FTOF – CABLE RUNS Joe Guerra. Terms/Definition FTOF – Forward Time of Flight PCAL – Pre-shower Calorimeter PMT – Photo Multiplier tube Panel 1A – Existing.

Slides:



Advertisements
Similar presentations
© 2006 BEI Technologies ENCODER, Installing the LN Linear Encoder Note: The following installation example is for demonstration purposes.
Advertisements

Installation. Indoor Unit Installation Typical Installation.
Click on this image to open the full PDF document.
EMB PAR, 23 nov P. Perrodo, LAPP, Annecy1 ATLAS EMB SERIE MODULE CABLING Experience started with three successive prototype modules (module 0) in.
Chromatography Lab. Chromatography The separation of components of a mixture. Paper Chromatography consists of placing a spot of color from something.
Typical Walk-in Closet with elfa® décor
We Design Innovative Bus Interiors LED Retrofit Systems Designed ForPretoria Hadley/Transmatic L-20 and Hadley/Transmatic L-20 Fluorescent Aisle Lighting.
Inti Lehmann University of Glasgow 27 June 2011 Status of the TOFs.
Colorado Space Grant Consortium Foam Core Class #05 Foam Core Class #05.
Forward Detectors and Measurement of Proton-Antiproton Collision Rates by Zachary Einzig, Mentor Michele Gallinaro INTRODUCTION THE DETECTORS EXPERIMENTAL.
G.Barber Mice Tracker Mechanical Progress Imperial Tracker Update Contents:- Components Station Layout Light Guide Map QA Patch Panel Alignment.
Long Multiplication What is long multiplication?
Don Lynch 9/15/05 HBD Safety Review 1 Mechanical Design And Installation Hadron Blind Detector (HBD) Don Lynch.
TP4-ENERSOL-TD/PV double function
CONSTRUCTING A FIVE CABIN LATRINE
STATUS OF THE CRESCENT FLEX- TAPES FOR THE ATLAS PIXEL DISKS G. Sidiropoulos 1.
1 Telecom Cabling Ladder racks systems and relay racks Ladder racks systems and relay racks.
ZDC Remote Handling System March 10, 2011 Project Status and Forward Planning Technical Implementation Group Meeting Paul Debbins University of Iowa.
1 Telecom Cabling Patch panels, cabinets and raised floors.
How to construct the draw string bag Some things you’ll need to make a bag.
The printed circuit board (PCB) design
Addendum to EDMS document “Instruction Manual for inserting the CMS ZDCs using the HXTC crane” In addition to the ZDC detectors in the TAN instrument.
Openergo A self-build rowing machine
VC Training Table Setup and Floating Agenda General –Air Supply Requirements Assembly –Assembling the System –Leveling the Table –Isolating.
DROP IN ANCHOR DETAIL COMMERCIAL SERIES LIFTS INSTALLATION MANUAL Drop In Anchor/COMMERCIAL SERIES.
Installation. Indoor Unit Installation Typical Installation.
Multiplying and Dividing Decimals by 10, 100, and 1,000
S. Lusin, T1 ESR, CERN 17 Sep 101 Totem T1 ESR 17 Sep 10 S. Lusin Observations from Electrical Inspection of T1.
SIP POU cooler Installation Guide. Getting Started The SIP 2000 can be easily installed in most POU coolers in just a few minutes. The tools needed are.
Framed Canopy Fitting Instructions Contents – 6- Angled frame fixing brackets 1 x handle pack 6 x self drilling tech screws 3 keys 1x door 6 x coach screws.
Some questions:  In which order cables will be put ?  Who, where will put PS signal cables in bundles ?  Which kind of cable binders: velcro or panduit.
