Public Symposium on LNG Bowdoin College Brunswick, Maine Robert J. Cupina, Deputy Director Office of Energy Projects Federal Energy Regulatory Commission.

Slides:



Advertisements
Similar presentations
Pat Wood III, Chairman Federal Energy Regulatory Commission New Englands Platform for Infrastructure Development Boston September 13, 2004.
Advertisements

FERC 1 APGA Annual Conference Halifax, Nova Scotia FERC Priorities in an Evolving Natural Gas Market Suedeen G. Kelly Commissioner, FERC August 2, 2005.
1 The Honorable Suedeen G. Kelly Commissioner, Federal Energy Regulatory Commission IPAA 2004 Mid-Year Meeting June 14, 2004 “A FERC Perspective on Natural.
All Things Natural Gas Infrastructure, Rates and Policy
LNG A BRIDGE TO OUR ENERGY FUTURE. 2 This presentation contains certain statements that are, or may be deemed to be, “forward-looking statements” within.
Capitol Hill Ocean Week Managing Emerging Demands for LNG.
ACC Workshop Regarding Notice of Inquiry on Natural Gas Infrastructure September 10, 2003.
Environmental Regulation and Liquefied Natural Gas Commissioner Suedeen G. Kelly, FERC Duke Environmental Law & Policy Forum November 19, 2004.
Pat Wood, III, Chairman Federal Energy Regulatory Commission Energy Infrastructure Washington D.C. April 5, 2005.
What’s Up With Infrastructure? Interstate Pipeline Regulatory Committee Jeff Wright, Chief Energy Infrastructure Policy Group Office of Energy Projects.
The FERC Review Process and Interaction with State Authorities Council of State Governments July 27, 2005 Office of Energy Projects Federal Energy Regulatory.
IPAA Oil & Gas Investment Symposium New York April 20, 2004 Charif Souki – Chairman, President & Chief Executive Officer “Is it too late?” Cheniere Energy,
LNG PAT WOOD III Federal Energy Regulatory Commission December 17, 2003.
Federal Energy Regulatory Commission
Pivotal Development: Regions of Possibilities Dana Grams Senior Vice President, Pivotal Development.
1 California’s Role in the West Coast and Pacific Basin LNG Markets.
North American Natural Gas Infrastructure Needs Donald F. Santa, Jr. President Interstate Natural Gas Association of America The Independent Petroleum.
Federal Energy Regulatory Commission Item No. C- 7 Weaver’s Cove Energy & Mill River Pipeline June 15, 2005.
Outlook on Natural Gas and LNG. Fuel Diversity in New England Recent build-out ~10,700 MW Gas-fired generation (% Total NE GWh) –1999: 16% –2003: 41%
NATURAL GAS ROUNDTABLE Commissioner Suedeen G. Kelly, FERC February 24, 2004 “Pending Natural Gas Issues”
Federal Energy Regulatory Commission GITA Seminar on: New Construction Project Lifecycle JW Marriott Houston, TX September 20, 2004 Lonnie Lister, Chief.
Natural Gas In California LNG Imports UCSB Bren School Corporate Partners Summit May 14, 2004.
Eric J. Tomasi – Project Manager Division of Gas – Environment & Engineering Office of Energy Projects Federal Energy Regulatory Commission Northeast Energy.
Liquid Natural Gas (LNG) Facilities. LNG: What is it? Natural gas converted to liquid at -260 F Natural gas converted to liquid at -260 F 1/600 of original.
FERC and the Development of an Alaska Natural Gas Pipeline Robert J. Cupina, Deputy Director Office of Energy Projects Federal Energy Regulatory Commission.
Commissioner Suedeen Kelly Federal Energy Regulatory Commission Energy Infrastructure in the West February 24, 2006.
Natural Gas Transmission Networks: So You Want To Build A Pipeline?
FERC Office of Energy Projects 1 Federal Energy Regulatory Commission EPAct 2005 Authorities & FY06 Status of LNG Facilities and Pipelines IRWA Federal.
The Market Outlook for Natural Gas: The Wyoming Natural Gas Pipeline Authority’s Perspective Wyoming Geological Association Conference Prepared: July 26,
Regulatory Overview of LNG LSU Center for Energy Studies Energy Summit Baton Rouge, Louisiana October 20, 2005 Robert Cupina, Deputy Director, Office of.
FERC Organization Chart
Imported Liquified Natural Gas and its Role in Energy Independence Samuel Brown.
Natural Gas Transmission Regulation in the US Jeff Wright, Chief Energy Infrastructure Policy Group Office of Energy Projects Federal Energy Regulatory.
A wholly owned subsidiary of Cheniere Energy, Inc. American Stock Exchange: LNG Cheniere LNG Energy Summit 2004 “Securing Louisiana’s Economic Growth in.
Regulation and Investment in the U.S. Robert J. Cupina, Deputy Director Office of Energy Projects Federal Energy Regulatory Commission GIE Annual Conference.
ALASKA NATURAL GAS SYMPOSIUM Regulatory Update J. Mark Robinson, Director Office of Energy Projects Federal Energy Regulatory Commission December 2, 2004.
