Gas Turbine Engine Project Materials Joint Test Protocol Document Principally Prepared By Jerry Schell GE Aircraft Engines Additional Input From GTE OEMs.

Slides:



Advertisements
Similar presentations
Kinetic Metallization
Advertisements

1 GEO Implementation Plan Task Team (IPTT) GEOSS 10-Year Implementation Plan Reference Document.
HCAT Propeller Hub Chrome Plate Replacement Program
H HCAT Propeller Chrome Plate Replacement Program Edward Faillace - Steve Pasakarnis - Aaron Nardi Hamilton Sundstrand- Engineering August 29, 2001.
Issues Related to Qualification of HVOF Coatings on Landing Gear For fatigue and hydrogen embrittlement, the issue is the impact of the coating deposition.
Non-Line of Sight Hard Chrome Alternatives Project April 2001 Joe Kolek AFRL/MLQL (937)
1 HCAT LANDING GEAR JTP FATIGUE PROGRAM P. E. Bretz J. Schell Metcut GEAE December 2000.
FINAL REVIEW Landing Gear JTP Wear Test Analyses J.D. Schell GE Aircraft Engines HCAT Toronto Meeting Crowne Plaza Hotel August 28-30, 2001.
DoD Teaming Group E2C2 FST Obsolescence Management Team May 2, 2001
Aerospace Use Of Hexavalent Chromium And Soluble Nickel In Relation To REACh 7th October 2009 From a combined Goodrich and Rolls-Royce review of the implications.
WC HVOF Advantages Over Chrome Electroplating Matt Leahey RPI: Master’s Project Fall 2009.
Draft JTP for Hydraulic & Pneumatic Actuators National Technical Systems / Elwin Jang / December 2000.
Replacement of Hard Chrome Plating Program Review Meeting
A Hard Chrome Alternatives for Hydraulic Components Program established to assist United States Air Force Airborne Accessories Directorate Avionics and.
HCAT PROGRESS REPORT FEBRUARY 2002 GOODRICH LANDING GEAR HCAT STATUS CONDUCTING THREE FULL SCALE TESTS: 1. Fatigue of entire MLG - Dash-8 Series
Cost/Benefit Analysis Conducted at Landing Gear Repair Facility Analysis conducted by Concurrent Technologies Corporation using Environmental Cost Accounting.
Navy Landing Gear Perspective Tribaloy-Treated F/A-18C/D
Atmospheric Corrosion Testing Comparison of Electrodeposited Hard Chrome to HVOF WC/17Co and Tribaloy 400 Three-Year Atmospheric Exposure Exposures Conducted.
OC-ALC Chrome Plate Reduction 20 FEB 2002 OKLAHOMA CITY AIR LOGISTICS CENTER Johnny Tsiao OC-ALC/LPARR (405) I n t e.
UNCLASSIFIED 1 FileName.pptx UNCLASSIFIED Date: 6/3/2014 Status of Cold Spray Repair Efforts for Magnesium Transmission Components Presented by: Names:
Keith Legg Summary of coating integrity and planned testing HCAT Program Review August 2001 Toronto.
Project Status as of 1 April 2003
NDT of HVOF Coatings John Sauer Sauer Engineering HCAT Toronto September 25 th, 2002.
1 CHROMIUM PLATING REPLACEMENT AT SIKORSKY AIRCRAFT ROBERT GUILLEMETTE JOHN BARTALOTTA MATERIALS AND PROCESSES ENGINEERING APRIL 26, 2001.
7A1 Friction & Galling Test
POLLUTION PREVENTION SUB-IPT HCAT MEETING April 01 Long Beach, CA HARD CHROME PLATING ALTERNATIVES Mary Gilman Boeing C-17 Pollution Prevention Project.
Hard Chrome Alternatives Team Joint Group on Pollution Prevention Propulsion Environmental Working Group PROGRAM REVIEW MEETING April 2001 Long Beach,
Keith Legg Overview of planned additional work HCAT Program Review Long Beach April 2001.
AVS Repair, Alteration and Fabrication Team (RAFT) Results
GE Aviation. 2 Overview GE - Aviation GE Aviation A leading manufacturer of jet engines for civil and military aircraft and global provider of maintenance.
D S Rickerby Rolls-Royce plc Derby, UK
Corrosion Testing Acknowledgements to:
HWG-10 Presentation to the FAA Aging Aircraft Workshop Presentation By: Jon Haag Chairman of HWG-10.
Hard Chrome Alternatives Team Joint Group on Pollution Prevention Propulsion Environmental Working Group PROGRAM REVIEW MEETING August 2001 Toronto,
Jeff Moorman Hydraulic Systems and Flight Control Actuators (301) Navy Rod Seal Testing Project Status as of 1 Sept 2002 Results from Rod Seal.
A Hard Chrome Alternatives for Hydraulic Components Program established to assist Oklahoma City Air Logistics Center Airborne Accessories Directorate Avionics.
Hard Chrome Alternatives Team Joint Group on Pollution Prevention Propulsion Environmental Working Group PROGRAM REVIEW MEETING 1-2 April 2003 San Diego,
TESTING STANDARDIZATION Standardization of Testing and Process Evaluation John P. Sauer SAUER ENGINEERING December 13, 2000.
EPA DOE DoD Strategic Environmental Research and Development Program Improving Mission Readiness Through Environmental Research SERDP Program 1152 DACA72-00-C-003.
Keith Legg Test Status Overview HCAT Program Review NASA, Florida Dec 13,14, 2000.
Revised Draft JTP for Hydraulic & Pneumatic Actuators National Technical Systems / Elwin Jang / April, 2001.
Transportation Improvement Program Status and Update.
ORENDA AEROSPACE CORPORATION PROGRESS REVIEW MEETING THE CANADIAN HARD CHROME ALTERNATIVES TEAM (HCAT) JOINT PROGRAM HVOF PROCESS DEVELOPMENT, EVALUATION.
Subcommittee 20 Supply Chain Management Report for Subcommittee 18 January 2015.
WHAT IS THERMAL SPRAYING ? It is a molten or a semi-molten state process in which impacting particles land on a prepared substrate or an underlying lamella.
Status of HCAT Integrity/Fatigue Testing John P. Sauer Sauer Engineering February 20th, 2002.
Keith Legg Overview of fatigue/spalling tests HCAT Program Review Long Beach April 2001.
Progress to Date PPPL Advisory Board Meeting May 20101NSTX Upgrade – R. L. Strykowsky CD-0 Approved February 2009 The NSTX Upgrade Project organization.
A Hard Chrome Alternatives for Hydraulic Components Program established to assist Oklahoma City Air Logistics Center Airborne Accessories Directorate Avionics.
Hard Chrome Replacement NADEP Jacksonville February, 2002 Michael Linn Materials Engineering.
Active Corrosion Process Nisource – COH/CKY. Objectives  Understanding the terminology –Active Corrosion –& Suspected Areas of “Active Corrosion”  Developing.
Keith Legg Outstanding technical issues HCAT Program Review August 2001 Toronto.
ORENDA AEROSPACE CORPORATION PROGRESS REVIEW MEETING THE CANADIAN HARD CHROME ALTERNATIVES TEAM (HCAT) JOINT PROGRAM HVOF PROCESS DEVELOPMENT, EVALUATION.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Abrasion Testing of Critical Components of Hydrokinetic Devices Monty Worthington.
Keith Legg Clean Dry-Coating Technology for ID Chrome Replacement SERDP Project # 1151 HCAT Program Review Long Beach April 2001.
Fort George G. Meade KEMRON PBC Sites Near-Term Deliverables Update Operable Units 1, 3 and 5 Restoration Advisory Board Meeting March 17, 2011 KEMRON.
Gas Turbine Engine Project Materials Joint Test Protocol Document Principally Prepared By Jerry Schell GE Aircraft Engines Additional Input From GTE OEMs.
HVOF CONCERNS Ogden Air Logistics Center. HVOF CONCERNS HVOF CONCERNS Hill AFB concerns 0Thick Coatings 0Spalling 0Corrosion 0Spraying Parameters Sensitivity.
Keith Legg Plasma spray ID coatings HCAT Program Review August 2001 Toronto.
Subcommittee 20 Supply Chain Management Report for Subcommittee 18 June 2015.
Hard Chrome Alternatives Team Joint Group on Pollution Prevention Propulsion Environmental Working Group PROGRAM REVIEW MEETING September 2002 Toronto,
Thermal Spray Coatings Asst.Prof.Dr. Ali Sabea Hammood Materials Engineering Department Materials Engineering Department Faculty of Engineering Faculty.
PRESENTED BY : AJIT BEHERA National institute of technology, Rourkela.
Green Line Extension Project
Assembly Design & Documentation
Industry Numbering Committee (INC) Report to the NANC
Implementing the Transportation/Land Use Connection Program
Potential Milestones A timeline to finish in one year
TGi Final Report for the September 2002 Session
Float Equipment API Spec 10F
Presentation transcript:

