
2014 Homeless Management Information Systems (HMIS) Data Standards for ESG Presented by Melissa Mikel September
Supportive Services for Veteran Families (SSVF) Data Data Collection & Reporting: Basics Updated 5/22/14.
Welcome to the Second Tutorial Welcome to the second part of this information system website tutorial! This tutorial is for church planters. If you’d like.
ClientPoint ™ Data Entry Workflow. ClientPoint “The filing cabinet!” Search for existing clients, or add clients.
Collection of Assessment Results
Supportive Services for Veteran Families (SSVF) Data HMIS Lead and Vendor Training Updated 9/14.
HPRP: New Reports HPRP new reports and data entry reporting review April 2010.
HPRP Reporting Training For Quarterly Reporting Nov. 20 th wilderresearch.org.
Downloading and Installing Autodesk Revit 2016
Revised HMIS Data Standards: with a focus on Chronic Homeless Status and Project Specific Data Elements Thursday, September 31.
Supportive Services for Veteran Families (SSVF) Data Data Collection & Reporting Basics.
Mtivity Client Support System Quick start guide. Mtivity Client Support System We are very pleased to announce the launch of a new Client Support System.
Revised HMIS Data Standards: with a focus on Chronic Homeless Status and Project Specific Data Elements Thursday, September 31.
Nutmegit.com Provided by: P W HMIS DATA COORDINATOR MEETING June 2013.
HOMELESS VERIFICATION FORMS GRANTEE WORKSHOP Anna Jacobsen City of Pasadena.
2010 Florida HMIS Conference 1. Using HMIS to Inform Performance Measurement Outcomes Objective: –Enhance awareness and understanding on using HMIS to.
Steps for posting a training (single event or series) to the regional calendar R&C Regional Calendar.
Annual Performance Report ( APR ) Data Entry Workflow.
THE NEW FINAL RULE DEFINING “CHRONICALLY HOMELESS” HomeBase January 4, 2016.
Data Coordinators Conference – 2014 Laura Marroquin CASEWORKER/JCMS Specialist Everything New Data Coordinators Should Know.
Emergency Shelter and Housing Assistance Program Data Requirements 12/3/2015.
New User Training for Singles Providers TCP Policy and Programs Team.
New User Training for Family Providers TCP Policy and Programs Team.
HMIS Data Quality Training 211 Orange County. Learning Objective This training is scheduled for 2 hours. Objective 1.Teach users how to find deficiencies.
HMIS Management Reports and Data Quality Training Last updated:1/26/2012.
2014 HMIS Data Standards Overview HMIS Data Standards Background – Key resources – Implementation Timeline – Revision Process Overview of Key.
Ohio Balance of State Continuum of Care HMIS Data Quality Monitoring Webinar April 26 th, 2016 Presented by COHHIO HMIS Department: Genelle Denzin Amanda.
Case Management Updates.  During the of week April 11, 2011, the ETO system experienced technical difficulties.  As of April 13, 2011, the errors have.
Managing the Non-WISP Prioritization List Carrie Poser, COC Coordinator April 27, 2016.
VAdata Tools VAdata: Virginia’s Sexual and Domestic Violence Data Collection System.
OR: How I learned to stop worrying and love the database
KYHMIS BOS Quarterly Meeting
Sigma-Aldrich PT Portal
Detroit Continuum of Care (CoC) 2017 HIC and PIT Count
HMIS Data Standards 2017 Changes
MDHI and BOS User Group August HMIS User Group MDHI and BOS User Group
Minnesota’s Homeless Management Information System (HMIS)
Homeless documentation
September 15, 2008 Resource Coordinator Training
Data Updates.
WEB TIMESHEETS Mindy Neissl Accounting Coordinator
WEB TIMESHEETS Mindy Neissl Accounting Coordinator
This is a template for a presentation that you can use to introduce your team to Harvest. You can customize the content of the slides. You’ll want to pay.
Presentation transcript:

 The Purpose of HMIS is NOT the generate Reports for your APR  The purpose of HMIs is to track a client’s progress through the Continuum of care from intake until permanent housing, and hopefully self sufficiency.  It is turning into THE PRIMARY DATABASE for Homeless Providers and Government departments that deal with Homeless not just HUD.

 Check you are at the correct Address › HMIS LIVE  › HMIS Training  › Make sure your username is correct.  First initial, Last name  John Smith = Jsmith  Your Password is Spelled Correctly  If you still have problems logging in please contact the HMIS Technician and he can reset your password.