Challenges in Transmission. 2 Environmental and Public Affairs Consulting for the Energy Industry Energy Sectors  Oil & Gas  Pipeline  Storage  LNG.
LNG in North America Tommy Stone – Vice President, Operations & Engineering Trunkline LNG Company, LLC – Lake Charles, LA Tommy Stone – Vice President,
FERC Office of Energy Projects 1 Global LNG Outlook 2004 Regulatory Status & Challenges in the U.S. Richard R. Hoffmann, Director Division of Gas – Environment.
The FERC Review Process and The Importance of Safe Pipeline and LNG Terminal Operation NASFM Annual Meeting- July 8, 2005 Office of Energy Projects Federal.
LNG Regulatory Update 2 nd Annual Global LNG Outlook October 27, 2005 Houston, Texas Jeff C. Wright, Chief Energy Infrastructure Policy Group Office of.
LNG: Regulatory and Regional Considerations The Energy Council’s LNG/CNG Workshop Biloxi, Mississippi April 8, 2005 Robert Cupina, Deputy Director, Office.
Frank J. Macchiarola Executive Vice President May 6, 2015 Conference of Western Attorneys General The LNG Export Opportunity.
Alternative Energy on the Outer Continental Shelf Robert P. LaBelle Deputy Associate Director Offshore Energy and Minerals Management Minerals Management.
TEXAS TEXAS Current Status of Liquid Natural Gas Terminals & Offshore Wind Farms Jerry Patterson Commissioner Capitol Hill Ocean Week 2006 – State and.
Wyoming Pipeline Authority Public Meeting January 15, 2008 A Spectra Energy Proposal.
THE NORTH AMERICAN LNG OPPORTUNITY APEGGA, Calgary, Alberta.
Douglas A. Sipe Outreach Manager Outreach Manager Division of Gas-Environment and Engineering Federal Energy Regulatory Commission Office of Energy Projects.
LNG USA Houston, Texas J. Mark Robinson, Director Office of Energy Projects Federal Energy Regulatory Commission September 23, 2004.
Multiple Use Issues on the Outer Continental Shelf Walter Cruickshank, Deputy Director Minerals Management Service, Department of the Interior Capitol.
1 Federal Energy Regulatory Commission John M. Wood, Acting Director Division of Pipeline Certificates Office of Energy Projects FERC Update Florida Energy.
California Energy Commission 1 California’s Role in the West Coast and Pacific Basin LNG Markets LNG Asia Pacific 2006 Event February 13, 2006 Seoul, Korea.
Federal Energy Regulatory Commission The Pre-Filing Process IRWA/AI January 13-14, 2009 IRWA/AI.
The Northeast Natural Gas Market in 2030 LNG EXPRESS CONFERENCE Boston, Massachusetts September 21, 2006 William Trapmann Natural Gas Analysis Team Leader.
The Market Outlook for Natural Gas: The Wyoming Natural Gas Pipeline Authority’s Perspective.
Managing Our Future: A Case for LNG NARUC Summer Committee Meetings Keith Meyer President, Cheniere Marketing July 2007 CHENIERE ENERGY, INC.
Office of Energy Projects 1 FERC Update Robert J. Cupina Deputy Director Office of Energy Projects Federal Energy Regulatory Commission Wyoming Infrastructure.
California Energy Commission LNG’s Role for Expanding Natural Gas Supplies and Update on West Coast Projects Presented to West Coast PTTC Workshop Valencia,
FERC Office of Energy Projects 1 Richard Hoffmann, Director Division of Gas – Environment & Engineering Office of Energy Projects Policies Affecting.
Security at FERC Energy Projects Energy Bar Association Mid-Year Meeting Robert J. Cupina, Deputy Director Office of Energy Projects Federal Energy Regulatory.
1 Is there LNG in California’s Future? “LNG: When East Meets West” Zeus Development Conference Long Beach, CA by David Maul Manager, Natural Gas Office.
Natural Gas and Energy Reform Legislation Steve Crout Managing Director, Government Affairs American Gas Association.
Landon Derentz Energy Policy Advisor Bureau of Energy Resources U.S. Department of State Shale Gas and Tight Oil Production in the United States 1.
Continuing Progress of LNG Terminals in the Gulf Coast Region
California Energy Commission 1 LNG Permitting and Environmental Review: the View from California DOE LNG Forum Los Angeles June 1, 2006 Kevin Kennedy,
LNG Permitting: You Want it When? Lauren H. O’Donnell Deputy Director, DG2E Office of Energy Projects.
LNG Terminal Permitting J. Mark Robinson, Director Office of Energy Projects Federal Energy Regulatory Commission before the California Senate Energy,
U.S. Energy Information Administration Independent Statistics & Analysis Natural Gas Demand: New Domestic Uses and LNG Exports Natural Gas.
Understanding the Impacts of Incremental Gas Supply on the Flow Dynamics Across the North American Grid Canadian Institute Vancouver, BC November 20, 2006.
INTERSTATE PIPELINE FORUM Presented by: Rebecca F. Zachas, Esq.
Presentation transcript:

Public Symposium on LNG Bowdoin College Brunswick, Maine Robert J. Cupina, Deputy Director Office of Energy Projects Federal Energy Regulatory Commission July 29, 2004

FERC Office of Energy Projects 2 Office of Energy Projects - Functions OEP has the engineering and environmental expertise to:  certificate new gas pipeline projects  Authorize LNG terminals  license and monitor hydroelectric projects, and  analyze energy infrastructure needs and policies. OEP focuses on:  project siting and development,  balancing environmental and other concerns,  ensuring compliance,  safeguarding the public, and  providing infrastructure capacity information.

FERC Office of Energy Projects 3 NPC Study Align the conflicting policies –Policies that encourage consumption –Policies that inhibit gas supply

FERC Office of Energy Projects 4 Gas Facts Natural gas is the economic/ environmental fuel of choice. 96% of natural gas reserves are outside North America. 25% of World natural gas consumption occurs in the US.

FERC Office of Energy Projects 5 Historic and Projected US Gas Production and Consumption Source: EIA AEO 2004

FERC Office of Energy Projects 6 Some Production Areas Are Not Accessible * Approximately 29 TCF Of The Rockies Gas Resources Are Closed To Development and 108 Tcf Are Available With Restrictions. Source: NPC

FERC Office of Energy Projects 7 What is the answer? Imports Imports must make up the difference between domestic production and consumption Delivered in two ways: – Gaseous form by pipeline – Liquid form by tanker (LNG)

FERC Office of Energy Projects 8 How Much Natural Gas Is Out There? Office of Energy Projects 8 LNG supply growing Multiple LNG supply proposals announced Long term LNG supply outlook robust Global LNG Supply WORLD PROVED RESERVES 2002: 6,270 TCF NORTH AMERICA RESERVES 4% Source: Cedigaz, NPC Existing Under Construction Proposed Global LNG Supply Facilities

FERC Office of Energy Projects 9 LNG Imports by Country Source: EIA

Economic Oversight – Access to LNG Terminal A Open Access At Delivery of Liquid to Terminal LNG Suppliers LNG Buyers A B B Open Access At Delivery of Vapor into Interstate Pipeline System Liquid to Vapor Flow FERC Office of Energy Projects 10

FERC Office of Energy Projects 11 Benefits of the New LNG Policy Stimulates development of new LNG terminals Accommodates various business models Increases gas supplies to the U.S. Maintains FERC’s responsibility for environmental and safety reviews.

