Put your company on the Cutting Edge of concrete floor technology!

Slides:



Advertisements
Similar presentations
Estimating the Cost for the Concrete Pad
Advertisements

By Add more muscle to your crew while reducing man-hours! ® EFFORTLESS LASER GUIDED RAKING.
Lightweight Forming System and Roofs for Concrete Floors.
What is On Time Booking? Reservation and distribution system for passenger transport companies (airlines and ferries ) Tool that helps you to manage the.
Vector Head Replacement Program Get the look and feel of new… For a fraction of the cost!
Plate Mounting Minimise press downtime Latest developments in mounting.
Big Pond Tank Mobile, Reusable Construction/Frac-Water Storage.
CV2000LS – Post Compensated Valve CV2000LS Post Pressure Compensated Flow Sharing Valve.
Brief Introduction of 3D Construction System
Product Presentation.
INAR 243 FLOORS.  Structural element  Proper ground for functions.
4/26/2015The Industry Leader1 WAYNE’S INC. Wayne Weber, owner PO Box 187 MORGAN, MN Phone: Fax:
DIT Equipment Inc. Sharky Splitter. High productivity 90 metric ton of force (100 short ton) on a 48” wide split. Split in 2 seconds (including an 8”
ASM & COAA Adding Value to Alberta Energy Sector projects.
BY ROBERT G. SPERRY M.S. GRADUATE JOHN H. WILHOIT EXTENSION ASSOCIATE PROFESSOR DAVE ASH ENGINEER AID BIOSYSTEMS AND AGRICULTURAL ENGINEERING, UNIVERSITY.
Implementing Mobile A/C Refrigerant Service Environmental Enhancements Jim Resutek OTB Consultants June 2008.
Sales and Operations Planning CHAPTER THIRTEEN McGraw-Hill/Irwin Copyright © 2011 by the McGraw-Hill Companies, Inc. All rights reserved.
LAYCO EQUIPMENT BY YARGUS MANUFACTURING
Zephyr Manufacturing Company, Inc. Microfiber The Money Saver.
RoboBlast USA Abrasive Blast And Vacuum System “ABAVS” Welcome to RoboBlast USA Abrasive blasting hasn't been very exciting...until now! Call Us at
HANDY AUTO & HANDY AUTO PLUS. Handy Auto / Handy Auto Plus.
Lightweight Concrete Masonry
Objectives In the 1 st half of this Module we’re going to cover: The computerized estimating process. How a Contractor comes up with his Material Costs.
In the Cement Industry. Circle of Refractory Maintenance.
Pulling System Hose Just Got Easier by TM Monthly Payments* Start At $ 617.
1Rugby 55 Presentation – January 2007 The Rugby 55 User Presentation.
Pizza Oven Concepts Program Jan 2009 Pizza Oven Concepts Webinar: Counter top oven, Server, and Warmers Frank Barrett-Mills January 12th.
Principles of Paving rev Principles of Paving.
Magazine Advertisement by the KoehlerCraft aircraft company.
A seminar on “AUTOMATED GUIDED VEHICLES”
Creating a Win-Win Relationship Presented by: John McCarthy GO Airport Express.
Announces the New EOS Pump Range EOS 15-C25 EOS 30-C25
Improving Safety through Efficiency in the Construction Industry – Is it a Fallacy? Presented by: Todd Hohn Brian Roberts.
Systems Development Life Cycle Dirt Sport Custom.
Airport Shuttle Agreements Presented by: John McCarthy GO Airport Express.
(Trouser Finishing Machinery) Presented By: Shailesh Prajapati Sneha B. Hulkoti R.O.I. CALCULATION FOR DIFFRENT LEVEL OF TECHNOLOGY Department of Fashion.
VC Training Table Setup and Floating Agenda General –Air Supply Requirements Assembly –Assembling the System –Leveling the Table –Isolating.
Principles of Manufacturing M anufacturing Mathematics Copyright Texas Education Agency (TEA)
Chapter 14. Learning Objectives (part 1 of 3) Explain what common stock represents Describe the role of a Board of Directors Discuss the voting process.
3HP Blade capacity 14” Cuts material 8”x8”x16” Weight 80lbs 2 spare air filters included # Accessories: Dust collection kit (as shown) #
ENTREPRENEURSHIP MYTH vs. REALITY 1. Myth Entrepreneurs are a rare breed, a kind of genius who is born not made. A jet- setting Silicon Valley engineer.
Outline to this Presentation: 1)Description, Features and Benefits 2)Product Info 3)Custom Projects.
GO Airport Shuttle Don Eames The GO Group, LLC Board Member President/CEO GO The Airport Shuttle AGTA Meeting Ft. Myers, FL.
February 2011 John R. Rastetter. PVC Disposal Issues Polyvinyl chloride (PVC) is the primary component in today's plate mounting material, like most plastics,
Flat Saw Training. Flat Saw Sizes –Low Horsepower Blade diameters range from 8” (200mm) to 18” (450mm) Power ranges from 4 to 25 horsepower.
INTRODUCTION The company started the production of metal products in 1992 and prefabricated modular buildings in Harmet’s product range includes.
CORE DRILLING MACHINES AND ACCESSORIES
Square Cat Why Orbital Technology Orbital technology is safe and effective for users of all levels Green Friendly, saves water and eliminates need.
Robotic Cleaners The Next Generation Save Time | Save energy | Save water | Save chemicals | Reduce maintenance.
Maintaining Profitability or improving profitability Phillip Rosebrook, Jr. CR.
PriceCheck.com Need for compare prices No other website offers the same service.
 Australian Owned & Manufactured since 1978  Most popular oil filter machines on the Australian market  Simplest and most efficient filtering system.
Driving Profitability in the Right Direction 2007 ING Conference.
MH...CH LECT-021 SYSTEMS CONCEPT Adopting a materials handling systems from overall optimization point of view. Adopting a materials handling systems.
POWERFUL SOLUTIONS. GLOBAL FORCE. TQ700 Lightweight Torque Wrench Pump May, 2013.
Businesses and the People that Start Them What It Takes to Start A Business.
Energy and Power Fundamentals Ch8 – Pt1. What is Energy?  We use energy every day Bodies Vehicles Machines Heating/cooling Light.
Dr. Subhash Technical Campus
Planer Machines. Introduction A planer is a type of metalworking machine tool that is some what similar to a shaper, but larger, and with the entire workpiece.
The Future of the Print Industry – Our Focus
Estimating the Cost for the Concrete Pad
Estimating the Cost for the Concrete Pad
Estimating the Cost for the Concrete Pad
Estimating the Cost for the Concrete Pad
Estimating the Cost for the Concrete Pad
Internal Mount Flange Facing Machine
IK-92 PUMA.
MHANZ 2015 MHANZ “Move It” 2015.
SCITEQ End closure series
Presentation transcript:

Put your company on the Cutting Edge of concrete floor technology!

2 The CopperHead ® has helped thousand of contractors deliver floors faster and flatter on millions of square feet worldwide. Now Somero has taken this walk-behind Laser Screed ® innovation a step further with the introduction of the Mini Screed ™ C; a smaller, lighter machine that meets the needs of many of our customers… customers who look to Somero for innovation, technology, leadership, and a competitive advantage in the constantly changing concrete flooring industry. Introduction

3 The Mini Screed™ C delivers the same results as our other walk-behind Laser Screeds ® and gives your crews the ability to: Laser Screed ® projects that were previously to small Laser Screed ® on lightweight metal decks Screed small jobs with laser accuracy Screed at a lower cost than any other conventional method or product on the market today The Mini Screed™ C is a small, yet powerful, self-propelled, walk-behind Laser Screed ® that’s small enough to fit in the bed of a pickup, but large enough to tackle a wide range of jobs. The Mini Screed™ C delivers outstanding performance slab-on-grade, below-grade, or on virtually any type of deck. Introduction

4 Yesterday’s method of hand-screeding floors

5 Each model has it’s own unique applications Today’s leading-edge technology of a Laser Screed ® floor

6 Slab-on-Grade or Slab-on-Deck Projects - Fibers - Pulled Mesh - Chaired Mesh - Chaired Rebar - Double Mat Rebar - Post Tension - Precast Topping - Fluted Metal Deck - Radiant Floor Heating Applications

7 ™ Quality difference between today’s screeding methods

8 Maneuverability

9 LIGHTWEIGHT, COMPACT DESIGN Weight:470 lbs Width:32” outside of tires Head Width:6’8” Height:41” without masts Length:72 ½”

10 No Wet-pads or Rails needed Screeding with the Mini Screed ™ C

11 Mini Screed ™ C Features Weight:470 lbs. Height:41” without masts Length:72 ½” Width: 32” outside tires 30 ½” handle bars 83 ½” head Automatic Self Level Robin America 6 hp Gas Engine High Float Tires (standard) Skinny Tires (optional) Adjustable Weight Distribution Headlights 2 Lift Points Automatic Operator Controls SSR Laser Receivers with internal 1/16 inch grade adjustment Quick Disconnect Head Pivoting 6’ 8” Vibrating Screed Head Adjusts 6 times per second to maintain grade

12 TIME RAISE / LOWER SWITCH FORWARD / REVERSE SWITCH VIBRATOR SWITCH HEADLIFT SWITCH QUICK PASS CONTROL MANUAL RECIEVER OVERRIDE HEADLIGHT SWITCH Easy Operation Operator Friendly - Fast Learning Curve

