The backplane and crate infrastructure for the ATLAS Level-1 calorimeter processor (L1Calo) are presented, The L1Calo system is a relatively compact, high-

Slides:



Advertisements
Similar presentations
The backplane and crate infrastructure for the digital processors of the ATLAS Level-1 Calorimeter Trigger (L1Calo) are presented, The L1Calo system is.
Advertisements

ZH and ZR Connectors To introduce the ZH crimp style and ZR insulation displacement wire-to-board connector series.
SPACE PRODUCT ASSURANCE
Multi-Drop Sealed Connector System Introduction Fully sealed to IP66 & 67, the Multi-Drop Sealed Connector System uses cable-pierce technology to offer.
Build Your Own Future RC2 Serviceability. Build Your Own Future Safety and Ground Rules Before servicing, always remove A/C power from the unit and disconnect.
ZE Connector To introduce the new ZE wire-to-board, crimp style connector series.
VL Connector To introduce the VL wire-to-board and wire-to-wire, crimp style connector series.
Sales Presentation November 2010
NetSure™ RDB Series.
NetReachTM DSLAM XC Compact Series
MFS, MPO 4/8/12-Fiber connectors and Fan-Out assemblies.
Kit includes: New Sprocket New Upper Bracket New Stickers New Ground Wires Toaster Speed Conversion Kit.
Copyright © 2011 Rockwell Automation, Inc. All rights reserved. Insert Photo Here OneGear™ 7.2kV Motor Control Center.
MINI BOX. STANDARD BOX MAGNUM BOX SPINDLE ASSEMBLY.
JWPF Connector Wire –to-Wire Wire –to-Board
L. Greiner1HFT Hardware 09/23/2010 STAR Vertex-6 based PXL RDO board Design concept and items for discussion.
I have almost 20 years experience in the components and devices used in industrial control, instrumentation and automation applications. Before I came.
2008 Cadillac CTS With Original Antenna
Asis AdvancedTCA Class. What is PICMG? PICMG - The PCI Industrial Computers Manufacturer's Group Is a consortium of over 450 industrial computer product.
MICE Collaboration Meeting at Frascati, Jun 26~29, 2005 Iron Shield Mounting Design Stephanie Yang.
Uli Schäfer 1 JEM PRR Design changes Post-FDR tests FDR issues.
RPC Electronics Overall system diagram –At detector –Inside racks Current status –Discriminator board –TDC board –Remaining task.
Needle Bearing Product Overview
During a mains supply interruption the entire protected network is dependent on the integrity of the UPS battery as a secondary source of energy. A potential.
SH / SR Connectors PURPOSE: To introduce the SH crimp style and SR insulation displacement wire-to-board connector series.
1 Fiber Optics FIBER OPTIC PATCH PANELS. 2 Fiber Optics Just like our copper cable plant the fiber cable plant incorporates many of the same hardware.
STATUS OF THE CRESCENT FLEX- TAPES FOR THE ATLAS PIXEL DISKS G. Sidiropoulos 1.
Sales Training Outline 2006 Jeff Roye Product Manager DIN Enclosures 35 Royal Road Flemington, NJ
VELO upgrade electronics – HYBRIDS Tony Smith University of Liverpool.
ZTF Interconnecting Scheme Stephen Kaye
` April 28, 2004 When Gigabit Ethernet (1000BaseT as specified by IEEE 802.3ab) was developed utilizing all four pairs simultaneously and bi-directionally.
Mission to Mars 4 Wheel Rover Build Instructions April 2008.
An Introduction to Software Architecture
18 November 2010 Immanuel Gfall (HEPHY Vienna) SVD Mechanics IDM.
3M Electronics 3M CONFIDENTIAL © 3M All Rights Reserved. 3M™ MetPak™ HSHM Press-Fit B22 Connector Training Abhay Joshi – Global Product Marketing.
Mounting System for new modules Module AIT-PL-6. Mounting way The mounting system for new frameless modules AIT PL-6 was designed and is produced by Spanish.
