1/10CCFW 34, Garching, June 24th TORE SUPRA Association Euratom-Cea S. BRÉMOND A few very simple technical elements on the internal / external matching.

Slides:



Advertisements
Similar presentations
Chapter 3 Matching and Tuning
Advertisements

CHAPTER 3: SPECIAL PURPOSE OP-AMP CIRCUITS
ENE 428 Microwave Engineering
Enabling Technology on Alcator C-Mod Jim Irby MIT-PSFC.
Power e Lab PowerELab Limitedwww.powerelab.com 1 An Active EMI reduction IC WT6001 POWERELAB LIMITED A Power Converter Technology Provider.
IEC Short-circuit current making and breaking tests Taiwan-European HVAC apparatuses Accreditation and Certification forum Harethe El Ouadhane.
Stephen Molloy RF Group ESS Accelerator Division
30 th September 2004 High Power RF Couplers James Rogers High Power RF Couplers ELSRF Daresbury Laboratory.
Chapter Fourteen: Transmission Lines
RF systems for MICE Andrew Moss The MICE RF Group and the TIARA WP7 Team Contributions include Daresbury, RAL, CERN, LBNL, LANL, FNAL, Strathclyde & Sheffield.
A NEW PRINTED QUASI-LANDSTORFER ANTENNA
Longitudinal instabilities: Single bunch longitudinal instabilities Multi bunch longitudinal instabilities Different modes Bunch lengthening Rende Steerenberg.
THALES ELECTRON DEVICES
Technician License Course Chapter 2 Radio and Electronics Fundamentals
Offset Quadruple-Ridge Orthomode Transducer, Mode Splitter/Combiner
Antennas and Propagation
HIAT 2009, 9 th June, Venice 1 DESIGN STUDY OF MEDICAL CYCLOTRON SCENT300 Mario Maggiore on behalf of R&D Accelerator team Laboratori Nazionali del Sud.
IOS-5.2 Maintaining ICRH Coupling in expected ITER regime Spokes person: M. Goniche M.-L. Mayoral (JET), R. Pinsker (DIII-D), L. Colas (TS), V. Bobkov.
Progress Towards RF Steady State Systems For Fusion Devices
M Nightingale/A WaldenArc Detection Meeting - JET - 4 August 2005 ARC DETECTION FOR THE EP ANTENNA - THE OPERATOR’S PERSPECTIVE Mark Nightingale, Tony.
RFID II Inductive and Microwave Systems
1 Association Euratom-Cea TORE SUPRA Tore Supra “Fast Particles” Experiments LH SOL Generated Fast Particles Meeting Association Euratom IPP.CR, Prague.
CCFW32 – 25th July 2002 – JETF. Durodié LPP-ERM/KMS1 Work program for Validation of External Matching for The ITER-ICRF System F. Durodié CCFW32, 25 July.
IC IDRM2: 18 May 2011 P. Dumortier et al. Slide 1 Validation of the Electrical Properties of the ITER ICRF Antenna using Reduced-Scale Mock-Ups P. Dumortier,
Euratom TORE SUPRA G. Bosia Proposals for the ITER IC System R&D CCFW /11/2004 Proposals for ITER IC systems R&D developments G. Bosia, B. Beaumont,
Frankfurt (Germany), 6-9 June 2011 ROSA – PT – S3 – 0249 EDP DISTRIBUTION AUTOMATION (r)EVOLUTION.
IMPEDANCE MATCHING IN HIGH FREQUENCY LINES UNIT - III.
Euratom TORE SUPRA G. Bosia “Matching ITER-like structures” Cadarache, Matching ITER-like structures G. Bosia.
Microwave Network Analysis
39th Meeting of the Co-ordinating Committee on Fast Wave Heating and Current Drive Arc Detection Meeting - JET - 4th August 2005 Presented by M. Graham.
Clustered Surface RF Production Scheme Chris Adolphsen Chris Nantista SLAC.
IEEE PES General Meeting, Tampa FL June 24-28, Chapter 3 Harmonic Modeling of Networks Contributors: T. Ortmyer, C. Hatziadoniu, and P. Ribeiro.
Management and Organisation of Electricity Use Electrical System Optimisation Belgrade November 2003.
