SASO certificate for Saudi Arabia Power-Plant projects Stephan Ghys, Logistics Manager Research-Cottrell Dry Cooling CCBLA – Antwerp, 24 Sept 2013.

Slides:



Advertisements
Similar presentations
Delivering logistics solutions. Agents Network Strong presence in CHINA & Far-East Europe especially Italy/ U.K/ Germany/ France/ Spain/ Sweden &
Advertisements

Customer Relation Management System Multi Environment Solutions.
Antero Punttila Analyzing most typical energy saving measures Energy Efficiency of Steam and Condensate Systems Antero Punttila, Motiva Oy.
Export / Import International Trade Brandon Walcutt.
Chapter 9: Performance of Import and Export Contract
Heating, Ventilating, and Air-Conditioning
CHAPTER 9 SHIPMENTS CLEARANCE & FORMALITY IN CAMBODIA I. FORM & FORMALITY OF SHIPMENT. Form of Shipment: -Duty Free shipment -Duty shipment. Formality.
COMPANY CONFIDENTIAL GLOBAL INFRASTRUCTURE X PROCESS EQUIPMENT X DIAGNOSTIC TOOLS April 30, Company Overview SPX Cooling Technologies.
1 AEE PIEDMONT CHAPTER Smart CHP Solutions for kWe.
An independent heating system consists of: 1) wall-mounted boiler flue 2) manifold of copper and its connection to the boiler 3) internal boiler chimney.
Thermal Power Station Plant. Introduction 150 MW Thermal power station plant, produce 450t/hr steam at full load The max steam pressure is 150 bar with.
PRESENTATION OF INDUSTRIAL TRAINING ON
SBREFRA Presentation Wayne Penrod Executive Manager, Environmental Policy Sunflower Electric Power Corporation.
Content of the Presentation
Turbinator Electric CHP Team of Ammonia Based Fertilizer Production
1 Heuristics 12 Oct 12 Homework: Problem 11.1 Turton.
TopDrive: RP3 Thermal Management of Battery Module Unit of Electronics Integration and Reliability Department of Electronics.
Generation and Control of Vacuum in Furnace
Group Meeting #1 January 29 th, 2013 Michael Bentel Jeremy David Erik Peterson Arpit Shah 1.
Industrial Ventilation - A major control measure Dr. AA, UTM.
Introducing Belliss USA Inc.
“Energy Efficiency Guide for Industry in Asia”
Steam Power Plant.
Exporting and Importing Procedures
May Tektronix Lori Andersen Director, Americas Sales Operations Teresa Buonocore WW Export June 5, 2006 Company Introduction & Overview.
Steam condensers Functions: Lowers back pr. of turbine exhaust Enables recovery and recirculation of feed water Enables the removal of air and non- condensable.
UTSW Thermal Energy Plants, Power Generation and Electrical System What do we do to meet the Emission Reduction, Energy usage Reduction and Electrical.
Solar Energy Technology for Commercial Facilities John Archibald American Solar, Inc. Association of Energy Engineers Baltimore Chapter.
Cogeneration.
Heat exchangers The device at which heat exchange between two fluids at different temperatures and separated by a solid wall occurs is called heat exchanger.
Efficient Use of Biogas, Sewagegas and Landfillgas Combined Heat- and Power Generation Schnell Dual Fuel Technology SCHNELL Motoren AG Hugo-Schrott-Straße.
Steam Power Station Presented By Ashvin G. Patel Asst. Prof. (E.E.)
 Install new air cooled high efficiency screw chiller (variable speed)  Install new fan coils with ECM motors and low temperature heating coils and proper.
Efficient Use of Biogas, Sewagegas and Landfillgas Combined Heat- and Power Generation Schnell Dual Fuel Technology Schnell Zündstrahlmotoren AG & Co.
Thermodynamics of Industrial Cooling Towers
Classification of Commercial and Regulatory Documents
Solar cooling systems.
GEA Power Cooling Systems, Inc. On-Line Performance Monitoring OSIsoft User Conference 2004 Presented by: Dave Sanderlin VP Technology GEA Power Cooling.
Michael Owen Univ. of Stellenbosch/Dept. M&M Eng./STERG
Overview of Distributed Generation Technologies June 16, 2003 Harrisburg, PA Joel Bluestein Energy and Environmental Analysis, Inc.
Operation and Maintenance
GEOTHERMAL POWER PLANT
Air-preheater for Conservation of Flue Gas Energy P M V Subbarao Professor Mechanical Engineering Department Minimize Final Exhaust Gas Temperature….
Seminar on Analysis of the Effect of Dirt on the Performance of Engine Cooling System Presented by Gaurav Shukla.
JC Equipments Pvt. Ltd Heat Exchanger Manufacturers
Plant Utility System (TKK-2210) 14/15 Semester 4 Instructor: Rama Oktavian Office Hr.: M-F
AIM :- TO STUDY ABOUT STEAM POWER PLANT
Idaho National Engineering and Environmental Laboratory Energy Systems Research & Testing Activities at INEEL Greg Mines March 2003.
Generating Stations. Bulk electric power is produced by special plants known as generating stations or power plants. Depending upon the form of energy.
Export Processing – Step By Step 2 Step I Seller contacts a Buyer after studying the market 3.
A Seminar On Suratgarh Super Thermal Power Station (Raj.)
SURATGARH SUPER THERMAL POWER STATION
THERMAL POWER PLANT.
Some general guidelines and practical considerations F.E.P. INTERNATIONAL TRADERS, INC.
Biscuit baking process and engineering
CERTIFICATE This is to certify that the project work entitled “Different Power Plants“ Is being submitted by Name of the student : Enroll no.: Patel Akshaykumar.
I Need A Space Heating System Let’s Look At A Central Steam Plant Option.
CHAPTER SIX THE BUSINESS OF FOREIGN TRADE. Facilitating international trade is one of the most important activities of a bank’s international department.
Drying and pelleting digestate
SATURN – GAS TURBINES POWER GENERATING AND GAS COMPRESSOR SETS
Project Ⅲ Task 1 Export Procedure ( 3 ). Market Research Any exporter who wants to sell his products in a foreign country or countries must first conduct.
International Documents Bill of Lading – Acknowledges that the goods have been placed on board a vessel for delivery to a specific destination – Specifies.
ATHCO-Engineering A/S
. Level 3 Air Conditioning Inspections for Buildings
Optimization of the Cooling System Operation for CCGTs
THE BUSINESS OF FOREIGN TRADE
POWER PLANT THERMAL POWER STATION.
Behind every great leader company there was an even greater logistician…. Fast Logistics L.L.C Freight Forwarding, Transportation, Custom Clearance, Logistics.
Task 8 Describe the documentation required for particular applications (such as design briefs, specification sheets, request for change orders).
Customised solutions for the logistics industry
Presentation transcript:

SASO certificate for Saudi Arabia Power-Plant projects Stephan Ghys, Logistics Manager Research-Cottrell Dry Cooling CCBLA – Antwerp, 24 Sept 2013

Introduction to Hamon  International, leading engineering & contracting company, with headquarters in Belgium  Founded in 1904  Listed on Brussels stock exchange (Euronext) since 1997  Among the leaders in its niche markets  Well established business with strong reputation and large installed base

International organisation  A worldwide industrial network with approx. 40 subsidiaries: branches, representative offices, licensees, and joint-ventures.  A presence in 25 countries, spread over 5 continents.  More than references in 90 countries.

Air Quality Systems Heat Recovery Dust emission control Flue gas treatment (deNOx, deSOx, …) Chimneys Silos Liners Ducts Cooling Systems Natural draft Mechanical draft Wet/dry systems Process Heat Exchangers Aircoolers Finned tubes Hairpin HE Sales 2012 Major Player in engineering & contracting

Hamon Thermal Wet Cooling Natural draft CT Fan assisted natural draft CT Mechanical draft CT Plume abated (Wet/Dry – Hybrid) Research-Cottrell Dry Cooling Indirect – jet condenser Indirect – surface condenser Direct – air cooled condenser (ACC) Direct – natural draft air cooled condenser Cooling Systems

PP 10, Saudi Arabia, 10 X 350 MW Research-Cottrell Dry Cooling SECNo. of Streets (per ACC)5 Power Generation10 units each of 350 MWNo. of Modules (per ACC)20 Thermal Duty10 ACC each of 299 MWFan36 ft diameter Total Steam Flow (per ACC) kg/sRating of Fan Motor185 kW Turbine back pressure351 mbarAtmospheric pressure mbar Air Temperature50 °CDimension ACC (w x l)12,9 m x 14,9 m Noise Power Level119 DB(A)Delivery and completion2013 and 2014

PP10 + PP12  PP10 : Volume in containers (FOB): 824  PP10 : Volume in shipments : 180  PP12 : 340 cont + 60 shipments

Starting Point 1.Contractual condition: « Conformity certificate with Saudi standards, issued and signed by inspection agent assigned by SASO. » (Saudi Arabian Standards Organization.) 2.L/C condition: idem + « The agent is INTERTEK. »  Sept 2012: meeting INTERTEK France + SGS Belgium

Registration How did we obtain the SASO Certificate of Conformity ? Step 1. Registration of products  All products  Per supplier or per product ?  Divided into 25 families: gearbox, motor, fans, bundles, valves, …  PO: ‘Supplier has to deliver all documentation necessary for obtention CoC enabling product to be imported in S-A.’  ISO-certificates – Test reports – Techical data sheets

Step 2. Inspection of products  When? Pre-shipment, in crates  What? Country of Origin + TAG-plate markings  Important:  Irremovable engravement of Country of Origin on each product  Only 1 Country of Origin per crate Inspection

Operation In practice?  Supplier: Cargo is ready  RCDC: « Request for Certification + Declaration of Conformity » + ProForma Invoice + Packing List  SGS: Visual Inspection of Tag-plates + Country of Origin  SGS: Draft + Issue Certificate of Conformity

Conclusion Essential:  Start on time !  Be strict to avoid blocked containers  Country Of Origin markings  Partnership