CLAS12-RICH Mechanical Design Status-Report CLAS12 RICH Review September 5-6 th 2013 S. Tomassini, D. Orecchini1 D. Orecchini, S. Tomassini.
Natura Water Machine B and D Series 3 – Dispense tower plumbing kit Kit number Kit includes components used for both Natura B and Natura D series.
An Idea of Next Sci-ECAL Prototype for FNAL Beamtest Feb Sci-ECAL meeting S. Uozumi (Kobe)
Installing a single Dreamscreen Set unit in place and attach with 2 ½ “ screw. Do not tighten the screw yet, tighten just enough to keep from falling.
Proposal for the assembly of the PHOBOS ring counters (H.P. 3/20/98) I would like to propose and discuss with you an alternative layout and assembly procedure.
P:\ISO \Work Instructions\Assembly\Options\ARMADILLO SWEEPER OPTIONS\10X ARMADILLO SWEEPER OPTIONS MODEL: KIT-MFG-ENG SHDN DSL M&FS SWA.
Services in GIF++ A pictorial record of the work HV Cables LV cables DCS cables Signal Cables Ian Crotty 17 Dec 2014.
M. Takahashi, 21 January, 2016 Station Acceptance (SA)
G.Barber Mice Tracker Mechanical Progress Tracker Mechanical Progress Contents:- Station Space Frame Station Layout Light Guide Map Connectors Patch.
Multiplication and Division of Whole Numbers Let’s start by multiplying numbers that contain 2 or more digits by a single digit…
Installing Hinges Created By M.Martin 9/05. Mark the hinge position on the door edge 150mm from the top of the door and 225mm from the bottom of the door.
XR621 Drive Hose Update Kit. Removal Turn off Battery dis Drain hydraulic tank Remove both rubber lines under chassis and discard. Remove and discard.
RICH2 support and cooling mechanics status update Massimo Benettoni July 30,
Motor Propeller wrench Screw Nut (2) Cylinder top Tiny screw IGNORE:
Meeting at Chooz PMTs Mechanical support on the Buffer. Updates. Enrique Calvo Alamillo
Jigs A Definition When manufacturing a product, a jig is a custom-made tool used to control the location and/or motion of another tool. Why do we use jigs?
Potting Bench Plans Matt Howell Brooks County High School ___, Georgia Georgia Agricultural Education Curriculum Office, August, 2004.
WP F/L Dom production. KM3Net meeting 2012 Erlangen - Edward Berbee - Nikhef22/06/20121.
RockOn! RockOn! Structure Build RockOn! 2009.
K.Long/G.Barber Mice Tracker Mechanical Status CM20 Feb 08 1 Mice Tracker Mechanical Status Contents:- Tracker 1 Status Tracker 2 Status Further Hardware.
Potting Bench Plans Matt Howell Brooks County High School Quitman, Georgia Quitman, Georgia Georgia Agricultural Education Curriculum Office, August, 2004.
Blue Access Technologies
This picture shows what the wiring of a new alternator looks like
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
Additional muon stations for the Upgrade of the Elevator Regions in the ATLAS Muon Spectrometer. Integration issues Denis Diyakov, Alexander Seletskiy,
First of all we will remind some numbers:
LST Module Installation
The Leica Mount for a CP 4500 IMPORTANT NOTES
Mounting a BalanceBox®650 to a brick wall
Ballista Project 2 120mm Axle hole 3 Nails 1 200mm
Switch Blocks check a value and choose a path based on that value
The Leica Mount for a CP 4500 IMPORTANT NOTES
General wiring procedure for a new instrument
Reader Swap out Guide.
Add Subtract Multiply Divide
Add Subtract Multiply Divide
Metalwork Threading.
Omega Selection Center
Presentation transcript:

FTOF – CABLE RUNS Joe Guerra

Terms/Definition FTOF – Forward Time of Flight PCAL – Pre-shower Calorimeter PMT – Photo Multiplier tube Panel 1A – Existing panel to be carried over from CLAS6. Panel 1B – New Panel comprised of 62 scintillators and 124 PMT’s. Sits +Z, directly in front of panel 1A. Panel 2 – New panel consisting of reused scintillators and PMT’s from the current panel 2 in CLAS6. Is comprised of 5 scintillators and 10 PMT’s.

Purpose This is to serve as a design document on the FTOF cable routing. In this document, thought process, idea’s, and criticism’s can be detailed on the routing of the FTOF cabling.

Design Considerations How to bundle and strain-relief the signal and HV cables along the sector frames for panel -1a and panel- 1b? Will all cables be the same length? How to strain relief the panel-1A cables and the PMT so that they do not put torques on the dividers? How to strain-relief the panel-1b cables at the PMT so that the connectors on the pig-tails are not stressed? How to strain-relief the cables at HV patch panels so that we have access for disconnects and so there are no stresses on the cables or connectors?

Design Considerations Will the cable runs go behind the frame beams or on the sides of the frames? Do we need to add additional places for strain- relief on either the panel-1a or panel-1b frames? How do we keep the cable bundles in position? We will need to make sure that we can get to the disconnect points of the panel-1b pigtails for servicing. We need to be able to read the cable labels at the PMT end and the patch panel end.

Design Criteria There are 62 PMT’s per each side of panel 1B. There are 23 PMT’s per each side of Panel 1A. There are two signal and one HV cables per PMT. HV Cables – 5mm diameter each Signal Cables – 4mm diameter each

AVAILABLE AREA’S

Area’s Available Between LTCC and Panel 1B – 2.480in²* Between Panel 1B and 1A – 6.448in² Between Adjoining Panel 1B’s – 4.308in² Between Panel 1A and PCAL – in² *NOTE: LTCC measurement not confirmed.

SPACE REQUIRED: PANEL 1A – Signal: 23 PMT’s * 2cables/PMT’s * 5mm * 5mm = 1150mm² = 1.783in²*** HV: 23 PMT’s * 1cable/PMT *6mm*6mm = 828mm² = in²*** PANEL 1B – Signal: 62 PMT’s * 2cables/PMT’s * 5mm * 5mm = 3100mm² = 4.805in²*** HV: 62 PMT’s *1cable/PMT’s *6mm *6mm = 2232mm² = 3.460in²*** ***NOTE: Required space estimated under assumption that there will be no bundling of cables.

AVAILABLE AREA’S Panel 1B – HV Cables Available:2.480in² Used: 3.460in² Panel 1A – Cables Available:13.785in² Used:3.066in² Panel 1B – Signal Cables Available:6.448in² Used: 4.805in² NOT USED

Cable Attachments/Relief Panel 1B- Top (HV CABLES)

McMaster Carr PN: 7572K13 Fabricated Bracket **NOTE: Brackets may be installed opposite of each other on opposite side of panel. This will be done for adjoining sector clearance.

Cable Attachments/Relief Panel 1B – Bottom (SIGNAL CABLES)

HV Patch Panels PANEL 2

Cable Routing -Panel 1A - Follows current routing plan

Cable Routing -Panel 1A/B-

Cable Routing -Panel 1B- Sectors 2 and 3

Cable Lengths

Answering Questions: Q: How to bundle and strain-relief the signal and HV cables along the sector frames for panel -1a and panel-1b? A:By using brackets, they cables will be routed either above and or below the prospective panel. Q:Will all cables be the same length? A: No. This would leave large lengths of cables of cables that would need to be handled/stored.

Answering Questions: (cont.) Q:How to strain relief the panel-1A cables and the PMT so that they do not put torques on the dividers? A: By running the cables in the same fashion that they are currently. Also, by securing them via zip ties to the panel 1A scintillator brackets. Q: How to strain-relief the panel-1b cables at the PMT so that the connectors on the pig-tails are not stressed? A: By using wire reliefs secured to the panel 1B backing structures.

Answering Questions: (cont.) Q:How to strain-relief the cables at HV patch panels so that we have access for disconnects and so there are no stresses on the cables or connectors? A: Attach the cables to the perforated tube steel that attaches to the Panel 2 Support frame Q: Will the cable runs go behind the frame beams or on the sides of the frames? A: Behind and in front of.

Answering Questions: (cont.) Q: Do we need to add additional places for strain-relief on either the panel-1a or panel-1b frames? How do we keep the cable bundles in position? A: Yes, we will add the holes onto 1B that are required for the bottom strain relief. We will use simple drilled holes and self tapping screws for attachment. The bundles will be held in position by friction due to the pressure from securing. Q: We will need to make sure that we can get to the disconnect points of the panel-1b pigtails for servicing. A: The pig tails will remain in front of the panel. After they are strain relieved and secured to the cable, they will then travel on the underside

Answering Questions: (cont.) Q: We need to be able to read the cable labels at the PMT end and the patch panel end. A: This will be done prior to installation via a sticker marking system.

Questions?