Project Management Considerations B. Nelson US ITER TBM Meeting INEL August 11, 2005.

Slides:



Advertisements
Similar presentations
A Short Course in Project Management
Advertisements

Managing Project Scheduling. What is Project Scheduling? The process of: – defining project activities – determining their sequence – estimating their.
Introduction to Project Management Chapter 6 Managing Project Scheduling Information Systems Project Management: A Process and Team Approach, 1e Fuller/Valacich/George.
NEES Project Management Workshop June 16 June 18 1 Segment 2.
Project Management Process Project Description Team Mission/ Assignment Major Milestones Boundaries Team Identification Measures of Success Roles & Responsibilities.
Project Management Session 7
Project Execution.
Project Management Process Project Description Team Mission/ Assignment Major Milestones Boundaries Team Identification Measures of Success Roles & Responsibilities.
How to integrate the parts of your project to achieve success.
© 2006 ITT Educational Services Inc. SE350 System Analysis for Software Engineers: Unit 6 Slide 1 Chapter 5 Initiating and Planning Systems Development.
From Research Prototype to Production
NCSX Management Overview Hutch Neilson, NCSX Project Manager NCSX Conceptual Design Review Princeton, NJ May 23, 2002.
BROOKHAVEN SCIENCE ASSOCIATES National Synchrotron Light Source II Project Management Jim Yeck Deputy Director (Project Management)
Task: Copyright © 2003 PM tec, Inc; D. Sankey; D. Padelford. All rights reserved. 1 Fast Start For Projects  Electric Dipole Moment Project Facilitator:
Certification and Accreditation CS Phase-1: Definition Atif Sultanuddin Raja Chawat Raja Chawat.
BROOKHAVEN SCIENCE ASSOCIATES National Synchrotron Light Source II Project Management Jim Yeck NLSL II Deputy Director (Project Management)
OFFICE OF SCIENCE 1 3. Cost Estimate Gines, Fisher 2.Are the estimated cost and proposed schedule ranges realistic, consistent with the technical and budgetary.
Management & Development of Complex Projects Course Code - 706
DEFINING THE PROJECT CHAPTER 4.
Lecture 11 Managing Project Execution. Project Execution The phase of a project in which work towards direct achievement of the project’s objectives and.
Lecture 6. Review of Lecture 5 Company strategic planning: mission and objective statements and competitive strategy. Planning Methods: Top-down, Bottom-up.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
Executive Session Director’s CD-3b Review of the MicroBooNE Project January 18, 2012 Dean Hoffer.
Executive Summary Target Deployment – January 4, 2005 Actual Deployment – December 22, 2004.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
LBNE Working Group Meeting December 20, :00– 5:00 PM Snake Pit.
Scope Management Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall Chapter 5 Learning Objectives After completing this chapter,
Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall o P.I.I.M.T o American University of Leadership Ahmed Hanane, MBA, Eng, CMA, Partner.
NCSX NCSX Design Review Guide May 27, 2005 Wayne Reiersen NCSX.
DOE Order 413.3A Program and Project Management for the Acquisition of Capital Assets Catherine Santana Deputy Director, Project Management Systems, OECM.
Pre-Project Components
Develop Project Charter
