Status & operational experience of Liberas at SSRF Leng Yongbin, Yan Yingbing, Zhou Weimin, Chen Yongzhong Ye Kairong, Yuan Renxian, Zou Yi, Yu Luyang,

Slides:



Advertisements
Similar presentations
Beam Monitors Info from John Musson on new cavity receivers Other monitor issues.
Advertisements

22-23/06/20093 rd Libera Users Meeting, ESRF1 3 years of experience of Libera BPMs at SOLEIL Nicolas HUBERT Synchrotron SOLEIL On behalf of Diagnostics.
M.Gasior, CERN-AB-BIBase-Band Tune (BBQ) Measurement System 1 Base-Band Tune (BBQ) Measurement System Marek Gasior Beam Instrumentation Group, CERN.
Mark Heron Diamond Light Source Oct 2007 EPICS EPICS Interface to the Libera Electron Beam Position Monitor.
SPEAR3 short pulse development J. Safranek for the SSRL accelerator physics group* Outline: Timing mode fill patterns Short bunches –Low alpha Bunch length.
Monitoring the length of the bunches in the ESRF storage ring using microwave cavity pick ups.
Experimental set-up at E.S.R.F. L. Farvacque. 1/04/2004L. Farvacque - E.S.R.F.2 Experimental set-up Hardware Kickers Bpms Software Data acquisition processing.
SSRF Diagnostics System DAQ Yongbin Leng SSRF BI group
1 Slow Global Orbit Feedback at Pohang Light Source (PLS) Heung-Sik Kang Pohang Accelerator Laboratory Pohang, Korea.
Ron Johnson Beam Position October 29-31, Beam Position Monitors FAC Review October 29-31, 2007 Stripline BPM.
Bob Lill LCLS FAC June 16-18, 2008 RF BPM Status and Production Test Results.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Stability Workshop April , 2007 NSLS-II Electrical Systems G. Ganetis NSLS-II Electrical Systems NSLS-II.
ATF2 Q-BPM System 19 Dec Fifth ATF2 Project Meeting J. May, D. McCormick, T. Smith (SLAC) S. Boogert (RH) B. Meller (Cornell) Y. Honda (KEK)
29/06/2007FOFB at Diamond1 Fast Orbit Feedback (FOFB) at Diamond Guenther Rehm, Head of Diagnostics Group.
High Resolution Cavity BPM for ILC final focal system (IP-BPM) ILC2007/LCWS 2007 BDS, 2007/6/1 The University of Tokyo, KEK, Tohoku Gakuin University,
Beam Instrumentation for Orbit Stability I. Pinayev.
Characterization of Fast Orbit Feedback System Om Singh, APS, ANL NSLS-2 Beam Stability Workshop BNL, April 18-20, 2007.
Characterization of NSLS2 Storage Ring Beam Orbit Stability Weixing Cheng #, Kiman Ha, Joe Mead, Boris Podobedov, Om Singh, Yuke Tian, Li-hua Yu NSLS-II,
Bob Lill Undulator Systems – BPM January 31, 2006 Undulator Cavity BPM Design and Status.
Tevatron BPM System Upgrade Technical Update Bob Webber Run II Luminosity Upgrade Review February 2004.
Basic BPM Hardware Theory Jim Steimel. Wall Current Charge in a cylindrical perfectly conducting pipe produces an equal and opposite image charge at the.
Simulation and Experimental Results of SSRF Top-up Operation Haohu Li, Manzhou Zhang SSRF Top-up Workshop, Melbourne
Capacitive transducer. We know that : C=kЄ° (A/d) Where : K=dielectric constant Є° =8.854 *10^-12 D=distance between the plates A=the area over lapping.
Storage ring optics characterization – the basics
Cavities Auto Recovery with Beam RF&Linac Section - ALBA Accelerators Division Francis Perez Angela Salom.
Contents Overview of 150 MeV FFAG Accelerator
The ATF Damping Ring BPM Upgrade Nathan Eddy, Eliana Gianfelice-Wendt Fermilab for the ATF Damping Ring BPM Team.
RREPS'11, Egham (UK) Status of Beam Loss Detector Tests and Developments at PETRA III & ESRF Gero Kube DESY (Hamburg) Introduction: PETRA III Extension.
1 H. Hayano for the ATF collaboration Low Emittance Beam Generation in ATF H. Hayano for the ATF collaboration BPM electronics improvement emittance tuning.
BEPCII Transverse Feedback System Yue Junhui Beam Instrumentation Group IHEP , Beijing.