Hardware proposal for the L2  trigger system detailed description of the architecture mechanical considerations components consideration electro-magnetic.
-Proprietary and Confidential-
SL1Calo Input Signal-Handling Requirements Joint Calorimeter – L1 Trigger Workshop November 2008 Norman Gee.
Tests of the Fully Loaded CSC Track Finder Backplane M.Matveev S.-J. Lee Rice University Alex Madorsky University of Florida 2 May 2005.
Front End Board (16 channels) Superlayer Cross Section Frontend Enclosure HV cap board HV cap Board Signals from chamber wires go to HV cap board to be.
Sageon Power Module Distribution Sageon Rack Trim Pieces.
HF Source Drivers Performance Observations and Recommendations Paul Debbins University of Iowa Nov. 10, 2004.
Mission to Mars 4 Wheel Rover Build Instructions April 2008.
Status report on the development of a TPC readout system based on the SALTRO-16 chip and some thoughts about the next step Leif Jönsson AIDA Meeting Vienna.
Terminal Splitters in a Cabinet December Terminal Splitters in a Cabinet The purpose of this presentation is to share our findings around the.
FLATPACK Rev.5 September 2002 Updated versions may be available.
PRELIMINARY VERSION Mechanical integration in the ESS Accelerator tunnel HENRY PRZYBILSKI.
News on FTK rack infrastructure A. Lanza – INFN Pavia FTK Italy meeting –
21 November 2003Jacques Lefrancois1 HOSTING ELECTRONICS AND CONNECTIVITY Role of calorimeter system: Level 0 trigger +  reconstruction +e/  id. Level.
RockOn! RockOn! Structure Build RockOn! 2009.
Programmable Logic Devices
K.Long/G.Barber Mice Tracker Mechanical Status CM20 Feb 08 1 Mice Tracker Mechanical Status Contents:- Tracker 1 Status Tracker 2 Status Further Hardware.
SPD II 1 for LV Power (AC/DC)
Baby-MIND Modules & Services
D. Breton, S. Simion February 2012
PID meeting SNATS to SCATS New front end design
HB RM prototypes Ianos Schmidt Aug 17, 2017.
Industrial Skills Fasteners & Hardware.
Rod adaptors for module tests Module positioning studies
Design of Distribution Feedbox at LHC P7
JWPS Connector Wire-to-wire and Wire-to-board
FIRST Long Island Presented by School-Business Partnerships of Long Island, Inc.
GLAST Large Area Telescope:
An Introduction to Software Architecture
OCP Engineering Workshop Rack & Power, Advanced Cooling Solutions, Data Center Facility
Manifold Topics Infra Mechanical and Thermal Team
Stoughton Parts Sales 2019 Customer Appreciation Event
Presentation transcript:

The backplane and crate infrastructure for the ATLAS Level-1 calorimeter processor (L1Calo) are presented, The L1Calo system is a relatively compact, high- performance real-time system with high channel density and interconnectivity between system modules, The design is based on a custom, monolithic 9U backplane populated completely with 2mm Hard Metric connectors, The high pin count and monolithic design present new challenges, including high insertion/extraction forces and long-term maintenance and repair of the thousands of exposed male backplane pins. Here we present the solutions we have found for dealing with these issues, as well as accessibility, infrastructure for the hundreds of connected cables per crate, and maintenance and repair over the lifetime of LHC. Abstract Services Mating forces Introduction Many high-performance real-time systems developed for LHC feature high channel density and large amounts of interconnectivity between modules. To achieve these high densities, system designers are turning to 2mm Hard Metric (HM) connector systems. 2mm HM connectors are widely used in industry and bus standards such as CompactPCI, and therefore provide a cost-effective solution. However, 2mm HM connectors introduce new problems for the system designer. With insertion forces of up to 0.75N per pin, a 9U module requires hundreds of Newtons to insert or remove. Unlike earlier backplanes using female DIN euro--connectors, the 2mm HM backplane connector consists of exposed male pins that are easliy bent and damaged, presenting serious long-term maintenance issues over the lifetime of LHC. High channel density and processing speed also require higher power consumption, making power distribution an important design issue. The ATLAS Level-1 Calorimeter trigger (L1Calo) group has adopted a common system crate architecture for the EM/Hadron cluster and Jet/Energy-sum processor subsystems that presents a near worst-case example in terms of these problems. We have developed integrated solutions for force reduction, integrated cable strain