Warehouse Layout Analysis for Ferro Electronics By Roberto E. Estrada Rajan Batta Rakesh Nagi April 13, 2001.

Slides:



Advertisements
Similar presentations
WAREHOUSING MANAGEMENT
Advertisements

WAREHOUSING MANAGEMENT
WELCOME to JBT Food Tech presentation Food Town Concept Bulgaria
 1  Outline  putaway  pallet storage and retrieval  case retrieval  project.
Warehouse Layout Design Project
2013 Rosenbauer Engines. Pierce EnginesRosenbauer Engines.
Limited Liability Company 2011 june. 1 Description of the location 2 Main characteristics 3 Capacity and technological process 4 Services 5 Prospects.
Facility Layout 7 Personnel Requirements Shipping and Receiving.
Material Handling Material Handling System Design Important calculations.
Auxiliary Services Space Requirements
5/3/2015 IENG 471 Facilities Planning 1 IENG Lecture 14 Material Handling.
Computer Integrated Manufacturing CIM
American Cyber Logistics American Cyber Logistics Schneck Properties Of S.C. An overview of our facility and grounds.
Storage & Handling Systems. Reasons for Storage Reduce transportation – production costs Coordinate supply and demand Assist in the production process.
1 Sonic Speakers Facility Design – A College Industry Council for Material Handling Education Case Study Developed in conjunction with Gross and Associates.
Fresh Bread and Roll Scaling Room MSD II Final Presentation Erik Webster, Cecilia Enestrom, Kate Gleason, Grant Garbach, Andrew Tsai May 15 th, 2009.
Warehousing Decisions
Dr. Muzaffer Kapanoğlu - Decision Support Systems © 2003 MATERIAL HANDLING (Textbook Chapter 5)
Health & Safety Environment Types of Truck Practical Take A Test.
OMSAN LOJİSTİK Day 2Day 1 Session 2 – Afternoon Process and Technology Alternatives Pallet Storage Case Picking - Manual - Mechanized Session 3.
Design and Layout of Foodservice Facilities John C. Birchfield 2008
1 Presentation of the Central terminal of Senukų Prekybos Centras UAB Kaunas 2010.
Lifting Hazards and some ideas on how to reduce your risk of lifting injury.
Racking In The Foodservice Warehouse W. Frank Dell CMC President DELLMART & Company 125 Hardesty Road Stamford, CT
Fixture Standards. Layouts Fixtures WorkingStation FixtureAccessories Greeter’sArea EquipmentContents.
Material Handling System Design
PPMCCPPMCCPPMCCPPMCC. Problem Plan Measure Calculate Conclude PPMCCPPMCCPPMCCPPMCC.
Unit load principle The unit load is a single item, a number of items or bulk material which is arranged and restrained so that the load can be stored,
Chapter 3 Storage Systems
Container Freight Station 유재동 김정환 정철호 유재동 김정환 정철호.
How is a manufacturing facility planned?
LOCATE AND SET UP YOUR BUSINESS
FACILITY LAYOUT PROBLEM
Inventory Group Marcus Jameson, Evan Sheline, Jeff Stine, Michael Breitweiser, Spencer Hill Dr. Giolma – Advisor Tony Franckowiac - Sponsor.
Large Truck Manufacturing Facility Flow Planner Software Results.
Presented by : Wang Yu Shun. Agenda  Introduction  Introduction of Vytec Corporation  The Manufacturing Process  The Finished Good Warehouse  Planning.
Chapter 8: Storage and Handling
Citrus Throughput Calculation Dwell ave. of 07 days = throughput per slot of 20.0 Dwell ave. of 08 days = throughput per slot of 17.5 Dwell ave. of 09.
L – 5 Distribution Channel - Warehousing and Inventory Management.
IENG 471 Facilities Planning Personnel Planning - Parking
LESSONS ENTREPRENEURSHIP: Ideas in Action© SOUTH-WESTERN PUBLISHING Chapter 8 LOCATE AND SET UP YOUR BUSINESS Choose a Retail Business Location.
Complete Storage System Provider Racking system Shelving system Ou Efos Resources No Kompleks Sri Sungai Nibong Jalan Sultan Azlan Shah
 Reduce costs.  Reduce damage.  Increase space and equipment utilization.  Increase throughput.  Increase productivity.  Improve working conditions.
CONTENT OBJECTIVES SUMMARY TEXT VIDEO REFERENCES.
FACILITY LAYOUT & LOCATION PROF. DR. ORHAN TORKUL M. RAŞİT CESUR.
Unit 3 Storage This unit is designed to give you an introduction to the concept of storage as it relates to the logistical handling of materials. Well-planned.
FACILITIES PLANNING ISE310L SESSION 25 Warehouses, November 17, 2015 Geza P. Bottlik Page 1 OUTLINE Questions? Any supply chain or facilities stories or.
MSME  Micro small and medium enterprises
Auxiliary Services Requirement Space
Storage and Warehousing Techniques
Storage and Warehousing Techniques
Warehouse Space & Layout
Computer Integrated Manufacturing CIM
How does storage work in your company
AS/RS (Automated Storage/Retrieval System)
Warehouses Redesign to Al-Zalmout Distribution Co.
Warehouse Layout Design Project
What Types of Pallet Racks are Mostly Adopted by the Business?
Things to Keep in Mind While Installing Cantilever Racks.
What are Some Appropriate Storage Solutions for Your Warehouse.
Things to Bear in Mind While Buying Pallet Racks.
Way to Setup the Racks in your Warehouse
Benefits of Using Different Types of Pallet Racks in Warehouse.
Way to Determine the Layout of your Warehouse with Efficient Planning
Things to Know About Push Back Pallet Racking System
Chapter 3 Material Handling Equipment
FERRO Warehouse under Model 4A
Warehouse design in A.R. Alhijjawi and Sons Company
Facilities and Layout Planning
Warehouse Facility & Security Measures
Presentation transcript:

Warehouse Layout Analysis for Ferro Electronics By Roberto E. Estrada Rajan Batta Rakesh Nagi April 13, 2001

Contents Motivation Current Situation Data Collection Alternatives Recommended Alternatives Suggestions on Implementation Suggestions on Racks/Trucks Acknowledgements References

Motivation Lease on “other” warehouse expiring Additional manufacturing space needed Improve organization of materials Improve utilization of space

Current Layout Area A—finished goods ceramic division –17 rows –Door walkway –36 more rows –Each row fits 10 pallets deep on ground

Current Layout… Areas B and C—center of warehouse –Divided into two sides –Each side has 31 rows –Each row can hold 7 or 8 pallets deep Area D—WIP from Electronics division –18 rows, door walkway, 38 more rows –10 pallets deep on ground in each row

Current Layout… Area E—3 rows of 10 pallets each –Mostly products that are to be shipped soon Area F—each end of warehouse –Fits 30 rows –First 20 rows—8 pallets deep on ground –Remaining rows used half deep –Mostly raw material stored

Current Layout… Areas G1, G2 and G3 have four ground spaces each Racks PR1-PR4 hold several products –Organized in 43”X36” pallets –Mostly finished products in totes and paper bags New Rack—144 spaces

Current Layout… Total of 4804 pallet spaces An additional 585 pallets will be transferred to the warehouse

Data Collection Dimensions of warehouse Current forklift trucks used Required aisle width Dimensions of current racks Dimensions of materials to be stored Average holding quantities of raw materials, WIP and finished products

Data Collection… Information also gathered on: –Available push-back racks –Available fork-lift trucks

Alternatives Three models were initially generated. Model 1: Places aisles length wise –Narrow aisles so turret truck is needed –Able to view warehouse from front (safety advantage) –Capacity: 5446 pallets

Alternatives… Model 2: –Makes use of current racks –Places racks longwise on one side –Horizontal on other side –3 deep racks for pallets –Makes necessary the use of a turret rack –Capacity: 5185 pallets

Alternatives… Model 3: –Places one central aisle longwise –Either side has racks with various pallet depths –Uses narrow aisles –Capacity: 6208 pallets

New Alternative Use current racks Rack material that is currently stored at 1 or 2 pallets high Leave 600 rack spaces for WIP; 200 in single racks, 400 in 3 and 4 deep racks Leave 30 long rows (10 deep) for 8.5 gallon and 6.5 gallon drums for ground storage

New Alternative… Place rack along end side of warehouse Currently there are 5 rows of 4000 lbs totes, at 2 high. Leave 100 rack spaces for these (wide; 52”) 6 more specific requirements

Recommended Alternative Model 4A: –Capacity is 5268 pallets –Uses narrow aisles (Turret forklift) Model 4B: –13 feet wide aisles (regular forklift) –Capacity is 4963 pallets

Is new truck justified? Cost of turret truck is $75,000 Get 305 pallets extra Work out economics based on cost of leased space

Suggestions on Implementation Requires a careful and graduated plan When one area is being re-racked the material needs to be temporarily stored Installation needs to be done from the rear of the building Revised practices in storage

Suggestions on Racks and Forklift Trucks Cost per rack space=$125 Model 4A: $343,750 + turret forklift ($75K) Model 4B: $315,250

Acknowledgments Close contact with company personnel Special thanks to company main contact (kept minutes) and person whom we got data from Weekly meetings

References Tompkins, White,…, Facilities Planning, Wiley (1996). Tompkins and Smith (eds.), The Warehouse Management Handbook, McGraw Hill (1998).