June 1 rst, Consolidation for E-cloud and High Voltage cards N.Vauthier TE-CRG LS1 projects review:
Andrew Moss ASTeC CM32 9t h February 2012 RAL MICE RF System.
F. Durodié4-Aug-2005JET-EP ITER-Like Antenna / CCFW39 / JET Review of the Status of the Arc Detection Issues and Proposals for the JET-EP ITER-like ICRH.
Yi HUANG Department of Electrical Engineering & Electronics
Plasma Facing PFA Antenna Group POLITECNICO DI TORINO 19 Topical Conference on Radio Frequency Power in Plasmas June 1-3, Newport 1 Mitigation of.
CLARA Gun Cavity Optimisation NVEC 05/06/2014 P. Goudket G. Burt, L. Cowie, J. McKenzie, B. Militsyn.
Euratom TORE SUPRA G. Bosia “Automatic control of ITER-like structures” Venice, 21 – Automatic Matching of ITER-like structures Automatic Matching.
Switched-mode power supply charger Aarne Liski Jere Kinnunen Final presentation.
Modulators for DB klystrons: requirements and plans for developments Serge Pittet, David Nisbet TE EPC.
1 DWS- SOFT Load tolerant matching Evaluated the conjugate tee configuration in plasma conditions Strong current imbalance between the straps was.
1 Association Euratom-CEA P. Libeyre Pioneering superconductivity 23rd SOFT, Venice 21 September 2004 PIONEERING SUPERCONDUCTING MAGNETS IN LARGE TOKAMAKS.
Euratom TORE SUPRA  CEA comments on documents provided by the Project Leader Introduction I Performance issues II Operation Issues III. Manufacturing.
ENE 428 Microwave Engineering
SPL waveguide distribution system Components, configurations, potential problems D. Valuch, E. Ciapala, O. Brunner CERN AB/RF SPL collaboration meeting.
Garching,June 24 th, 2003F. Durodié LPP-ERM/KMS – CCFW Comments on the Report on Internal Matching for ITER Garching 24 June 2003.
Managed by UT-Battelle for the Department of Energy Vector Control Algorithm for Efficient Fan-out RF Power Distribution Yoon W. Kang SNS/ORNL Fifth CW.
Chapter 19 Principles of Electric Circuits, Conventional Flow, 9 th ed. Floyd © 2010 Pearson Higher Education, Upper Saddle River, NJ All Rights.
Power couplers Timergali Khabiboulline (FNAL) FNAL-LBNL meeting on NGLS April 13, 2012.
Electrical Consumption: why is ac important Consider a city such as Newark, DE. Assume that 30,000 citizens wish to dry their hair at the same time; that.
Antenna Matching Techniques
DESIGN OF A 9MHZ 15KW CW AMPLIFIER FOR RHIC Shane Dillon CTO.
Linac RF System Design Options Y. Kang RAD/SNS/NScD/ORNL Project – X Collaboration Meeting April , 2011.
ITER ICRF R&D - ERM-KMS proposals P. Dumortier, F. Durodié, R. Koch, P. Lamalle, F. Louche, A. Messiaen, R. Weynants CCFW 37, Brussels, 22 November.
Smith Chart & Matching Anurag Nigam.
CLIC Civil Engineering & Infrastructure Working Group Meeting
Development of X-band 50MW klystron in BVERI
6th CWRF 2010 Workshop - ALBA, May 4, 2010
Microwave Engineering by David M. Pozar Ch. 4.1 ~ 4 / 4.6
A frequency choice for the SPL machine: Impact on hardware
Second SPL Collaboration Meeting, Vancouver May 2009
F.Marcellini, D.Alesini, A.Ghigo
ENE 429 Antenna and Transmission lines Theory
ENE 429 Antenna and Transmission lines Theory
Transmission lines II 1.
Antenna Tuners Do Not Tune Antennas
Fields and Waves Lesson 1.5 TRANSMISSION LINES - LOAD MATCHING.
ENE 428 Microwave Engineering
Presentation transcript:

1/10CCFW 34, Garching, June 24th TORE SUPRA Association Euratom-Cea S. BRÉMOND A few very simple technical elements on the internal / external matching discussion of ITER IC Array S. BREMOND, G. BOSIA, B. BEAUMONT & TS ICRF Team

2/10CCFW 34, Garching, June 24th TORE SUPRA Association Euratom-Cea S. BRÉMOND Main ITER issues for IC antenna system* - High power density (~ 10 MW / m 2 required) RF voltage stand-off margins - Matching + load tolerance (ELMs) - Components reliability - Overall technical performance and margins * we need a grid to compare solutions

3/10CCFW 34, Garching, June 24th TORE SUPRA Association Euratom-Cea S. BRÉMOND RF Voltage stand-off 1/3 RF VoltageRF Electric field Strap to be minimized by antenna front geometrical design Feeder Min vswr for (strip line) E max depends above all on precise geometry (strip line to coaxial line transition) Un - matched VTL (external) Min at Z c = 60  Line models (Low losses, short straps) strap feeder Unmatched Vacuum Transmission Line (ext) or lumped capacitor (int) A F V, J

4/10CCFW 34, Garching, June 24th TORE SUPRA Association Euratom-Cea S. BRÉMOND RF electric field: more freedom to adjust geometry in internal matching up to 1.4 (ext.) > 1.1 kV/mm (int.) RF Voltage stand-off 2/3 RF Voltage: V max (ext.) (~ 36 kV) > V max (int.) (~ 28 kV) + maximum RF voltage point depending on frequency RF Current : up to 1.8 kA (ext.) > 1.1 kA (int.) High RF current (and voltage) at vacuum window F V J F F

5/10CCFW 34, Garching, June 24th TORE SUPRA Association Euratom-Cea S. BRÉMOND Impedance jumps and non TEM modes (external matching) Non TEM modes at impedance jump (while evanescent, still increase local RF field) by about 40% (from a first estimate) RF Voltage stand-off 3/3

6/10CCFW 34, Garching, June 24th TORE SUPRA Association Euratom-Cea S. BRÉMOND 1. External matching cannot apply conjuguate T principle; matching algorithm becomes an issue Matching 1/2 External matching: no more perfect cancellation of admittance imaginary part (which is the bigger) at junction when starting from matching at base loading (without Elms) - theoretical issue: optimisation to be performed to find best trade-off (no more perfect match at base loading) and thus complicated tuning procedure required - operational issue: no more possible to find matching experimentally at base loading G=0.5 C1C1 C2C2 RARA End of strap + feeder T branche 1 T branche 2 G=0.5 RARA l1l1 l2l2 End of strap + feeder T branche 2 T branche 1 Internal matchingExternal matching

7/10CCFW 34, Garching, June 24th TORE SUPRA Association Euratom-Cea S. BRÉMOND Matching 2/2 2. Uncontrolled power sharing is very likely to reduce power handling capabilities 1st VTL 2nd VTL 1st VTL 2nd VTL 1st VTL 2nd VTL 1st VTL 2nd VTL 1st VTL 2nd VTL 1st VTL 2nd VTL - Any asymmetry between branches (plasma loading, poloïdal mutual coupling between straps, VTLs, 4-port passive junction, etc…) will lead to power unbalance with no means of correcting it - Effect of unavoidable asymmetry can not be minimise because depending on frequency (junction to be made at voltage anti-node) - Effect on tuning procedure to be documented (high sensitivity expected)

8/10CCFW 34, Garching, June 24th TORE SUPRA Association Euratom-Cea S. BRÉMOND Components reliability External matching option 1. Unusual 4 ports passive junction to be developed an qualified Developing a compact broadband three way power divider compatible with ITER environment would certainly required much effort, design work, mock-up validation, let alone manufacturing difficulties for making the real thing. 2. Vacuum window (primary safety barrier) is in an unmatched section - it has to withstand higher RF current / voltage (typically 35 kV / 1.6 kA depending on frequency) than in the internal option (typically 8 kV / 0.4 kA) - The risk that an arc in the VTL drift to the window is enhanced 3. CW high power phase shifter are to be developed Internal matching option Enhancement of existing commercial units to be performed in order to make them compatible with tokamak and ITER environment

9/10CCFW 34, Garching, June 24th TORE SUPRA Association Euratom-Cea S. BRÉMOND Miscellaneous - power efficiency (RF losses) From strap to T junction, typically twice as high in the external matching option (~170 kW instead of 85 kW) - overall simplicity many components in the unmatched sections and many optimisations required for the external matching option - absence of in-vessel remotely operated component in external matching option: no significant gain in time for access and repair with external adjustable components (2 weeks cooled down required) - overall technical margins Possible hazard in the course of ITER experience (e.g. lower loading than expected) would hit: - many components technical margins in the external matching option (due to the very large resonant area, e.g. vacuum window which is a critical safety component) - mainly lumped capacitors technical margins in the internal matching option (large existing technical margins on upstream components)

10/10CCFW 34, Garching, June 24th TORE SUPRA Association Euratom-Cea S. BRÉMOND Tentative conclusion - Internal matching option with lumped capacitors is a well known scheme for which the issues are and will be even better documented (after JET-EP and TS ITER-like experience). Efforts have to be made on the enhancement of one particular component (capacitors) starting from existing commercial units to be adapted to ITER environment. - External matching proposed option seems to have lower technical margins (higher RF Voltage), raises new and tricky issues, requires many component development and qualification, without being grounded on existing experiences.