18 December 2007 ATF Damping Ring BPM System Upgrade Joe Frisch, Justin May, Doug McCormick, Janice Nelson, Tonee Smith, Mark Woodley (SLAC) Charlie Briegel,
IMAC 2007BEPCII Timing System Status1 Event timing system for BEPCII storage ring commissioning Presented by G. Lei May 2007.
14th ESLS RF Workshop ELETTRA / Trieste, Italy / 2010 September The Elettra Storage Ring and Top-Up Operation Emanuel Karantzoulis.
Bunch by bunch feedback systems for KEKB Makoto Tobiyama KEK Accelerator Laboratory.
The 224 Liberas ( 32 cells x 7 stations ) are now all doing Closed Orbit measurement and slow Orbit Correction the T-b-T capability has been tested and.
Main Injector Beam Position Monitor Upgrade: Status and Plans Rob Kutschke All Experimenters’ Meeting April 3, 2006 Beams-doc-2217-v3.
Beam Physics Issue in BEPCII Commisionning Xu Gang Accelerator physics group.
Timing System R+D for the NLC Josef Frisch. NLC and PEPII Phase and Timing Requirements (approximate)
U. Raich CERN Accelerator School on Digital Signal Processing Sigtuna Digital Signal processing in Beam Diagnostics Lecture 1 Ulrich Raich CERN.
Electron beams in order to sense nm-size mechanical vibrations? CERN: Marek Gasior: BBQ electronics (Andrea Boccardi: VME electronics) Juergen Pfingstner:
CESR as Light Source David Rubin for the CESR Operations Group Cornell University Laboratory for Elementary-Particle Physics.
Instrumentation at ATF / TTF Accelerator Test Facility (KEK) Tesla Test Facility – FLASH (DESY) ESA / LCLS (SLAC) Marc Ross, SLAC.
Tevatron Beam Position Monitor Upgrade Stephen Wolbers (for the Tevatron BPM Upgrade Project) PAC05, Knoxville, TN May 16-20, 2005.
4. Operations and Performance M. Lonza, D. Bulfone, V. Forchi’, G. Gaio, L. Pivetta, Sincrotrone Trieste, Trieste, Italy A Fast Orbit Feedback for the.
Experience with Novosibirsk FEL Getmanov Yaroslav Budker INP, Russia Dec. 2012, Berlin, Germany Unwanted Beam Workshop.
Beam Diagnostics Seminar, Nov.05, 2009 Das Tune-Meßverfahren für das neue POSI am SIS-18 U. Rauch GSI - Strahldiagnose.
ApEx needs for CeC PoP Experiment December 11, 2015.
CLIC Beam instrumentation work shop, CERN, 2 nd & 3 rd of June 2009, Lars Søby BPM overview CLIC instrumentation work shop 2-3 June BPM overview.
Accuracy of the orbit measurement by KEKB BPM system for the study of ILC damping ring H. Fukuma (KEK) Requirement for the accuracy of BPM data.
Fast Global Orbit Feedback for the Australian Synchrotron Eugene Tan Accelerator and Operations 13/12/20101 ACAS Workshop on Accelerator Feedback Systems.
Beam Instrumentation of CEPC Yue Junhui (岳军会) for the BI Group Accelerator Center, IHEP HF2014.
Embedded RF Applications/Systems
Status of CEPC Beam Instrumentation Study Ma Huizhou On behalf of CEPC BI Group Beijing, China
Bunch by bunch feedback systems for KEKB Makoto Tobiyama KEK Accelerator Laboratory.
ESLS Workshop Nov 2015 MAX IV 3 GeV Ring Commissioning Pedro F. Tavares & Åke Andersson, on behalf of the whole MAX IV team.
Report Technical Director Storage-Ring-Installation Completed
Operations Machine Simulator.
The Survey of the Power Supply Reliability at SSRF
Status of the ASTRID2 facility
5 months of experience with 8 units of Libera Brilliance
SOLEIL Fast Orbit Feedback System
Coupling Correction at the Australian Synchrotron
Controls CBETA controls will extend existing EPICS control system
Commissioning the Fast Orbit Feedback System at SSRF
Machine Operation and Progresses in SSRF
Beam Current Monitoring with ICT and BPM Electronics
Status and experience of Liberas at Soleil
Report on ATF2 Third Project Meeting ATF2 Magnet Movers ATF2 Q-BPM Electronics Is SLAC ILC Instrumentation Group a good name?
Undulator Cavity BPM Status
LHC Systems Providing Post-Mortem Data
Presentation transcript:

Status & operational experience of Liberas at SSRF Leng Yongbin, Yan Yingbing, Zhou Weimin, Chen Yongzhong Ye Kairong, Yuan Renxian, Zou Yi, Yu Luyang, Huang Guoqing BI Group, SSRF

YAN Yingbing / SSRF BI group Libera Workshop, ESRF, Jun 2009 Outline  Introduction of SSRF  SSRF BPM system  Libera applications Tune monitor Beam spectrum monitor Beam current & charge measurement BPM phase advance monitor

YAN Yingbing / SSRF BI group Libera Workshop, ESRF, Jun 2009 Shanghai Synchrotron Radiation Facility  Third generation light source  Total budget is about 130 millions EURO  12/25/2004 and is open to 5/1/2009

YAN Yingbing / SSRF BI group Libera Workshop, ESRF, Jun 2009 SSRF complex

YAN Yingbing / SSRF BI group Libera Workshop, ESRF, Jun 2009 Libera based BPM system

YAN Yingbing / SSRF BI group Libera Workshop, ESRF, Jun 2009 Specification

YAN Yingbing / SSRF BI group Libera Workshop, ESRF, Jun 2009 BPM system overview ComponentsSolutionProducer injector ring Customer design, local company Customer design, Kyocera, Japan CableMajor cable, SMR400 Jumper cable, SMR240 Field fabricated, Times microwave Prefabricated, Times microwave ProcessorLibera electronIT IOC softwareDLS packageDiamond Light Source Group accessSoft IOC, EPICS DB chainCustomer design High level application Matlab, LCA Soft IOC analyze packageCustomer design

YAN Yingbing / SSRF BI group Libera Workshop, ESRF, Jun 2009 Ring pickup factory test Mechanical inspection DC isolation resistance Capacitance Magnetic permeability AC voltage break down Network analyzer S11 Leakage BPM block gauge

YAN Yingbing / SSRF BI group Libera Workshop, ESRF, Jun 2009 Ring pickup factory test

YAN Yingbing / SSRF BI group Libera Workshop, ESRF, Jun 2009 BPM station 5 ID BPM Blue line 30m, redundancy for installation 20m The longest cable should be shorter than 30m + 20m = 50m Total insertion loss < 0.1 * = 6dB Major cable TIMES LMR400 Loss < 10dB/100m Jumper cable TIMES LMR240 Total loss < 0.5dB BPM cabling

YAN Yingbing / SSRF BI group Libera Workshop, ESRF, Jun 2009 BPM cable & processor installation

YAN Yingbing / SSRF BI group Libera Workshop, ESRF, Jun 2009 BPM data & functions ready for accelerator physicists Support by DLS package ADC raw 117MHz, 2048 points First turn data synchronized by injection trigger First 2048 samples of TBT data synchronized by injection trigger Up to 0.5M samples of TBT data on demand 10Hz SA data, orbit measurement Embedded position interlock logic User defined current scaling factor (beam current measurement) Instrumentation Technologies delivered 10kHz FA SFP port SSRF added some applications 24 hours buffer for SA EPICS DB level Auto Gain Control logic EPICS DB level Beam lifetime EPICS DB level Phase advance EPICS DB level

YAN Yingbing / SSRF BI group Libera Workshop, ESRF, Jun 2009 Current performance No obvious critical narrow band noise below 100Hz Integrated [0 1kHz] smaller than 1um Could be improved by identify & remove unknown noise source

YAN Yingbing / SSRF BI group Libera Workshop, ESRF, Jun 2009 Ring BPM resolution 0.2mA 1mA 10mA 200mA COD resolution, BW 2Hz TBT resolution, BW 350kHz COD topup operation  COD resolution: typical <200nm, best <80nm, with ideal beam <40nm  TBT resolution: typical 3um  Uniformity of filling pattern is important for BPM performance

