Electrical tapes for the ATLAS phase II barrel strip tracker upgrade

Slides:



Advertisements
Similar presentations
Silicon Technical Specifications Review General Properties Geometrical Specifications Technology Specifications –Mask –Test Structures –Mechanical –Electrical.
Advertisements

Manufacturing Processes for a 4 Layer Multi-layer PCB Section through PCB Via hole SMD Pad The following presentation covers the main processes during.
News from B180: DC-DC Stavelet with HV MUX One hybrid shows ~20ENC extra noise, others much the same. Not yet understood - investigations continue Carlos.
ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
Recent achievements and projects in Large MPGDs Rui de Oliveira 21/01/2009 RD51 WG1 workshop.
sTGC for ATLAS Small Wheel upgrade
One Way Circuits Limited Printed Circuit Board Manufacturer A Guide To Manufacturing Multilayer PCBs Use Left and Right Cursor keys to navigate ESC to.
I.Tsurin Liverpool University 08/04/2014Page 1 ATLAS Upgrade Week 2014, Freiburg, April 7-11 I.Tsurin, P.Allport, G.Casse, R.Bates, C. Buttar, Val O'Shea,
General needs at CERN for special PCB’s Philippe Farthouat CERN.
Tony Smith LHCb Velo Hybrid Meeting CERN 29/07/04 1 VELO HYBRID STATUS CONSTRUCTION of composite SUBSTRATE – best flatness obtained with TPG central core.
The AMS-02 detector is based on a large acceptance (~0.5 m²sr) and high sensitivity spectrometer composed by a super-conducting magnet (0.8 T), cooled.
1 Module and stave interconnect Rev. sept. 29/08.
Module Production for The ATLAS Silicon Tracker (SCT) The SCT requirements: Hermetic lightweight tracker. 4 space-points detection up to pseudo rapidity.
Printed Circuit Board Design
QA during Stave Core Assembly Stephanie Qing Yang (Oxford) 25 th Sept 2014 WP4 f2f meeting at RAL.
Stave core assembly Stephanie Yang WP4 face to face meeting, Lancaster University 20 Feb 2014.
1 BAM Activity at CERN New welding tools Alternative folding brick: dimension measurements Leakage test measurements in destructive mode Pressure test.
STATUS OF THE CRESCENT FLEX- TAPES FOR THE ATLAS PIXEL DISKS G. Sidiropoulos 1.
IBL Mock Up IBL Mock Up MANUFACTURING 2011/04/29 François-Xavier NUIRY Maxence CURDY Andrea CATINACCIO CERN PH/DT/PO 1.
VELO upgrade electronics – HYBRIDS Tony Smith University of Liverpool.
Read-out boards Rui de Oliveira 16/02/2009 RD51 WG1 workshop Geneva.
WP7&8 Progress Report ITS Plenary meeting, 23 April 2014 LG, PK, VM, JR Objectives 2014 and current status.
SVX4 chip 4 SVX4 chips hybrid 4 chips hybridSilicon sensors Front side Back side Hybrid data with calibration charge injection for some channels IEEE Nuclear.
ATLAS Tracker Upgrade Stave Collaboration Workshop Oxford 6-9 February 2012 ABC 130 Hybrid.
Electrical tapes for the ATLAS phase II barrel strip tracker upgrade Roy Wastie, Tony Weidberg Oxford University.
17/06/2010UK Valencia RAL Petals and Staves Meeting 1 DC-DC for Stave Bus Tapes Roy Wastie Oxford University.
Stave Core QC Peter Sutcliffe RAL 24 th Sept 2014.
Raw Material & Sub-Assembly QA (Tim) 25/09/14 25/09/2014Material & Sub-assembly QA1.
1 Module and stave interconnect Rev. sept. 29/08.
Progress on staves – mechanical & thermal. Core and materials.
Quality Control and Quality Assurance for PCB production Fabian Kuger on behalf of the MAMMA Collaboration Julius-Maximilians Universität Würzburg, Germany.
CERN Rui de OliveiraTS-DEM TS-DEM Development of Electronic Modules Rui de Oliveira CERN CERN hybrid production experience (or how to stay out of trouble)
, T. Tischler, CBM Collaboration Meeting, GSI Status MVD demonstrator: mechanics & integration T.Tischler, S. Amar-Youcef, M. Deveaux, D. Doering,
Marc Anduze – 09/09/2008 Report on EUDET Mechanics - Global Design and composite structures: Marc Anduze - Integration Slab and thermal measurements: Aboud.
Mechanical Status of EUDET Module Marc Anduze – 05/04/07.
PCB procurement WG Status report PCB WG status, 25/03/2014Joerg Wotschack.
Silicon /pcb assembly R Thompson, J Freestone LAL 3 June 08.
Ideas for LC mechanics (we will work on sensors as well – particular CMOS)
Module mounting. Status Stave 250 received… damaged – Repair now complete (see extras) Friday at 8:30 it will be collected by RAL driver and transported.
Assembly Procedure ALICE Outer Barrel Stave 14 Module 2 Cold Plates 1 StaveMarco Kraan Paul Kuijer.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
Baby MIND coil modules assembly the aluminium folded strip solution 1 Alexey, Philippe, Gabriella, Helder, Herman Baby Mind Magnet CERN June.
Strip Stave cores Stephanie Yang ATLAS upgrade Oxford activities, January 2015.
WP6 status report A. Di Mauro (CERN) ITS plenary meeting
Low Mass Rui de Oliveira (CERN) July
Hybrid Mechanical/Thermal Design Ray Thompson / Manchester FP420 meeting Torino 11/12 July 06.
MFT WG5: ladder disk and global assembly Stéphane BOUVIER & Sébastian HERLANT MFT WG7: Mechanics and Thermal studies Jean-Michel BUHOUR & Emili SCHIBLER.
Tilt angles reloaded, and status of some other things.
End-of-stave region. 2 Space Z-dimension is critical –Keep gap small (might help getting rid of stubs) Edge of last barrel silicon (at corner) is 1277.
The Development of the Fabrication Process of Low Mass circuits Rui de Oliveira TS-DEM.
D. M. Lee, LANL 1 07/10/07 Forward Vertex Detector Overview Technical Design Overview Design status.
PS Module Ron Lipton, Feb A bit of History During much of the conceptual design phase of the outer tracker we had focused on the “long barrel”
EOS and type I Prototype Service Modules Mike Dawson (Oxford), Rob Gabrielczyk (RAL), John Noviss (RAL) 19 th January 2015 ATLAS Upgrade Activities, Oxford.
Marc Anduze – CALICE Meeting – KOBE 10/05/07 Mechanical R&D for Technological EUDET ECAL Prototype.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
WP7&8 Progress Report ITS Plenary meeting, 10 June 2014 LG, PK, VM, JR.
Stave #12 This stave core was built together with William Emmet, Tom Hurteau, and Jeffery Ashenfelter from Yale University in the week of November.
Low Mass Alice Pixel Bus Rui de Oliveira TE/MPE/EM 6/9/20161Rui de Oliveira Alice worshop.
PACKAGE FABRICATION TECHNOLOGY Submitted By: Prashant singh.
Workshop How to make a PCB
Marc Anduze – EUDET Meeting – PARIS 08/10/07 Mechanical R&D for EUDET module.
Rui De Oliveira Vienna March 2014 Industrialisation of Micromegas detector for ATLAS Muon spectrometer upgrade 1.
The STS-module-assembly:
Large volume GEM production Rui De Oliveira TE/MPE/EM
ATLAS pixel module assembly flow
Ladder Assembly All tools and jigs produced Glue dispensing works
ob-fpc: Flexible printed circuits for the alice tracker
Studies of Quad Pixel Module assembly using paper laminate
What determines impedance ?
Presentation transcript:

Electrical tapes for the ATLAS phase II barrel strip tracker upgrade Roy Wastie, Tony Weidberg Oxford University Forum on Tracking Detector Mechanics DESY

ATLAS upgrade barrel strip stave design The stave is the local support in the ATLAS phase II upgrade barrel strip system Mechanically: Carbon fibre/honeycomb sandwich with an embedded cooling channel ~500 staves for complete barrel Silicon strip modules are glued to both sides of the stave The electrical service and data/control bus is a Cu/Kapton flex circuit (‘tape’) on top of the sandwich facesheets and underneath the modules. This bus connects modules to the end-of-stave card (EoS), which contains multiplexers and the stave connector to the external services All connections to the tape are done by wire-bonding 13 modules = 1.3×0.1m2 EOS card Carbon fibre facesheet Electrical tape Similar build on other side Prototype stave core with electrical tapes

Electrical tapes Supply all electrical services to modules from End of Stave (EoS) card Low voltage power (for on-module DC/DC conversions or serial power) High voltage for silicon (up to 500V but low current) Low Voltage Differential Signalling (LVDS) data (point-to-point, 2 differential pairs/module) Multi-drop LVDS (mLVDS) for trigger, timing and control (TTC) signals from EoS to modules (3 differential pairs, all modules on same bus) Power control bus (4 lines, low voltage) Feature sizes on slide xx

