JSW STEEL LTD, SALEM WORKS

Slides:



Advertisements
Similar presentations
UC-Irvine Meeting Identifying Energy Saving Opportunities in Process Heating through Waste Heat Recovery and Power Generation Bryan Warren Southern.
Advertisements

Waste Heat Recovery System Sathishkumar Sivagurunathan M110078EE.
Welcome.
Energy Efficiencies Opportunities for SMEs … An effective tool to sustain bottom line Tuesday, April 2, 2013.
INTRODUCTION. Seminar on IMPROVEMENT OF THERMAL EFFICIENCY BY RECOVERY OF HEAT FROM IC ENGINE EXHAUST.
Yasunari Matsuno, Ichiro Daigo, Masaru Yamashita
The SunAirCool Eco Power Station
LOW GRADE WHU POTENTIAL- TEXTILE SECTOR
Triple Effect of Reject to Power on Joburg’s Waste Vision
CARBERY MILK PRODUCTS BALLINEEN Co. Cork Energy Saving Programme Application of “Pinch” Technology.
Welcome to the Presentation of Plasma Based Industrial Desulphurisation & Denitrification Plant from flue Gas.
Exhaust Heat Recovery Systems
Heat Recovery for Commercial Buildings
Thermal Power Station Plant. Introduction 150 MW Thermal power station plant, produce 450t/hr steam at full load The max steam pressure is 150 bar with.
Bio-Energy Emission Solution (BEES) WELCOME TO + =
PRESENTATION OF INDUSTRIAL TRAINING ON
Solid Fuels Properties and Testing of Coal. Testing of Coal Proximate analysis of coal Ultimate Analysis Determination of Calorific Value Swelling Index.
Sustainable Indigenous Energy for Tea Industry in Sri Lanka L P Jayasinghe Bio Energy Association of Sri Lanka.
Generation and Control of Vacuum in Furnace
Power Plant Construction and QA/QC Section 2.4– Boiler Auxiliaries
1 Increasing Energy Access while mitigating climate change Case for Energy Efficiency PAUL KIRAI National Project Manager, GEF-KAM ENERGY PROJECT - Kenya.
STEAM BOILERS SUBMITTED TO: Mr. Ankit Soni Assistant Prof. Mechanical Dept. SUBMITTED BY: Mukul Dev Kushwah 0903ME Dec
Presented by: Terry Stohs Viessmann Manufacturing Company Inc.
R Pharmaceuticals Waste Incineration & Heat Recovery at Roche Ireland Ltd. Andrew Carden.
Ironmaking in the Blast Furnace Plant
OJSC “NOVOLIPETSK STEEL”
“Energy Efficiency Guide for Industry in Asia”
Energy Recovery System Hadi Fattah Chris Korkuch Scott Lacey Ryan Neary Colin O’Neill.
Small-scale District Heating based on Biomass Joakim Lundgren Division of Energy Engineering Luleå University of Technology.
Pharos University جامعه فاروس Faculty of Engineering كلية الهندسة Petrochemical Department قسم البتروكيماويات PE 330 ENERGY CONSERVATION LECTURE (5) Flue.
Steam Power Station Presented By Ashvin G. Patel Asst. Prof. (E.E.)
Siemens sans siemens sans bold siemens sans italic siemens sans italic bold siemens sans black siemens black italic Siemens Building Technologies.
Performance Evaluation of A Steam Generator P M V Subbarao Professor Mechanical Engineering Department A Measure of Efficient Combustion …..
Selection of Optimal Air Fuel Ratio P M V Subbarao Professor Mechanical Engineering Department Efficient Combustion Requires Sufficient Air…..
Status: Karsten Brinkmann PowerMex-CHP_CO2 bensheim engineers CHP – one Possibility to reduce CO 2 Karsten Brinkmann Promotion for CHP Berlin.
