A case study of Quality Standards implementation in TASNEE Company ISO 9001: 2000, ISO 14001:2004 & OHSAS 18001 By Abdulgader Alharthi.

Slides:



Advertisements
Similar presentations
EMS Checklist (ISO model)
Advertisements

Integrated Management Systems
Department of Environmental Quality Environmental Management System Overview.
Richard Hibbert RSRL Quality, Assessment and Management Systems Manager Process management Requirements in IAEA Standards and Guides.
Environmental Management System Bruce Barnard Terry Parish Teresa Woodley.
Risk & Safety Presentation January 8, 2013 Bryan Sabari, CUSP Manager Corporate Safety
Contractor Management and ISO 14001:2004
1 Quality Management Standards. 2 THE ISO 9000 FAMILY ISO 9000: 2005 Identifies the fundamentals and vocabulary for Quality Management Systems (QMS) ISO.
Leadership and Strategic Planning
1 Pertemuan Keduapuluhenam Implementation and Control.
Leadership and Strategic Planning
Quality Management.
ISO 9000 and Total Quality: The Relationship Eng. Basel F. Qandeel.
QUALITY, ENVIRONMENTAL AND OCCUPATIONAL HEALTH AND SAFETY POLICY.
Management of Health & Safety Joe McNicholas July 2000.
Human Resource Management
KAPPA OIL SERVICES 1 VII INTERNATIONAL CONFERENCE NEFTEGAZSTANDARDT September 2012 St. PETERSBURG Alain LOPPINET.
QMS ISO 9001:2008 Introduction to QMS 9001:2008 and system auditing.
Presentation on Integrating Management Systems
Elements of Internal Controls Preventing Fraud, Waste, and Abuse in Urban and Rural Transit Systems.
NAKIMBRO Engineering and Contractors COMPANY PROFILE COMPANY PROFILE.
© 2011 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
1 Module 4: Designing Performance Indicators for Environmental Compliance and Enforcement Programs.
Ship Recycling Facility Management System IMO Guideline A.962
Health, Safety and Environment Policy. We are a SafeProduction organization At Vale, we are committed to sustainable development. Meeting the needs of.
Occupational Health & Safety
Implementation of ISO 14001/OHSAS TMS Consultancy Ltd.
Occupational Health and Safety
Basics of OHSAS Occupational Health & Safety Management System
Manage Project Procurement Unit Guide Diploma of Project Management Qualification Code BSB51507 Unit Code BSBPMG509A.
ISO 9000 and Public Awareness and Information Session 22 February 2006 Owen Glave, MBA-TQM.
Introduction to ISO 9001:2000.
Environmental auditing
CHALLENGING BOUNDARIES Rhodia way, The way we do business.
Hazards Identification and Risk Assessment
QUALITY MANAGEMENT STATEMENT
"To be the leader in the manufacture and sale of high quality building products with zero waste management culture and to sustain the business in a profitable.
Developing a Sustainable Procurement Policy and Strategy EAUC – EAF Programme.
PRODUCT STEWARDSHIP Code of Practice GCWellon June 2010.
ISO 9000:2000. Overview of the presentation Why so many companies adopt ISO? Why so many companies adopt ISO? What is ISO and ISO 9000:2000? What is ISO.
Pollution Prevention and Environmental Essentials Conference – 2002 How An EMS Can Enhance Your P2 Program Presented by Mike Garcia.
ISO 9001:2000 The 5 Phase Plan to Implementation Sterling, VA Terry & Associates Quality.
Responsible Care® Awareness for Managers 1. DISCUSSION POINTS 2 WHAT IS RESPONSIBLE CARE®? FEATURES OF RESPONSIBLE CARE® HOW DOES RESPONSIBLE CARE® ADD.
Quality Management Theory Terms, Concepts, & Principles.
The Second Annual Medical Device Regulatory, Reimbursement and Compliance Congress Presented by J. Glenn George Thursday, March 29, 2007 Day II – Track.
Alex Ezrakhovich Process Approach for an Integrated Management System Change driven.
OHSAS Occupational health and safety management system.
ICAJ/PAB - Improving Compliance with International Standards on Auditing Planning an audit of financial statements 19 July 2014.