relief and power distribution that provide for accessibility and long term maintenance and repair. Elements of these solutions may be useful for other systems with similar issues. Maintenance and Repair High-Density Backplanes: Problems and Solutions S. B. Silverstein, Stockholm University, Stockholm, Sweden For the ATLAS Level-1 Calorimeter Trigger Collaboration Backplane and Crate References The processor backplane is a monolithic construction with 9U height, and 21 single-width module positions. It is populated almost entirely with 2mm HM connectors, with 1148 signal and ground pins to each processor module. The PCB is 4.9mm thick, with 8 signal layers and 10 ground planes, Up to 384 serial LVDS cable assemblies and two rear tranisiton modules system results merging connected to the rear side of the backplane. Three high-current DIN connector pins at the bottom of each module position deliver up to 20A of low-voltage (3.3V and 5V) current. The system is installed in CERN-standard Series 6000 LHC crates, which have been modified to accommodate our custom solutions for power distribution, strain relief, and insertion/extraction forces. With 1148 signal pins per module position, the nominal insertion force for a typical module is nearly 500N, and the extraction force over 400N. Because the PB is attached to extrusions at the top and bottom of the crate, module insertion and extraction will cause the backpane PCB to bow horizontally. The resulting pin misaligment adds significantly to the mating forces. To reduce backplane bowing, we use six vertical reinforcement ribs. They are manufactured from 5mm- thick brass (which matches the spacing between two adacent rows of 2mm HM connectors), and are fastened through the backplane to the top and bottom crate extrusions. Two retention bolts secure the ribs to the backplane at 1/3 and 2/3 of the backplane's height. This configuration dramatically reduces concave/convex bowing during module insertion/extraction with a maximum displacement of less than 1mm. Threaded holes on the back side of the ribs provide mounting points for the power bus bars and cable strain-relief system. IEEE-standard handles use leverage against the to the front crate extrusions to provide the necessary insertion/extraction force. For our 9U modules we have observed vertical flexing of the crate extrusions that cause the handles to slip, resulting in poor performance and accelerated wear. We have addressed the issue of wear by adopting solid aluminium handles. Furthermore, extrusion flexing can be reduced by securing the front- panels of inserted modules to the crate extrusions to provide vertical reinforcement. Finally, each module includes a guide pin to ensure correct alignment during mating. This reduces the force of initial contact, and protects the pins from damage. The backplane reinforcement system also serves as a mounting point for the cable strain relief system and the power distribution bus bars. The cable strain relief system provides secure retention for up to pair LVDS serial cable assemblies that provide the processor modules with input data. Vertical "forks" straddle the cables for one module position, and secure the connectors within the connector shrouds. A large, robust power bus bar assembly is located at the bottom of the backplane, and distributes 5V and 3.3V power to each of the 21 modules through three high current pins rated at 20A each. While the trigger system is not designed for hot swapping, care has been taken to make the ground pins make-first break-last to minimize the risk from an accidental live extraction. When signal pins become damaged, a repair and replacement procedure is critical. Tyco/AMP produces a toolkit (Part number ) that we have successfully used for field replacement of single connector pins, without removing the backplane from the crate. This kit works best for AMP brand connectors, whose pins are loaded into the front of the shroud and held in place by friction. Other connector brands such as ERNI are less suitable for field repair, since the pins are loaded from the back of the shroud, and are therefore less easily extracted. Nevertheless we have also succeeded in replacing several ERNI pins with the AMP toolkit with satisfactory results. For more extensive damage one needs remove the backplane and repiace entire connectors, most likely by an external company. The backplane and its hardware form a single unit that can be relatively easily removed and replaced for this purpose. (to be added)