Tape Design Rules For the design of the (prototype) tapes for the ATLAS strip tracker upgrade we defined a set of design rules Minimum track and gap: 100μm Minimum bond-pad width: 150μm Separation between HV and LV lines/pads: 0.8mm if under Kapton and 1.75mm if not under Kapton This is a spec from UL (industrial standard) Gaps between pads and cut-outs on cover layer: >1mm This is a set of design rules which we chose because we are confident that large scale tapes can be produced following these rules with a large success rate Underwriters Laboratories

Trace geometries Altaflex Tape Fine pitch data lines HV lines Power Lines

Tape Layout Hybrids

Tape Layout

Tape Layout EOS Data TTC LV Power Control HV

Tape Layout

Tape Layout HV Power HV Power HV Backplane connection

Tape Layout

Tape Layout TTC Data Data Cover Layer opening Inner Layer opening TTC

Tape material Use Cu/polyimide (Kapton is DuPont trademark for one version of polyimide) Best reliability is achieved by Cast material as opposed to glued (polyimide flowed over copper) Copper is rolled annealed No glue to fail with radiation Alternative adhesiveless material is electro-deposited material (Cu layer grown electrolytically on seed layer) Easier to maintain flatness after etching. Typically 25µm polyimide (other options are 12µm and 50µm) Different copper thicknesses possible We used 18µm (other common options are 9, 12 or 35µm)

Tape build Can do multiple layers but vias would be very challenging → avoid if possible Connection by aluminium wire-bonding Use electro-less Ni/Au plating of bond pads (CERN-approved recipe for reliable wire-bonding) We have used two electrical layers + cover layer In principle one can use Al instead of Cu Attractive in principle because s×X0 better by factor 3.7 than for copper … But the process is vastly more difficult has been done successfully by Rui de Oliveira @ CERN Photolab for ALICE If not done properly there is a high risk of chemical damage resulting in cracks in the traces Our advice: avoid Al if possible and if you need it, think of your process very carefully Sigma is the electrical conductivity inverse of resistivity Use Dupont LF materials ~160µm

Tape manufacture Handling Process cleanliness: Wear Gloves, clean room clothes. All work in semi clean/cleanroom Alignment is maintained between layers using dowel holes and a jig plate. The holes are cut using a CNC knife cutter and alignment fiducials on the artwork Process steps: Laminate photo resist to Cu/Kapton Images tape with artwork Strip photoresist Check photoresist Etch Cu layers Surface preparation to Cu layers Bake out of Cu layers Cut alignment holes and access holes in Cu layers Cut glue/cover layer Cut press materials conformance packing, release film etc. Load jig plate Laminate tape in hydraulic press 20kg/cm2 for 30mins @ 185°C Step 3 remove Assembly in jig plate Glue layer Trace layer Dowel holes

Lamination When pressing load jig into cold press apply pressure 20kg/cm2 and then turn on heat 185°C for 30mins ramp up 30mins hold then Cool down 8hrs under pressure. AL plate 4mm Dowel Kapton Tape Paco Pad Press Release film Pacoflex Ultra to improve surface finish Dowels 4mm close to tape edge and spacing between depends on accuracy required in alignment, up to every 5cm

Tape length Measurements Scale Artwork to compensate for co-cure expansion

Tape manufacture lessons learned Surface preparation It is very important to keep all materials free of dirt, grease and moisture To get good adhesion when laminating we abrade lightly the surfaces of the Cu kapton layers with pumice and water using a brush Alignment A variety of fiducials needed to be included into the tape design as they were needed for manufacture and subsequent tape testing Dowel holes and fiducials used during tape manufacture Other fiducials have been added for measuring the physical dimensions of the tape and providing alignment for tape testing, stave core build and wire bonding Immersion nickel/gold plating Adhesiveless Copper/polyimide material is sensitive to the plating solutions. If it is excessively alkaline it will cause delamination of the copper tracks. We found we had to change to use the PCB facility at CERN. Espanex

Immersion nickel/gold plating defects

Co-curing Half-pipe jig To save glue and avoid the challenging gluing of large flat objects we do co-cure the tape with the carbon fibre facesheets 3 layers (0/90/0) of K13C2U(45gsm)/EX1515 Cure at 120°C Originally suggested by Oxford, tooling perfected by Berkeley To compensate for differential thermal expansion of tape and carbon fibre cure in an Ø10” Al half-pipe in the autoclave Lessons learned Prepreg needs to contain sufficient resin (otherwise delaminations within the facesheet) Facesheet must be free to expand/contract on the jig (otherwise facesheet creases) No excess carbon fibre around the electrical tape No sticking down of facesheet Release autoclave pressure before cool-down Resin bleed onto tape surface can be avoided by adding a 10mm sacrificial rim around the tape This rim is kept during stave build to prevent glue bleed in subsequent assembly steps and is milled away at the end of the sandwich production (tapes with shield layer) No excess CF ? And other 2 questions Cured tape side down Creased facesheet (carbon fibre stuck to jig) Resin bleed Sacrificial rim