Existing Terminals with Approved Expansions A. Everett, MA : Bcfd (Tractebel – DOMAC) B. Cove Point, MD : 1.0 Bcfd (Dominion – Cove Point LNG) C. Elba Island, GA : 1.2 Bcfd (El Paso – Southern LNG) D. Lake Charles, LA : 1.2 Bcfd (Southern Union – Trunkline LNG) Approved Terminals 1. Hackberry, LA : 1.5 Bcfd, (Sempra Energy) 2. Port Pelican: 1.6 Bcfd, (Chevron Texaco) 3. Bahamas : 0.84 Bcfd, (AES Ocean Express)* 4. Gulf of Mexico: 0.5 Bcfd, (El Paso Energy Bridge GOM, LLC) 5. Bahamas : 0.83 Bcfd, (Calypso Tractebel)* 6. Freeport, TX : 1.5 Bcfd, (Cheniere/Freeport LNG Dev.) Proposed Terminals and Expansions – FERC 7. Fall River, MA : 0.8 Bcfd, (Weaver's Cove Energy/Hess LNG) 8. Long Beach, CA : 0.7 Bcfd, (Mitsubishi/ConocoPhillips – Sound Energy Solutions) 9. Corpus Christi, TX : 2.6 Bcfd, (Cheniere LNG Partners) 10. Sabine, LA : 2.6 Bcfd (Cheniere LNG) 11. Corpus Christi, TX : 1.0 Bcfd (Vista Del Sol - ExxonMobil) 12. Sabine, TX : 1.0 Bcfd (Golden Pass - ExxonMobil) 13. Logan Township, NJ : 1.2 Bcfd (Crown Landing LNG – BP) 14. Lake Charles, LA: 0.6 Bcfd (Southern Union – Trunkline LNG) 15. Bahamas : 0.5 Bcfd, (Seafarer - El Paso/FPL ) 16. Corpus Christi, TX: 1.0 Bcfd (Occidental Energy Ventures) 17. Providence, RI : 0.5 Bcfd (Keyspan & BG LNG) 18. Port Arthur, TX: 1.5 Bcfd (Sempra) Proposed Terminals – Coast Guard 19. California Offshore: 1.5 Bcfd (Cabrillo Port – BHP Billiton) 20. Louisiana Offshore : 1.0 Bcfd (Gulf Landing – Shell) 21. So. California Offshore : 0.5 Bcfd, (Crystal Energy) 22. Louisiana Offshore : 1.0 Bcfd (Main Pass McMoRan Exp.) 23. Gulf of Mexico: n/a (Compass Port - ConocoPhillips) 24. Gulf of Mexico : 2.8 Bcfd (Pearl Crossing - ExxonMobil) Planned Terminals and Expansions 25. Brownsville, TX : n/a, (Cheniere LNG Partners) 26. Mobile Bay, AL: 1.0 Bcfd, (ExxonMobil) 27. Somerset, MA : 0.65 Bcfd (Somerset LNG) 28. Belmar, NJ Offshore : n/a (El Paso Global) 29. Altamira, Tamulipas : 1.12 Bcfd, (Shell) 30. Baja California, MX : 1.0 Bcfd, (Sempra & Shell) 31. Baja California - Offshore : 1.4 Bcfd, (Chevron Texaco) 32. California - Offshore : 0.75 Bcfd, (Chevron Texaco) 33. St. John, NB : 0.5 Bcfd, (Canaport – Irving Oil) 34. Point Tupper, NS 1.0 Bcf/d (Bear Head LNG - Access Northeast Energy) 35. Pleasant Point, ME : 0.5 Bcf/d (Quoddy Bay, LLC) 36. Quebec City, QC : 0.5 Bcfd (Project Rabaska - Enbridge/Gaz Met/Gaz de France) 37. Lázaro Cárdenas, MX : 0.5 Bcfd (Tractebel/Repsol) 38. Mobile Bay, AL: 1.0 Bcfd (Cheniere LNG Partners) 39. St. Helens, OR: 0.7 Bcfd (Port Westward LNG LLC) 40. Cove Point, MD : 0.8 Bcfd (Dominion) 41. Puerto Libertad, MX: 1.3 Bcfd (Sonora Pacific LNG) 42. Offshore Boston, MA: 0.8 Bcfd (Northeast Gateway – Excelerate Energy) 43. Kitimat, BC: 0.34 Bcfd (Galveston LNG) 44. Prince Rupert, BC: 0.30 Bcfd (WestPac Terminals) *US pipeline approved; LNG terminal pending in Bahamas Existing and Proposed North American LNG Terminals July 2004 FERC Office of Energy Projects A C B D 41 US Jurisdiction FERC US Coast Guard

FERC Office of Energy Projects 13 Maximum LNG Deliverability Growth

FERC Office of Energy Projects 14 US Natural Gas Balance

FERC Office of Energy Projects 15 LNG Terminal Siting Issues Safety Take Away Capacity Local acceptance Federal and State approvals