Gas Turbine Engine Project Materials Joint Test Protocol Document Principally Prepared By Jerry Schell GE Aircraft Engines Additional Input From GTE OEMs and DoD Repair Depots

Component Alloys Seven alloys selected for technical evaluation IN718, INC901, AM355, A286, 17-4PH, 4340, 9310

Coating Compositions to be Investigated in Project HVOF Process Air Plasma Spray Process WC/17CoWC/17Co Cr 3 C 2 /(20)NiCrCo/28Mo/8Cr/2Si* Co/28Mo/8Cr/2Si*Co/28Mo/17Cr/3Si** * Tribaloy 400 ** Tribaloy 800

Materials JTP Structure FIVE MAJOR TASKS: 1. Spray process optimizations 2. Fatigue 3. Wear and friction Fretting tests, carbon seal tests 4. Corrosion tests 5. Producibility tests - Stripability- Grindability - Assembly/Disassembly (This item could potentially be removed from JTP

Current Status of Materials JTP n Jerry Schell completed coatings optimization work on HVOF Tribaloy 400 and Tribaloy 800 at Hitemco in October 2001 n Hitemco has initiated deposition of T400, T800 and WC/Co (optimized in landing gear project) onto 350 fatigue coupons n Southwest United Industries to initiate deposition of hard chrome onto 162 fatigue coupons in early March n Remaining fatigue coupons have been fabricated; deposition awaiting optimization studies

Issues n Navy provided additional comments to MJTP in August 2001 n Jerry Schell assigned to special Navy project to implement PVD coatings onto turbine blades in T64 engine in November; expected to run through March 2002 Current Actions n Discussion held with Jerry Schell to address issues raised by Navy; another draft of MJTP to be prepared by late February n Meeting to resolve all outstanding issues and finalize MJTP was held on 19 February before HCAT Meeting n No-cost extension to contract with GEAE issued by Geo- Centers Should have extensive materials test results by time of August/September HCAT meeting