Progress to Date PPPL Advisory Board Meeting May 20101NSTX Upgrade – R. L. Strykowsky CD-0 Approved February 2009 The NSTX Upgrade Project organization.
PU-PPPL Earned Value Management System Overview Thomas Egebo October 4-6, 2011 Princeton University Plasma Physics Laboratory EVMS Certification Review.
Fermilab Presentation Greg Bock, Pepin Carolan, Mike Lindgren, Elaine McCluskey 2014 SC PM Workshop July 2014.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
NCSX Systems Engineering Management Plan Peer Review Bob Simmons May 15, 2003.
1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.
Mark Reichanadter LCLS October 9-11, 2007 LCLS BCR Overview and EIR LOIs Project Progress / Status Revised Project Baseline.
Power Upgrade Project SNS September 21-22, TBM Cost Estimate Cost Estimate Schedule Approach Tom Mann October 27, 2005.
Strykowsky 1Project Review November 2, 2005 NCSX Project Review November 2, 2005 Cost and Schedule Ron Strykowsky.
1 Project Management C13PM Session 2 Project Initiation & Definition Russell Taylor Business Department Staff Workroom
Illuminating Britelite’s Internal Services for Success Strategy for Process Improvement.
September 10, FY 2003 Plans Bob Simmons. September 10, Introduction Overview of Project and Engineering Plans Project Plans Engineering Plans.
UCLA - March 8, 2006 US TBM Cost Estimate Status March 8, 2006 Tom Mann.
Nadine Kurita LUSI DOE Review July 23, 2007 PMCS 1 Project Management Cost and Schedule Nadine Kurita ANSI/EIA-748-A Standard.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
1 Chapter 11 Planning. 2 Project Planning “establishing a predetermined course of action within a forecasted environment” “establishing a predetermined.
Strykowsky 1Office of Science Review August 15, 2007 Office of Science Project Review NCSX August 15-17, 2007 Cost and Schedule Ron Strykowsky.
Highlights of US ITER TBM Technical Plan and Cost Estimates (and Impact of International Collaboration) Mohamed Abdou and the U.S. Team TBWG-17 Presented.
Copyright 2012 John Wiley & Sons, Inc. Part II Project Planning.
DOE Review of LARP – Feb 17-18, 2014 DOE Critical Decision Process Ruben Carcagno February 17,
Cost and Schedule Breakout Session Paul Weinman Pacific Northwest National Laboratory.
WEEK 3 Project Planning.
NCSX Strykowsky 1Independent Project Review (IPR) June 8-9, 2004 NCSX Project Review June 8-9, 2004 Cost, Schedule, and Project Controls Ron Strykowsky.
Cost and Schedule Paul Weinman Pacific Northwest National Laboratory.
© 2008 Prentice Hall6-1 Introduction to Project Management Chapter 6 Managing Project Scheduling Information Systems Project Management: A Process and.
Camera PDR/CD1 Planning 19 September 2008
Project Management W. J. Foyt
ENGR 281 Engineering Scholars Program Project Management Life Cycle Overview K. F. Reinschmidt J. L. Frank / Marathon Ashland Petroleum LLC Chair in.
Systems Analysis and Design in a Changing World, 4th Edition
Business System Development
Project Management.
DEFINING THE PROJECT CHAPTER 4.
Project Management Chapter 11.
DOD’S PHASED SYSTEM DEVELOPMENT PROCESS
US TBM Cost Activity Tom Mann December 12 – 14, 2005.
Project Management Considerations
Definition of Project “An organized endeavor aimed at accomplishing a specific non-routine or low-volume task.” Definition of Project Management “The.
Presentation transcript:

Project Management Considerations B. Nelson US ITER TBM Meeting INEL August 11, 2005

11 August, 2005ITER TBM Meeting2 Presentation Outline Project Organization – getting started DOE Project Management Requirements Lessons from recent projects

11 August, 2005ITER TBM Meeting3 Project Organization – getting started Establish project management team Define technical objectives- requirements, deliverables Define Work Breakdown Structure Define project organization –Assign responsibilities for WBS elements –Establish reporting relationships/org chart Develop management tools and procedures, including configuration control, cost / scheduling system, CAD system, Web site, etc. Develop conceptual design – (CAD models, dwgs, cost, etc)

11 August, 2005ITER TBM Meeting4 Work Breakdown Structure (WBS) provides roadmap for project management Organizes all the tasks into outline form Establishes the scope of each task, so –Responsibilities are clear –Bases for cost estimates are clear Easily modified, expanded as more detail becomes available Includes WBS dictionary that expands definition of each element

11 August, 2005ITER TBM Meeting5 WBS for US Contributions to ITER built around major procurement packages WBS 1.0 (Level 1): Total approved US ITER scope WBS 1.X (Level 2): 6 work groups, correlates with ITER WBS) –WBS 1.1 Tokamak (Magnets, Blanket/Shield) –WBS 1.2 Tokamak Ancillary Equipment and Cryostat –WBS 1.3 Tokamak Fluids (Vac Pumping and Fueling) –WBS 1.4 Power Supplies –WBS 1.5 Port Interfacing Systems (IC/EC H&CD, Diagnostics) –WBS 1.6 Project Support –WBS 1.7 Support to International team) WBS 1.X.Y (Level 3): Major systems WBS 1.X.Y.Z (Level 4): Major Procurement Packages (9) WBS 1.X.Y.Z.W (Level 5): Standard elements –Administration –R&D –Engineering (design, Title III) –Fabrication/Procurement –Installation

11 August, 2005ITER TBM Meeting6 WBS for US Contributions to ITER

11 August, 2005ITER TBM Meeting7 WBS for NCSX built around major components and activities

11 August, 2005ITER TBM Meeting8 Work Plan evolves from WBS, identifies individual work packages, deliverables, milestones Forms resource loaded schedule

11 August, 2005ITER TBM Meeting9 Possible WBS elements for ITER TBM Each element would include: –Administration –Engineering (Design and Title III) –R&D –Materials and subcontracts (procurements) –Fabrication and assembly –Installation Cost would include: –Labor hours, rates –M&S (Procurements) –Overhead –Escalation

DOE Requirements for Project Management

11 August, 2005ITER TBM Meeting11 DOE requires structured project management The DOE Order 413.3, Program and Project management for the Acquisition of Capital Assets, and the DOE Manual , Project Management for the Acquisition of Capital Assets, establish a management process to translate user needs and technological opportunities into reliable and sustainable facilities, systems and assets that provide the required mission capability. The management process is organized by project development phases and “Critical Decisions (CDs).” The Deputy Secretary is the Secretarial Acquisition Executive (SAE) for the Department of Energy (DOE). As the SAE, he/she promulgates Department-wide policy and direction, and personally will make critical decisions for Major System Projects. The project development phases represent a logical maturing of broadly stated mission needs into well-defined technical, system safety and quality requirements, and ultimately into operationally effective, suitable, and affordable facilities, systems, and other end products. Ref: Energy Systems Acquisition Advisory Board Procedures, 9/22/2004

11 August, 2005ITER TBM Meeting12 Critical Decisions define phases of project CD-0 Approve Mission Need (initiation phase) –Formally establishes project –Must develop/get approval of Mission Need Statement –Initiates status reporting (PARS)* and quarterly progress reviews (ESAAB)** –Approval starts conceptual design activities CD-1 Approve Alternative Selection/Cost Range (definition phase) –Clearly documents requirements basis for design and engineering phases –Develops Conceptual Design Report and Cost Range –Develop/get approval of (high-level) acquisition strategy that accounts for risks/mitigations –Develop/get approval of preliminary Project Execution Plan –Approval starts preliminary design activities *Project Assessment Reporting System (PARS), **Energy Systems Acquisition Advisory Board (ESAAB) Ref: C. Strawbridge, ITER mtg, Oct. 2004

11 August, 2005ITER TBM Meeting13 Critical Decisions define phases of project (2) CD-2 Approve Performance Baseline (execution phase) –Defines cost, schedule, technical scope and performance commitments for execution – Project Baseline –Initiates monthly project performance tracking –Final approval of Acquisition Plan and PEP –ANSI/EIA-748 Earned Value Management System in place –External Independent Review by DOE (OMBE/OECM) –Approval starts Final Design activities Ref: C. Strawbridge, ITER mtg, Oct. 2004

11 August, 2005ITER TBM Meeting14 Critical Decisions define phases of project (3) CD-3 Approve Start of Construction (execution phase) –Initiate/complete procurements –Execution External Independent Review by DOE (OMBE/OECM) –Takes project through completion of baseline plan CD-4 Approve Project Transition to Ops/Close-out (transition / closeout phase) –Transition/close-out plan (part of PEP) Ref: C. Strawbridge, ITER mtg, Oct. 2004

11 August, 2005ITER TBM Meeting15 Costing and scheduling activities continue through life of project Cost range and basic schedule developed during conceptual design phase Baseline cost and Integrated Project Schedule established during preliminary design phase Project tracked monthly to baseline –earned value method (BCWS, BCWP, ACWP) must be certified by DOE –adjustments to baseline are made as project evolves and contingency is drawn down