YAN Yingbing / SSRF BI group Libera Workshop, ESRF, Jun 2009 Beam current dependency (1) Evaluated during injection (15minutes) BPM readings drift including: electronics BCD&FPD, BPM block drift, orbit drift More than 90% drift within 20um, few BPMs drift up to [100mA 200mA] Electronics BCD&FPD only: within [100mA 200mA] Reference BPM Normal BPMs

YAN Yingbing / SSRF BI group Libera Workshop, ESRF, Jun 2009 Beam current dependency (2) Evaluated during decay (2.5 hours) BPM readings drift including: electronics BCD&FPD, BPM block drift, orbit drift More than 90% drift within 10um, few BPMs drift up to [170mA 200mA] Electronics BCD&FPD only: within [170mA 200mA] Normal BPMs Reference BPM

YAN Yingbing / SSRF BI group Libera Workshop, ESRF, Jun 2009 Filling pattern dependence (1)

YAN Yingbing / SSRF BI group Libera Workshop, ESRF, Jun 2009 Filling pattern dependence (2) No evidence showed that BPM readings jumped due to filling pattern changing

YAN Yingbing / SSRF BI group Libera Workshop, ESRF, Jun 2009 Filling pattern dependence (3) No evidence showed that BPM readings jumped due to filling pattern changing Original fill refill

YAN Yingbing / SSRF BI group Libera Workshop, ESRF, Jun 2009 Libera application

YAN Yingbing / SSRF BI group Libera Workshop, ESRF, Jun 2009 Tune monitor configuration Configuration is the same for Booster and Ring

YAN Yingbing / SSRF BI group Libera Workshop, ESRF, Jun 2009 Tune monitor performance: Ring Daily operation: FFT of 10k TBT data, uncertainty < E-4 Precise measurement: FFT of 400k TBT data, uncertainty < E-5 Typical TBT data during tune measurement Precise tune measurement Daily operation panel

YAN Yingbing / SSRF BI group Libera Workshop, ESRF, Jun 2009 Tune monitor performance: Booster TBT data 400k samples, cover 240ms FFT windows size 2048, 1/1.23ms = 800Hz Tune measurement uncertainty < E-3 Horizontal ramping tune Vertical ramping tune Tune drift during ramping

YAN Yingbing / SSRF BI group Libera Workshop, ESRF, Jun 2009 Beam spectrum monitor (TBT) Current dependent few tens Hz copper cavity running. Gone with copper cavity

YAN Yingbing / SSRF BI group Libera Workshop, ESRF, Jun 2009 Beam spectrum monitor (TBT) Observed 15Hz & 46Hz noise, PS group targeted the source based on this information

YAN Yingbing / SSRF BI group Libera Workshop, ESRF, Jun 2009 Beam spectrum monitor (10Hz) 0.1Hz, 3.1Hz and 4.5Hz noise observed, still working to identify the source

YAN Yingbing / SSRF BI group Libera Workshop, ESRF, Jun 2009 Beam current & charge measurement  Libera could be used to measure beam current, data rate usually is better than PCT system. But  Orbit offset adjustment should be applied.  RF frequency adjustment should be applied.  Current scale factor (KI) and current offset should be precisely calibrated with PCT one by one.  It’s easy to do when machine running with fixed orbit. If orbit moving it will be very complicated.

BI group SSRF, Feb 2008 Beam arrival monitor Injected beamFirst turn Multi turnsStored beam Sum signal of first turn, calculated from ADC data Bad cable connection, or huge orbit offset

SSRF, Feb 2008 Beam current ring Current resolution testRF frequency dependence observed Orbit dependence observed Current resolution is better than [0 50mA] Current measurement error 0.2% due to RF change Up to 2% current error due to orbit move

YAN Yingbing / SSRF BI group Libera Workshop, ESRF, Jun 2009 BPM Phase advance monitor The phase difference between two neighboring BPMs can be calculated Cell 1

YAN Yingbing / SSRF BI group Libera Workshop, ESRF, Jun 2009 Acknowledgment  Guenther Rehm and Micheal Abbott from DLS  Jean-Claude Denard from Soleil  Jim Sebek and Bob Hettel from SSRL, SLAC