13 Mini C weight = 470 lbs Ground Pressure = 3.9 psi Average weight = 190 lbs Ground Pressure size 11 boot = 2.2 psi Man vs. Machine Exerts less pressure on the surface then 2 men

14 Performs on Various Applications

15 Improve hourly productivity. Faster finishing times. Reduce overtime expenses. Improve floor quality. Improve concrete yields. Notice immediate labor savings. Reduce fatigue. Retain key personnel. Reduce workers compensation claims. Costs less per month than one laborer. Improve your competitive edge, win more bids. Improve the image of your company. Why consider purchasing a Mini Screed ™ C Faster… Flatter… Fewer… Profitability…

16 Mini Screed ™ C $ 27,950 Spare Parts Kit & Manuals included Initial On-Site Training included Destination $ 800 $ 28,750 Options Emergency Support Kit $ 1,918 Start-up Kit $ 3,171 Includes: tripod, column clamp, lift harnesses, skinny tire assy, L-500 laser transmitter All pricing is in US Funds and subject to change $800 Destination is valid for the continental US only Note: additional training trips $1,500 each if needed PRICING Monthly Payments* Start At $ 547 with first & last down, 60 months, 10% buy out

17 OPTIONAL START-UP KIT: LL-500 non-sloping Laser Transmitter Tripod Column Clamp Skinny Tires & Wheel Assy. Lift Harness OPTIONAL SUPPORT KIT: Control Box SSR Receiver Cord Linear Actuator Assy. 2 Plow Wings 4 Plow Linkages 8 Vibrator Isolators Hydraulic Filter Air Filter Clamp Assembly Misc Hardware Carrying case Standard and Optional Equipment STANDARD SPARE PARTS KIT: Owner’s Manual Actuator cord Emergency Cord Rocker Switches Spare Pins (turnbuckle/removable head) Cotter Pins Ring- Split Isolators 8mm Hex bit, T handle Element, Air filter Carrying case Gauge- Air Pressure Digital Fitting Grease M10 straight

18 15,000 sq. ft. Placement 1 – Finisher setting wet pads 2 – Finishers using a straight edge 3 – Laborers leveling concrete while screeding 6 - Total manpower for the screeding process Average 2,500 sq. ft. per hour 15,000 sq. ft. Placement 1 - Finisher using a Somero Mini Screed C 2 - Laborers leveling concrete while screeding 3 -Total manpower for the screeding process Average 3,000 sq. ft. per hour 3 Man Savings with a Mini Screed ™ C Typical Manpower Conventional vs. Mini Screed ™ C

19 15,000 sq. ft. Placement 3 - $40 per hr x 6 hr = $ $30 per hr x 6 hr= $ 540 Conventional Labor Cost = $ 1,360 15,000 sq. ft. Placement 1 - $40 per hr x 5 hr = $ $30 per hr x 5 hr = $ 300 Mini Screed ™ C Labor Cost = $ 500 Average Non-Union Labor Savings = $860 per day Average Non-Union Labor Cost Conventional vs. Mini Screed ™ C Yields a 460% Return On Investment Assuming 30 uses per year with an average labor rate of $35/hr, $604 per month in payments and operating expenses

20 Average Union Labor Savings = $1,062 per day Average Union Labor Cost Conventional vs. Mini Screed ™ C 15,000 sq. ft. Placement 3 - $54 per hr x 6 hr = $ $45 per hr x 6hr= $ 810 Conventional Labor Cost = $ 1,782 15,000 sq. ft. Placement 1 - $54 per hr x 5 hr = $ $45 per hr x 5 hr = $ 450 Mini Screed ™ C Labor Cost = $ 720 Yields a 679% Return On Investment Assuming 30 uses per year with an average labor rate of $51/hr, $604 per month in payments and operating expenses

21 Mini-RakeMini ScreedC Combine the Mini-Rake ™ with a Mini Screed ™ C and you will significantly increase your labor savings and floor quality even more. Extremely Productive Package!

22 1. Aggressively expand your revenue opportunities 2. Labor productivity improvements 3. Lower self-performed cost of work in place efficiencies 4. Find and implement improved equipment efficiencies Sustainability and Profitability The Economic Reality: What Contractors Should Be Doing Now to Prepare for What’s Next by Scott Humrickhouse, Director of FMI Improvement8-Hour Day Increase in Profitability 2%9.6 minutes20% 5%24 minutes50% 10%48 minutes100% The Labor Productivity Opportunity 4 Keys To Survival

23 Somero Mini Screed ™ C Increase Your Competitive Advantage in 2010!  Greater Efficiency - Less money spent per square foot screeded - Operator and crew friendly  Increases Productivity - Screed more square feet per hour  Improves Quality - Improved FL numbers  Safer - Fewer injuries  Lowers Operating Costs - Fewer work comp claims - Less lost time - Lower insurance rates  Yields Greater Profitability - ROI’s of % or more