April 4, 2014 Flight Dynamics 1 MMS-THEMIS Phasing An apples-to-apples comparison between the Winter Nominal and THEMIS Launch Block Conrad Schiff MMS.

Slides:



Advertisements
Similar presentations
Devon Floodplain Woodland Project Nick Whatley & Richard Knott Fisheries, Recreation and Biodiversity Team (Devon) March 2009.
Advertisements

MMS-THM coordination 1 Iowa 3/25/14 ARTEMIS THEMIS ARTEMIS THEMIS MMS-THEMIS coordination: Optimal Option (and alternatives) Vassilis Angelopoulos (UCLA);
The ICESat-2 Mission: Laser altimetry of ice, clouds and land elevation T. Markus, T. Neumann NASA Goddard Space Flight Center W. Abdalati Earth Science.
1 Winter Launch Block Modeling and Results MMS Flight Dynamics Team MIWG 8 Feb. 20, 2014.
MMS SWG 27 March MMS SWG –27 March 2014 MMS Mission Design March Launch Comparison (slides for the Telecon on 4 April 2014) Stephen A. Fuselier.
1st Joint Cluster-THEMIS Workshop THEMIS Orbit Updates - 1 UNH, Sep 23-26, 2008 THEMIS Orbit Updates Prior to Second Tail Season 2008/2009 S.Frey, V.Angelopoulos,
Philae Status and News Venezia; 30 st of March th Philae Post-Launch Workshop.
Division of Student Affairs UAP Presentation March 30, 2006.
TVA Generates Power and sends it down Transmission Lines to Newport Utilities Distribution Substations TVA Newport Utilities Substations Distributes the.
Regional Technical Forum End-use Load Shape Business Case Project Project Initiation Meeting Portland, OR March 5, 2012.
NASA’s Earth Science Division Flight Overview Bradley D. Doorn Program Manager Earth Science Division, Science Mission Directorate PECORA 18.
Mars Odyssey PSG Mission Status Gaylon W. McSmith Robert A. Mase June 9, 2003.
( ELR) - 1 STEREO - Solar Terrestrial Relations Observatory Mission STEREO SWG STEREO OBSERVATORY Status Edward Reynolds APL STEREO Project Manager.
Project Name Delete this tip note box: To estimate the length of your presentation multiply each slide by 3 minutes; this gives you the worst case.
SSL-SWT 1 Aug 6-8, 2007 THEMIS Extended Phase Summary of THEMIS team discussions (Please note: this is work in progress)
Copyright Chris van Buskirk, Mar 2001 MAPLANT Status Report MICANTS March 2001.
THEMIS peer Instrument CDR 1 CETP, Paris, April 8, 2004 THEMIS Mission Status at Peer UCB Instrument Critical Design Review UCB, April 19/20, 2004 Vassilis.
N O T E “CLICK” TO CONTINUE… If the slide show is not launched, click on View  Slide Show in the menu bar at the top of the Power Point window. When the.
Species At Risk Fisheries and Oceans Canada. Legislation - Update on Status Bill C-5 currently before the Senate Has been given 1st and 2nd readings Bill.
Create a title for your timeline Group members names: Save the file as “Lastname_firstinitial_Voting Rights Timeline” for every group member! (Example.
STEREO Science Center Status Report William Thompson NASA Goddard Space Flight Center STEREO SWG April 2008 Meudon, France.
Grant Proposal for Project Name Organization Name.
1 Project Update and Summary of Project Priority List (PPL) Activity July 16, 2015.
GLAST LAT Project DOE/NASA Review, March 31, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager
THM-MMS coordination 1 Summary of options from Feb 25, 2014 telecon ARTEMIS THEMIS ARTEMIS THEMIS THM-MMS coordination options: summary of Feb 25, 2014.
Nov JWST Data Management Systems Gretchen Greene.
Magnetospheric MultiScale Mission (MMS) Overview
STEREO Science Center Status Report William Thompson NASA Goddard Space Flight Center STEREO SWG March 27-28, 2007.
2014 Aquarius / SACD Science Team Meeting Agenda and Objectives Summarize the completion of NASA’s Aquarius 3-year prime salinity measurement mission (November.
ES Slowdown, Optimization, Testing. Plan for shutdown: Timeline April: Focus on resolution of major outstanding issues: – Bulk data deployment  stable.
Timeline for the oneM2M Partnership Project Timeline and Milestones [Steve Barclay, ATIS] [Joachim Koss, ETSI] Contribution to oneM2M-Cons#4, 28 Mar 2012.
Slide 1 of 5 COS Monthly Status Review David Soderblom STScI
EUM/OPS/VWG/11 Issue /06/2011 Yoke Yoon Yago Andres Christian Marquardt COSMIC GPS Data Processing Slide: 1.
Final Version Kequan Luu May 13-17, 2002 Micro-Arcsecond Imaging Mission, Pathfinder (MAXIM-PF) Flight Software.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Preparing the Proposal Designing and Supporting Computer Networks – Chapter 9.
THEMIS MISSION PDRMISSION DESIGN- 1 UCB, November 12-14, 2003 Mission Design Dr. Sabine Frey University of California - Berkeley.
S. Frey, UCB, THEMIS 1 25th ISSFD, Munich, Germany, Oct.19-23, 2015 ARTEMIS THEMIS ARTEMIS The Revised Concept of the THEMIS and MMS Coordination Sabine.
THM-MMS coordination 1 HSO Optimization ARTEMIS THEMIS ARTEMIS THEMIS Regarding revised MMS launch elements (RAP=274, AOP=170) relative to the 3/24/14.
1/106 December 2001Rosetta SOWG Status of the Rosetta Project TestBed (PTB) P. van der Plas Modelling and Simulation Section ESA/ESTEC ESA/Estec 6 December.
ProjectImpactResourcesDeadlineResourcesDeadline Forecast Plan Time Resources Risk 001xx 002xx 003xx 004xx 005xx 006xx 007xx TotalXX Example 1: Portfolio.
THEMIS MIWG #3Probe Separation Analysis - Page 1June 15 & Probe Separation Analysis Daniel Rummel UCB.
THM-MMS coordination 1 Summary of options from Feb 25, 2014 telecon ARTEMIS THEMIS ARTEMIS THEMIS THM-MMS coordination options: summary of Feb 25, 2014.
Project Funding Review February 7, Background ERCOT has a $15M project budget in 2013 (same as 2012) –To allow for new additions to the.
Territory-wide System Assessment 5 October 2015 Dr Lam Ling Chi, Tenny General Manager- Education Assessment Services Division.
THEMIS Mission Ops Peer Review Mission Design − 1 November THEMIS Mission Design.
MMS SCIENCE OPERATIONS, SCIENCE DATA SYSTEM, AND DATA ACCESS MMS Contact: Kris Larsen, lead for the MMS Science Data Center
Failure of Process / Failure of Mission
Pre-landing Orbiter Observations
Timeline Roadmap Template
2011 Prioritization Update to Market Subcommittees
Failure of Process / Failure of Mission
MMS enters Phase 2b to study Magnetic Reconnection on Earth’s Dark Side On 9 February 2017, NASA’s Magnetospheric Multi-Scale (MMS) mission began a three-month.
Project Plan Template (Help text appears in cursive on slides and in the notes field)
Project timeline # 3 Step # 3 is about x, y and z # 2
Release 3 Plan Options Decision
Performance Appraisal – The Process and the Timelines
Create a title for your timeline
First 10 months Angelopoulos, 2008 Space Sci. Rev. In Press
Timelines for n Final Call for Proposal
Release 3 Plan Options Analysis
Missile Defense Agency EVM Update
Center for Vision (CVN) on Block 33 Move Planning & Logistics Timeline
Back-End Payor Sub-Group
01 DRAW YOUR TIMELINE HERE JAN. MAR. JAN. MAR. FEB. APR. FEB. APR.
Preparing the Proposal
Project timeline # 3 Step # 3 is about x, y and z # 2
TGad Task Group Document Open Items
Rev. 2 Wireless Local Number Portability and Pooling Phase 2 Implementation Guideline INDUSTRY 2002 SERVICE PROVIDER JAN FEB MAR APR MAY JUN JUL AUG SEP.
Rev. 2 Wireless Local Number Portability and Pooling Phase 2 Implementation Guideline INDUSTRY 2002 SERVICE PROVIDER JAN FEB MAR APR MAY JUN JUL AUG SEP.
Presentation transcript:

April 4, 2014 Flight Dynamics 1 MMS-THEMIS Phasing An apples-to-apples comparison between the Winter Nominal and THEMIS Launch Block Conrad Schiff MMS SWG Meeting 4 Apr 2014 Significant contributions by: Trevor Williams, Laurie Mann, Edwin Dove, Khasy Parsay, Jason Tichy

April 4, 2014 Flight Dynamics 2 Flight Dynamics Status Flight Dynamics (FD) is currently working the following items 1.Generation of ephemeris files, in five-day steps, for Winter and THEMIS blocks over the prime launch window Mar 3 rd – Apr 3 rd, 2015 (3/5, 3/10, 3/15, 3/20, 3/25, 3/30) 2.Comparisons of these ephemeris files and post-processed results with (in order of priority): a.SWM76 modeling – needed for LV Target Spec b.Analysis produced Stephen Fuselier and Steve Petrinec (Steve 2 ) c.UCB produced ephemeris files 3.Determination of fuel optimal ways to meet formation flying goal in THEMIS Phase 0a science 4.Risk assessment of THEMIS block; including timeline, launch vehicle, fuel and operations considerations Criteria for science comparison of Winter Block (LV Target Spec Rev. D) with proposed THEMIS Block –Phase 0/1 dayside diffusion encounters –Phase 0/1 neutral sheet dwell time (FD currently using a proxy) –Phase 2b neutral sheet dwell time (Fairfield-based) –Phase 2d (extended mission) neutral sheet dwell time (Fairfield-based)

April 4, 2014 Flight Dynamics 3 Timeline Comparison March 7 th Launch The following is a J 2 -based estimate of the timeline of events for a Winter Block v. THEMIS Block launch. March 7 th chosen for ease of comparison with slides present by V. Angelopoulos at the Mar 2014 SWT.

April 4, 2014 Flight Dynamics 4 Science Metric Comparison Summary of current post-processed results –All ephemerides listed here are FDOA-produced –Good agreement on the Mar 15 th data with Steve 2 –Phase 0 night for THEMIS Block occurs in late Nov. –Phase 1 night for Winter Block occurs in mid-June –Phase 1 night for THEMIS Block occurs in mid-Dec Steve 2 to provide?

April 4, 2014 Flight Dynamics 5 Flight Dynamics Open Concerns