11 August, 2005ITER TBM Meeting16 Baseline statused monthly – NCSX example summary from CD3 review Ref: R. Strykowski, NCSX CD3 Review, June 2004 SPI = BCWP/BCWSCPI = BCWP/ACWP

11 August, 2005ITER TBM Meeting17 Contingency is key element risk management and cost estimate Detailed contingency allocations developed during all cost estimating phases based on Technical, Cost, and Schedule risks All contingency held by project management, cannot be drawn down without DOE project manager approval Review panels want to see 40% or more contingency on developmental items and total contingency of 30% throughout project, may require elimination of scope

11 August, 2005ITER TBM Meeting18 Technical Baseline must be under configuration control General Requirements Document System Requirements Documents System Description Documents Technical specifications Procedures Drawings

11 August, 2005ITER TBM Meeting19 Other key documents / activities Advanced Acquisition Strategy Acquisition Strategy Preliminary Project Execution Plan Project Execution Plan Environmental Impact Statement Value engineering Risk Management Plan Reviews

11 August, 2005ITER TBM Meeting20 Office of Science Project Decision / Approval Matrix (11/1/04)

11 August, 2005ITER TBM Meeting21 Acquisition Strategy High-level business and technical strategies to achieve project objectives within resource constraints Presents rationale and intended outcomes of Integrated Project Team’s approach to successful execution 6 major elements, emphasis on clarity Major focus for DOE-OECM Process/schedule for development: (next) Ref: C. Strawbridge, ITER mtg, Oct. 2004

11 August, 2005ITER TBM Meeting22 Acquisition Strategy: (elements and example schedule for US ITER) Ref: C. Strawbridge, ITER mtg, Oct. 2004

11 August, 2005ITER TBM Meeting23 Preliminary Project Execution Plan Summarizes critical information and plans necessary to manage and control project execution Includes organization, R2A2s, WBS, schedule, risk management… (18 elements) Process/schedule for development: (next) Ref: C. Strawbridge, ITER mtg, Oct. 2004

11 August, 2005ITER TBM Meeting24 Preliminary Project Execution Plan: (elements and example schedule for US ITER) Ref: C. Strawbridge, ITER mtg, Oct. 2004

Lessons Learned from recent projects

11 August, 2005ITER TBM Meeting26 Things that are working well System Integration Team – weekly meetings of key project personnel Integrated Project Team – minimum of monthly meetings – includes project and DOE personnel Critical Issues list and meetings – tracks issues, risk mitigation strategies, and resolution of issues Numerous web-based telecons using Netmeeting – encourages frequent interaction, reduces unneccesary travel Formal design and document review system with documented comments (chits) and resolution of comments

11 August, 2005ITER TBM Meeting27 Things that are working well (2) Rigorous Change Control based on reviewed and approved documentation Project Baseline and Earned Value system – kept up to date with monthly statusing, highlights issues, promotes re-planning Value Engineering effort to identify cost savings Project web site – Contains all project documentation Common CAD database – available to all participants, keeps configuration current at remote sites Prototypes of key components from competing vendors – develops more than one source, promotes competition, aids eventual bid process

11 August, 2005ITER TBM Meeting28 Things that are problematic Unforseen cost increases due to: –Optimistic cost estimates - double or triple some early design and fabrication estimates! –Not enough time allotted for reviews, meetings –Vendor issues / misunderstandings that require design changes Unforseen schedule slips due to: –Prolonged R&D, can’t finalize design until problems are solved –Lack of resources to solve schedule problems (slips also cost more) –Vendor fab problems Everything takes longer and costs more than planned –Do not scrimp on contingency –Avoid too many incremental design changes. Better is the enemy of good enough! –Remember Westhiemer’s rule

11 August, 2005ITER TBM Meeting29 Summary Project planning and management must be in place from inception of project, must develop –Project scope and technical requirements –WBS and responsibilities –Resource loaded schedule DOE requires rigorous management processes and documentation, projects phased with critical decisions CD-0,1,2,3,4 Everything costs more and takes longer than planned