FERC Office of Energy Projects 16 Safety Proximity to residential and commercial areas raises public safety concerns –Exclusion zones DOT/OPS enforces security. FERC performs pre- and post-certificate reviews of LNG terminals –Biennial reviews continue for life of terminal. Coast Guard enforces offshore ship safety

FERC Office of Energy Projects 17 Takeaway Capacity Is there an existing pipeline with takeaway capacity? Does the project require new pipeline construction? NEPA requires an analysis of the cumulative effects. –Can not have an LNG terminal without takeaway capacity

FERC Office of Energy Projects 18 Local Acceptance Has the project sponsor interacted with the local population? –Entertain concerns –Make adjustments or accommodations to the project.

FERC Office of Energy Projects 19 Federal and State Approvals Must get approvals: –FERC – NGA Approval –DOT/OPS – Exclusion Zones –Coast Guard – Vessel Operating Plan –Corps of Engineers – Dredging, Wetland Filling, Alternative Sites –NMFS, FWS – Endangered Species Act –Coastal Zone Consistency Determination –State Agency Requirements

FERC Office of Energy Projects 20 Primary federal authorization processes for LNG terminals FERC Review Process Pre-Filing Process Coast Guard Process

FERC Office of Energy Projects 21 FERC Review Process Public Notice Data Gathering/Analysis DEIS Public Meeting Final EIS Commission Order

FERC Office of Energy Projects 22 Traditional vs. Pre-Filing Process Announce Open Season Announce Open Season Develop Study Corridor Develop Study Corridor Conduct Scoping Conduct Scoping Review Draft Resource Reports & Prepare DEIS Issue Draft EIS Issue Draft EIS File At FERC Issue Order Issue Order File At FERC Prepare Resource Reports Prepare Resource Reports Issue Final EIS Issue Final EIS (months) Traditional - Applicant Traditional - FERC Pre-Filing - Applicant Pre-Filing - FERC

FERC Office of Energy Projects 23 Benefits of Pre-Filing More interactive NEPA process, no shortcuts Earlier, more direct involvement by FERC, other agencies, landowners Goal of “no surprises” Time savings realized only if we are working together with stakeholders FERC staff is an advocate of the Process, not the Project!

FERC Office of Energy Projects 24 The FERC Process: We Issue Notice of the Application Project Sponsor Sends Landowner Notification Package SCOPING = We Issue Notice of Intent to Prepare the NEPA Document Public Meeting(s) Public Input: File an Intervention Contact the project sponsor w/questions, concerns; contact FERC Send letters expressing concerns about environmental impact Attend scoping meetings Opportunities for Public Involvement

FERC Office of Energy Projects 25 The FERC Process: Issue Notice of Availability of the DEIS Public Meetings on DEIS Issue a Commission Order Public Input: File comments on the adequacy of DEIS Attend public meetings to give comments on DEIS Interveners can file a request for Rehearing of a Commission Order Opportunities for Public Involvement

FERC Office of Energy Projects 26 Maritime Security Act of 2002 (November 2002) Amendment of the Deepwater Port Act of 1974 –Transferred jurisdiction of offshore natural gas facilities from FERC to Maritime Admin- istration and Coast Guard Lowers Regulatory Hurdles –No requirement for open access to terminal –Decision required within 365 days

FERC Office of Energy Projects 27 LNG – Where the Action Is What is FERC Doing? –New LNG Branch at FERC to focus on and enhance LNG review, inspection programs –Provide for Seamless Review of LNG Facilities Interagency Agreement on Safety and Security –Development of FERC Model for LNG Tanker Release Consequences –Participating in Conferences/Seminars/Tours

FERC Office of Energy Projects 28 A number of studies gave rise to controversy FERC contracted with ABSG to identify models Gives FERC the ability to do more site specific modeling and reviews in EISs Provides a solid theoretical foundation from which to build on as new information becomes available Assumptions in the study are conservative The FERC Staff Study and Its Positive Impacts

FERC Office of Energy Projects 29 Natural Gas Pipelines Storage and Vaporization Facility Liquefaction and Storage Facility Natural Gas Production Dock LNG Supply Stream -- From Production to Distribution

FERC Office of Energy Projects 30 Outlook/Issues Associated with LNG Development States attempting to assert economic jurisdiction in the post- Hackberry environment Public safety information Interchangeability Importance of timing