HSE Interview Questions / Answers Series (Part 1)
UNDERSTANDING ISO 9001:2008.
WELCOME TO IQCS CERTIFICATION PRIVATE LIMITED (INDIA)
Steve Barfoot, President Advantage International Registrar, Inc.
Leadership and Strategic Planning Dr. EzzElarab Elawoor
GS-R-3 vs. ISO 9001:2008 Requirements - 4
Training Course on Integrated Management System for Regulatory Body
Integrated Management Systems
MODELOS DE GESTIÓN DE CALIDAD
Human Resource Management
Overview of ISO 9001:2015 –Quality Management SysteM
Quality Management Systems
RESPONSIBLE CARE WORKSHOP 29 november 2017
ISO 9001:2015 Quality Management System
Lockheed Martin Canada’s SMB Mentoring Program
QUALITY MATTERS - OVERVIEW OF ISO QUALITY MANAGEMENT SYSTEM
Our New Integrated Business Management System [“IMS”]
ISO 9001:2008 Quality Management Systems
ISO management systems
Urban Engineers ISO 9001:2015 General Overview
How to conduct Effective Stage-1 Audit
Presentation transcript:

A case study of Quality Standards implementation in TASNEE Company ISO 9001: 2000, ISO 14001:2004 & OHSAS By Abdulgader Alharthi

Outline Introduction Literature Review Methodology Case Analysis and Discussion Conclusion

Introduction ISO 9001:2000 Provide guidance in the development and implementation of an effective quality management system Demonstrate organization ability to consistently provide product that meets customer and applicable regulatory requirements

ISO : 2004 Requirements for an environmental management system Enable an organization to develop and implement a policy and objectives which take into account legal requirements about significant environmental aspects

OHSAS : 1999 Occupational Health & Safety Management Systems Superseded the BS8800:1996 Guide Enable an organization to control its OH&S risks and improve its performance. It requires an organization to conduct a risk assessment, and manage those risks that must include objectives to demonstrate continuous improvement

Literature Review 1/2 Adopting an international standard is a concrete strategy for increasing competitiveness (Ritter, 1998) Firms that have successfully adopted ISO 9000 are likely to exhibit higher levels of quality improvement, business excellence, international competitiveness, cost reduction, human resource development, and customer orientation (Huarng, F,1999)

Literature Review 2/2 Different research shows that companies who adapted ISO reports significant improvements in their operating and manufacturing procedures after adopting ISO (Darnall, 2001) – Increased employee involvement – Increased document control – Improved operational control – Improved calibration and retooling – Increased process automation – Increased reuse of chemicals and water in production cycles

Methodology A case study approach was used to write this paper The information was gathered through review of available documentation and observations/interviews of personnel involved in the implementation of the quality management system

Case Analysis and Discussion The Integrated Quality Management System in TASNEE/SPC was developed to meet the mission statement of the organization and to comply to the three international standards

Integrated Quality Management System Model in Tasnee D C A P CUSTOMERS, STAKEHOLDERS Requirements Continual Improvement Management Responsibility Product realization Resource Management Measurements Analysis and Improvement C U S T O M E R S, S T A K E H O L D E R S Satisfaction Suppliers, Contractors, Partners QM S InputOutput Product Realization

Steps to develop the system Identified the processes needed for the quality, safety, health & environment management system and their application throughout the organization Determined the sequence and interaction of these processes Determined the criteria and methods needed to ensure that both the operation and control of these processes are effective

Steps to develop the system (cont.) Ensured the availability of resources and information necessary to support the operation and monitoring of the processes Monitored, measured and analyzed these processes Implementing actions necessary to achieve planned results and continual improvement of all of these QSHE and business processes

Conclusion Great system that took a lot of effort and resources to develop Need to be used on daily activities by all members of the organizations The system needs to be communicated properly to all employees The critical success factor is full commitment from management team to the system practice in all organization levels

Thank you !!!