Co-curing details EOS area has no tape → retains curvature of jig Easily flattened during sandwich production Slight dimpling on backside due to reduced tape thickness in cut-outs Filled with glue during sandwich production Co-cured CF/tape facesheet after assembly into stave sandwich Note mirror-like surface finish (global flatness ±100µm)

QA during tape production Optical inspection of pads Check uniformity and quality of the surface and dimensions Mechanical QA Check locations of bond pads to make sure that modules can be placed and wire-bonded correctly Electrical QA Measure resistance between all pads on the same net Check insulation between neighbouring lines HVIR (High Voltage Insulation Resistance) between HV lines Apply 500V to HV line and measure leakage current. Spec > 1GW. Many 100s of measurements per tape Need to repeat these measurements at different stages of stave core assembly → Automation essential. We have build a robotic system for this 2 independent probe heads with cameras for alignment xyz position control by linear stages (Range x 1.6m, y 0.6m) with 5μm resolution Spring loaded gold probe as used for industrial PCB probing This system is designed to automatically test a tape in less than 1h Specs will be defined with experience with prototypes I think we should also describe in words, what the robot is doing See next slide

Tape testing robot 0.6m 1.6m 2 independent probe heads with cameras for alignment with XYZ control Probes

Calibration of stage positions Use a calibration plate with 2cm×2cm grid of black dots in regular pattern covering the full travel area of the robot Actual positions of dots were calibrated with a Smartscope This calibration plate was then surveyed by the tape testing robot Produces a look-up table of robot coordinates vs real coordinates Intermediate positions from linear interpolation Good reproducibility (3-5μm RMS) Offsets between robot position and real coordinates up to ~200μm These offsets are larger than the size of the bond-pads, so calibration is necessary Similar results for both stages Stage1 stage displacements 1.6m 0.6m Graph is of difference between measure point (circle centre) and nominal These offsets arrow scale 500×

Tape dimensional accuracy After robot calibration we measured the position of features on the tape surface We found large deformations within the tape (order of 100µm) These are probably caused by the flexibility of the Kapton material during the lamination process We have also measure tapes made of FR4, distortions are much smaller there Range of offsets too large for probing (displacements are similar in size to the bond pads → probing would become impossible) Distortions are genuine (confirmed with Smartscope) Need to position the robot heads using local fiducials D y (m) Fiducial y x x (m)

Camera-to-probe calibration Offset 134mm An additional calibration required is to calibrate the offset of the probe position from the camera This was done using a PCB with a grid of traces and fiducials Find fiducials with the camera Scan probe over grid and measure resistance to find the grid lines Generate a lookup table and find offset by linear interpolation Copper grid lines Resistance map Fiducials

Test procedure Find tape position using robot cameras surveying global tape fiducials Position probe heads on tape Map nominal pads locations (from CAD file) to stage coordinates Additional correction using local fiducials to allow for tape distortions Include camera-probe offset Perform electrical tests Open circuit and short circuit tests HV insulation resistance testing >1GΩ Repeat from 2. Ø200μm Fiducials

Outlook for production For the complete phase II strip barrel ~500 tapes will be needed These will most likely be produced in industry As part of the distributed stave core production QA and co-curing will be done at several sites Several copies of tape testing robot needed

Conclusions We have designed and manufactured large tapes (1.3m long × 10cm wide) Cu/polyimide multi-layer tapes with fine pitch features 100µm track & gap Tape size only limited by tooling (exposure units, developing systems, laminate press) We have developed an automatic testing system for the QA of these tapes This is required for the final ATLAS stave manufacture (~500 stave cores) and by the large number of networks on each tape Tapes are dimensionally not very accurate (~100µm) Cannot rely on accurate position of bond pads for testing and subsequent stave assembly Co-curing of full-size tapes is now working reproducibly In principle size limited only by size of autoclave Shape can be moulded (here: flat, but other geometries seem possible)

Backup slides

Calibration plate survey arrow scale 500× Difference between Smartscope calibration and robot position measurement

Stage 2 Calibration Arrow: true to measured location Scale = 500

Smartscope measurements of tapes Measurements using Smartscope from part of another tape from same batch Measured HV pads also show large offsets

Measurements on FR4 Tape Offsets very much smaller  distortions of kapton tape are real D y (m)