 If you want to generate correct APRs your Data must be Correct.  If you run a report and you have clients in wrong programs/Grants then it was an error during DATA ENTRY.  If Garbage goes in Garbage comes out.  One of the most important Question is how do I get better data into the HMIS

 The HMIS Technician will provide Sample Data entry forms which are RECOMMENDED but not required  In order to make your Data Entry Person’s life easier you should use a Data Entry form that collects all the “Required” data elements for HMIS.  If the intake form is filled out at the point of intake it would be even better because you then have clients in front of you ready to answer the questions.  Intake forms are a lot easier than having to dig through the client’s file at the time of data entry.

 At the end of the Day Management is responsible overseeing their employees and making sure everything is done correctly.  In order to do this The HMIS Technician will be providing Monthly Reports on the number of clients entered and the number of times and employee logged in.  Management will also be Free to call HMIS technician and request Ad Hoc reports

 Each Agency has a signed MOU and a User agreement where they agree to data entry clients within 72 hours of intake.  Most Agencies do not have the staff time to do this and they take one day to enter all their clients.  It is crucial not to distance oneself from the HMIS because you forget how to do it.

 The HMIS Technician will provide you with Step By step instructions for Data Entry on SHP, HPRP, and ESG programs.  These are to help when you have not done any data entry in a while.  If you still need help always feel free to the HMIS Technician.

 Every Person should be instantiated as a Family even if they are only one person  ClientTrack requires the FamilyAcctID for some reports and workflows.  FamilyAcctID is only generated when you add a client to a family.  HPRP Reports will not work correctly if client is not added to a family.  ClientTrack now automatically Adds your client to a family but it is good practice to do it manually because this is not guaranteed to work on clients already in the system

 Required by HPRP  Must have a Start and End Date  Do NOT use Quick Services because you will not input all data necessary.  Not Required for SHP, ESG, CDBG, VA or PATH.  It is a good idea to keep track of services even if not required to have a good Idea of a client’s progress through the continuum of care.

 Permanent Supportive Housing is for people that have a disability and require Support services it is important to Document those disabilities as Barriers.  Do not use the Quick Services, as it does not ask you for Status which is a required field for Exit.  Be aware that if your target population is disabled you should probably be listing those disabilities.

 IN GENERAL.—The term `chronically homeless' means, with respect to an individual or family, that the individual or family— › (i) is homeless and lives or resides in a place not meant for human habitation, asafe haven, or in an emergency shelter; › (ii) has been homeless and living or residing in a place not meant for human habitation, a safe haven, or in an emergency shelter continuously for at least 1 year or on at least 4 separate occasions in the last 3 years; and › (iii) has an adult head of household (or a minor head of household if no adult is present in the household) with a diagnosable substance use disorder, serious mental illness, developmental disability (as defined in section 102 of the Developmental Disabilities Assistance and Bill of Rights Act of 2000 (42 U.S.C )), post traumatic stress disorder, cognitive impairments resulting from a brain injury, or chronic physical illness or disability, including the co- occurrence of 2 or more of those conditions.

 Your agency should already have a copy of the Work Orders, if you do not have one please let the HMIS Technician know and he will give you a copy.  They are important so that you and the HMIS Technician are aware of the progress of your issues and their progress.  Work orders will make sure everyone gets what they need in a timely manner.

 SHP- 50 % Completed  ESG- 25% Completed  HPRP- 25% Completed  VA-100% Completed  CDBG- 0%  Path - 0%  Estimated Date Completed for ALL Grants? End of Year.

 The HMIS Can generate an APR both the new one for grants whose operating year ends after july1st 2011 and the old one for all grants whose end date is before July 1 st 2011  The APR is dependant on the Data in the System and if you have bad data in the system Your APR will not be accurate

 Data Quality is perhaps the single most important thing you need to worry about for HMIS.  Good Data quality means accurate reports, and above all a good record of a client’s progress at least at your agency.  Regular data entry and following good practice standards improves Data Quality.

 If an Issue is never reported, nothing will ever be done about it.  If you have a problem it is likely someone else has it too.  There are some random errors that might happen once or twice, so try going back then forward to see if the error is fixed.  If an error keeps happening contact the HMIS technician. Using the Issues tool on ClientTrack helps us Deal with the Vendor.

 DSI makes ClientTrack  30 Employees  3 Main Programmers  Provide HMIS Services to half the nation  They are busy and take a while to respond.  If you have an issue that requires DSI’s Intervention be prepared to wait at least a month for it to be resolved.

 Any Materials provided during trainings are always available at the Housing Authority Website through the HMIS Link.  The HMIS Technician  The ClientTrack User guide is also available through The Help > Documentation option in ClientTrack