1 By Zenith Energy Services (P) Limited Hyderabad Presentation on Surat Textile Cluster Surat, Gujarat State.
Northeast and Mid-Atlantic States Regional Low Carbon Fuel Standard Stakeholder Meeting
Energy Efficiency in Industrial and Commercial Facilities 2003 Energy and Environmental Conference September 16, 2003.
PRESENTED BY: S.Neelakandan, R.S.Karthikeyan, P.Ashok, GUIDED BY: V.S.Venkatesan, Prof. S.Vijayaraj Final Year Mechanical, (HOD/MECH) A.V.C College of.
By Brian Kish and David Buck Study of the Utilization of Bio-Gas (Methane) for the Coors Brewing Company.
Plant Utility System (TKK-2210) 14/15 Semester 4 Instructor: Rama Oktavian Office Hr.: M-F
……“Delivering Green” WeCare Organics LLC 9289 Bonta Bridge Road Jordan, New York
1 By Zenith Energy Services (P) Limited Hyderabad Presentation on Vapi Dyes and Chemical Industries Cluster Gujarat State.
Tata Steel : Commitment to Excellence. Iron making Steel making Casting Rolling New SP # 3 : 2 mtpa ‘G’ BF Upgradation from 1.24 to 1.8 mtpa, increase.
CHAPTER 5: Mass and Energy Analysis of Control Volumes
INTERNATIONAL CONFERENCE ON INDIAN STEEL INDUSTRY: “CHALLENGES AND OPPORTUNITIES” 23 rd -24 th MARCH 2012 M.N. Dastur & Company (P) Ltd STEELMAKING THROUGH.
Unit 2 -Gas And Diesel Power Plants
Analyst Meet Third Quarter – Contents Operations Financials Outlook Industry Company.
11. 2 Steam Energy Energy that comes from the push of steam.
Welcome PRESENTATION BY ASHISH MISHRA.
By: Abbas Kamranian, Head of R & D Dept., Researcher in PPFT Dev.
ENERGY EFFICIENCY IN THERMAL UTILITIES AND SYSTEM
THERMAL POWER PLANT.
SURATGARH SUPER THARMAL POWER STATION
Biscuit baking process and engineering
CERTIFICATE This is to certify that the project work entitled “Different Power Plants“ Is being submitted by Name of the student : Enroll no.: Patel Akshaykumar.
Understanding Steam Efficiency IPPTA Conference Kolkata March 2016 Rob Parker – Kadant Johnson.
HEAT-GENERATING EQUIPMENT INTRODUCTION SELECTION EFFICIENCY FURNACES BOILERS CENTRAL HVAC SYSTEMS.
Green Concrete 1 1.
L I NGAYA'S INSTT. OF MGT. AND TECHNOLOGY, FBD. THERMAL POWER PLANT OVERVIEW.
WASTE TO ENERGY THE GASIFICATION ROUTE. WHY GASIFICATION GREEN TECHNOLOGY COMPLIANT EMISSION & ZERO DISCHARGE LOWER CO2 LOWER SO X & NO X CDM COMPLIANT.
0 Allocation in phase 3 of EU ETS Case study: integrated steel mill.
QUOVADIS – PRACTICE OF SRF IN EUROPE:THE CASE OF NEW MEMBER STATES EU THE POTENTIAL POSSIBILITIES OF BULGARIA IN SRF USAGE. PRELIMINARY SRF DATA ABOUT.
Operating experiences at JSPL, BF-II Achieving higher performance indicators with inferior raw materials By : Hemant Upadhyay Arvind Kumar Bhagat.
PRESENTED BY:- ASHUTOSH KUMAR MISHRA ( ).
REDUCTION OF NOx & SOx EMISSION WITH ALTERNATIVE FUEL UTILIZATION IN CEMENT INDUSTRY SOx NOx.
CFBC BOILER UPDATE Coal Based Circulating Fluidized Bed Combustion (CFBC) Boiler Technology By :Asad Mehmood.
First of all
Exhaust Heat Recovery Systems
Desuperheater Water Heater, Heat Pipe Heat Exchangers, ECONET | Leading Manufacturer | Manor
Presentation transcript:

JSW STEEL LTD, SALEM WORKS WELCOMES YOU ALL

ABOUT JSW SALEM PLANT JSW Steel Ltd, Salem works, part of USD 11 Billion JSW Group, is India’s largest integrated special steel plant located in Salem, Tamilnadu with installed capacity of 1 MTPA

MAIN PRODUCTS Wide product ranges from 5.5 mm to 240 mm Coils - 5.5 to 23.5 mm Round Bars- 20.5 to 60 mm Flats- 60 x 7 to 101 x 20 mm Round Blooms-56 to 200 mm Wide product ranges from 5.5 mm to 240 mm More than 700 grades developed

OUR CUSTOMERS Products Key Customers As Cast MSL, Karamtara, Wheels India, Lucchini, Italy Flats Jamna Industries, Soni Auto Ltd Bars Madhur Engineers Ltd, Southern Steel and Forgings Coils Aradhya Steel ltd, Mitco Wires Ltd RR/RCS Bharat Forge LTD, Happy Forge Ltd, Echjay Industries, MM Forgings…

REDUCTION IN COKE MOISTURE BY UTILIZING WASTE FLUE GAS & IT’S EFFECT IN BF OPERATION REJI MATHAI, V.RAVICHANDRAN, M.S. RAO, T.K. NAHA

INTRODUCTION JSW Steel Limited (JSWSL), Salem Works, operates eco- friendly Coke oven plant, which Produces 0.5 million tons per annum of metallurgical coke through three Heat recovery batteries comprising of 120 ovens. And through waste heat recovery boilers 30 MW power is being generated.

SUMMARY OF COKE MAKING PROCESS At JSW, Coke is manufactured by heating of the Suitable coal blend in the absence of or controlled air inside the Silica refractory lined oven at the temperature of 1250 to 1300 c for about 68 to 72 hours coking time. During the carbonization process all VM present in the coal is burnt and produce heat. The remnant solid mass after carbonization is called Hot Coke, which is pushed out and quenched with water, segregated in to various size for the BF use.

OBJECTIVE OF THE THEME The sensible heat of the hot waste flue gas generated in the coke oven process which was partly being let out through the chimney is used to dry the coke 2 to 3 % Reduction in Coke moisture.

A NOVEL CONCEPT

HOT FLUE GAS ANALYSIS Sl.No. Parameter Unit Value 1 PM mg/Nm3 40.2 2 Sulfur die Oxide(SO2) 79.4 3 Nitrogen Oxide(NO2) 21.6 4 Carbon mono oxide (CO) % 0.2 5 OXYGEN O2 6.0 6 Carbon die oxide CO2 12.0

PROJECT IMPLEMENTATION 1500 TPD INHOUSE INSTALLATION OF COKE DRYING UNIT AN UNIQUE & FIRST OF IT’S KIND IN INDIA

OPERATING PARAMETER Sl. No Description Unit Actual 1 FD Fan RPM 1220 2 Gas flow M³/Hr 110000 3 FD Fan Inlet temperature ° C 240-250 4 Coke Bunker Inlet Temperature 220-230 5 Coke Outlet Temperature 110-130 6 Suction MMWC 96-120 Coke Dryer FD Fan

COKE DRYING METHOD The hot waste flue gas at temperature 1050 °C is extracted. Diluted to 250°C by the atmosphere air . Hot gas Blown to coke dryer bunker through FD fan. The coke is retained for one and half hour . The coke moisture content reduces from >5.5 to <2.5%. The emergency vent & water spry system is provided . Dust dust free environment is ensured during coke loading.

OUTCOME

MOISTURE EFFECT IN BF OPERATION

BF#1 RESULT – BEFORE AND AFTER Coke Drying Unit Fuel Rate Kg/THM Sinter % Slag Volume HBT Deg.C Steam gm/Nm3 Coke Moisture Corrected Fuel Rate Before 591 73 355 977 20 5.49 593 After 588 74 377 988 31 2.34 582 Difference 3.14 11 Observations : Based on the data study, it was observed that for every 1% reduction in coke moisture, there was a reduction of around 3.5 Kg/THM in fuel rate Note : Shutdown and low production days data not considered for data study Study was made on Corrected fuel rate to eliminate the effect of variations in sinter usage, slag volume etc.

TANGIBLE BENEFIT Coke Moisture Reduction – 3.0% Coke Saving – 10.5 Kg/THM (Approx) Coke Cost – RS 13,000 /MT (Approx) Hot metal Production – 75,000 MT/ MONTH Cost Saving Per Year – Rs 12.84 Cr/ Annum

CONCLUSION Coke moisture reduction > 2.5% consistently. Significant Reduction in fuel rate at the BF. An energy conservative initiation. Recurring benefits . Life & Safety of the chimney is enhanced by minimum let out of hot flue gas.

ACKNOWLEDGEMENT The authors are very thankful to Mr. M S Pillai, Associate Vice-President and Mr. V. Ravichandran, Sr.Manager CPP-2 for Constant support and initiative to complete the coke dryer project.

THANKS