Implementing one of the most ambitious renewable energy standards in the country CALIFORNIA’S Implementing one of the most ambitious renewable energy standards.

Slides:



Advertisements
Similar presentations
California Transmission Planning Group Presentation to: WECC Transmission Expansion Planning Policy Committee June 16-17, 2010 TANC.
Advertisements

General Information on Permitting Electric Transmission Projects at the California Public Utilities Commission June 2009 Presentation created by the Transmission.
California Energy Commission Retail Electric Rate Scenarios: Key Drivers and Structure 2015 Integrated Energy Policy Report California Energy Commission.
David Howarth MRW & Associates Oakland, California 1 JUST THE FACTS: RESOURCE PLANNING AND PROCUREMENT INDEPENDENT ENERGY PRODUCERS ANNUAL.
Transmission Corridor Zone Designation Process Terrence O'Brien, CEC December 11, 2007 Energy Action Plan.
Energy Storage in California’s Grid of the Future Don Liddell, Douglass & Liddell Co-Founder and General Counsel, California Energy Storage Alliance ​
OVERVIEW OF RPS CALCULATOR FUNCTIONALITY 1. Model Specification Model developed to provide plausible portfolios to CPUC LTPP and CAISO TPP to facilitate.
California Public Utilities Commission Regulation and Natural Gas Infrastructure Richard Myers CPUC Energy Division May 14, 2009.
CALIFORNIA’S LEADERSHIP IN RENEWABLE ENERGY: BUILDING AN ENVIRONMENTALLY AND ECONOMICALLY SUSTAINABLE FUTURE Manal Yamout Special Advisor to the Governor.
CALIFORNIA’S PROGRESS IN RENEWABLE ENERGY November 2012 Michael Picker Senior Advisor to the Governor for Renewable Energy Facilities.
IMPERIAL VALLEY CONFERENCE July 21, SOLICITATION RENEWABLES PORTFOLIO STANDARD.
May 22-23, 2008 ACC BTA Workshop May 22-23, 2008 Regional Renewable Energy Transmission Initiatives Laurie Woodall K.R. Saline and Associates, PLC Arizona.
Implementing one of the most ambitious renewable energy standards in the country California’s Renewable Energy Programs Implementing one of the most ambitious.
Implementing one of the most ambitious renewable energy standards in the country CALIFORNIA’S Implementing one of the most ambitious renewable energy standards.
Regulations Governing Siting of Electric Facilities in California AEP Orange County Chapter June 30, 2009 Christine McLeod, Project Manager - Regulatory.
California Energy Action Plan Tim Tutt California Energy Commission Dan Adler California Public Utilities Commission June 24, 2004 Goal II – Accelerate.
California Energy Commission Renewable Energy in California Rasa Keanini and Heather Raitt Renewable Energy Program Efficiency, Renewables & Demand Analysis.
IEPR Response Joe Desmond Resources Agency Deputy Secretary for Energy Joint Energy Action Plan Meeting March 23, 2005.
Energy and Economy Transition California’s energy system to a highly efficient, renewables-based system and electrify transportation.
Renewable Energy and the BLM May 4, 2009 Ashley Conrad-Saydah BLM Renewable Energy Project Manager.
Summary of PV Potential Assessment in RETI and the 33% Implementation Analysis Re-DEC Working Group Meeting December 9, 2009.
Charles Hosken, General Manager Imperial Irrigation District
Laura Doll Deputy Executive Director, CPUC October 18, 2006 Platt’s CA Power Market Forum C ALIFORNIA P UBLIC U TILITIES C OMMISSION Fulfilling Resource.
Wyoming Infrastructure Authority Developing Electric Infrastructure for the Future of the West Energy Gateway Update Presented by Darrell T. Gerrard Vice.
1 Introduction, scope, context Terminology, high-level approach Methodology, Inputs, Assumptions –Portfolio development –Discounted core –Environmental.
Oregon Renewable Energy Action Plan April 2005 with Geothermal Energy highlights by Carel DeWinkel Senior Policy Analyst.
Renewables Portfolio Standard: Progress and Perspectives Aaron J. Johnson Director, Renewable Energy Policy & Strategy February 1, 2011.
California’s Renewable Energy Credits (REC) Market Update
Eagle Crest Energy Company February Page 2 New Hydro: Making it Happen Background on the Eagle Mountain Pumped Storage Project Need for Eagle.
Transmission Planning at the California ISO September 10, 2015.
1 Encouraging Solar Development in California Commissioner Mark Ferron California Public Utilities Commission July 13, 2011.
R / I Workshop Agenda Introductions and housekeeping1:00pm Objectives and scope1:10pm Background  Public Utilities Code :15pm.
Presentation Title SOUTHERN CALIFORNIA EDISON® SM SOUTHERN CALIFORNIA EDISON® SM Integrated Planning & Environmental Affairs Energy Agencies in California.
Challenges in Building Transmission in California Power Association of Northern California P.J. Martinez VP, Engineering Pacific Gas & Electric Company.
California Energy Commission Renewable Energy Transmission Initiative (RETI) Part I Jeffrey D. Byron California Energy Commission Energy Action Plan (EAP)
Rob Oglesby Executive Director California Energy Commission C ALIFORNIA E NERGY P OLICY G OING F ORWARD.
California Energy Commission Options for Developing Contingency Mitigation Measures 2015 Integrated Energy Policy Report UC Irvine Campus, Irvine, California.
California Independent System Operator Joint Agency Energy Action Plan Meeting Generation Interconnection Queuing & Streamlining Dennis Peters, Lead Interconnection.
Icfi.com © 2006 ICF International. All rights reserved. Wyoming Collector and Transmission System Project – Status Report Presented to: Wyoming Infrastructure.
THE MIX: FACTS, FIGURES, AND THE FUTURE INDEPENDENT ENERGY PRODUCERS ANNUAL MEETING SEPTEMBER 26, 2013 William A. Monsen MRW & Associates Oakland, California.
PowerButte: Solar Overlay Tim Snellings, Director Department of Development Services Photo courtesy of Shamim Mohamed A Place For Clean Energy.
Electric Transmission Lines and Utility Corridors.
California Transmission Planning Group Collaborative approach to State-wide Transmission Planning.
California’s Renewable Energy Transmission Initiative Anne Gillette Renewable Energy Policy Analyst California Public Utilities Commission August 12, 2008.
R E T I Coordinating Committee California’s Renewable Energy Transmission Initiative: Status Update California Public Utilities Commission California Energy.
March 30, 2012 Wholesale Generation Interconnection Process Photovoltaic Program Power Purchase Agreements Request for Offers.
What do we mean by “Energy?
1 Sunrise Powerlink Project Update Orange County Business Council March 10, 2009.
1 August 3, 2015 Environmental Considerations in RPS Calculator CEC IEPR Workshop.
2010 Long-Term Procurement Plan 33% RPS Calculator Training California Public Utilities Commission January 7, 2011.
Renewable Energy Transmission Initiative 2.0 Organizational Structure and Work Plan California Energy Commission and California Public Utilities Commission.
. PANC Annual Conference May 16, 2012 Progress on the California RPS.
Renewable Energy in California: Implementing the Governors Renewable Energy Executive Order California Energy Commission Department of Fish and Game Fish.
C A L I F O R N I A E N E R G Y C O M M I S S I O N Integrated Energy Policy Report Workshop Landscape-Scale Environmental Evaluations for Energy Infrastructure.
California Energy Commission An Overview of the Renewable Energy Transmission Initiative (RETI 1.0) Joint Agency Workshop to Introduce the Renewable Energy.
Imperial Valley Study Group Transmission Planning Collaborative 2005 California Geothermal Summit June 9, 2005 California Geothermal Energy Collaborative.
CALIFORNIA ENERGY COMMISSION Renewable Energy Transmission Initiative (RETI)
California Energy Commission California’s Transmission Planning Experience for Renewable Energy Joint Agency Workshop to Introduce the Renewable Energy.
California Energy Commission The Loading Order – How Are We Doing? Jackalyne Pfannenstiel Chairman California Energy Commission Independent Energy Producers.
California Energy Action Plan December 7, 2004 Energy Report: 2004 and 2005 Overview December 7, 2004.
Long Term Transmission Integration Planning at the California ISO Intermittency Analysis Project (IAP) Energy Commission Staff Workshop February 13, 2007.
Renewables Portfolio Standard Status Report California Public Utilities Commission February 26 th, 2008.
Overview: California Renewables Portfolio Standard (RPS) Program Presented by Paul Douglas RPS Program Manager California Public Utilities.
Planning the Networked Grid Transmission Planning J.E.(Jeff) Billinton Manager, Regional Transmission - North Building the Networked Electricity Grid –
WGA Consultants Keyes & Fox LLP is a law firm that specializes in the renewable energy and distributed generation sectors. K&F has in-depth experience.
4/16/2010 Regional Planning Group Meeting Long-Term Planning Study of the ERCOT Interconnection Warren Lasher Manager, System Assessment.
CPUC Resource Adequacy Program – LAO briefing May 25, 2009.
LNBA Subgroup: Avoided Transmission Value
November, 2008.
SunZia Project Description
Presentation transcript:

Implementing one of the most ambitious renewable energy standards in the country CALIFORNIA’S Implementing one of the most ambitious renewable energy standards in the country California Public Utilities Commission RENEWABLES PORTFOLIO STANDARD May 21, 2010

2 California’s RPS Goals Retail energy sellers must procure 20% renewable energy by 2010 –All RPS-obligated retail sellers* must procure an incremental 1% of retail sales per year until 2010 –20% obligation continues post-2010 RPS procurement compliance is measured in terms of electricity deliveries, not signed contracts California has set itself a further goal of 33% by 2020 *RPS-obligated entities include: Investor owned utilities, energy service providers, small and multi-jurisdictional utilities, and community choice aggregators. Municipal utilities (not regulated by the CPUC) have a voluntary RPS obligation.

3 Progress Towards 20% RPS CPUC has approved 142 contracts for over 12,500 MW of new and existing eligible renewable energy capacity (about 4,000 from out-of-state) –~7,000 MW of contracts under review, >2,000 MW from out-of-state 1049 MW of renewable energy has come online since the start of RPS program in 2003; 357 MW in 2009 IOUs are forecasted to achieve 20% RPS in the 2011 – 2012 timeframe Recent RPS solicitations have been robust: –Increased participation from larger and more experienced developers –Dramatic increase in number of solar PV bids –2009 RPS solicitation resulted in 100,000 GWh of bids –Shortlisted 2009 bids would meet half of IOUs’ 33% target

44 Progress Towards 20% RPS

5 Large IOUs – RPS Bids by Fuel Type 5

6 Renewable Energy Transmission Initiative Statewide collaborative effort to identify and facilitate the development of transmission to access the most cost-effective and environmentally-preferable renewable resources in CA and neighboring states Engages a broad range of stakeholders early in the planning process –Environmentalists, ratepayer advocates, tribal representatives –Transmission owners, load-serving entities, generation developers –CPUC, California Energy Commission, California Independent System Operator, local governments –Federal agencies and the military

7 Phase 1 Results (updated May 2010): CREZ and non- CREZ resources identified throughout the study area

8 Example: Southeast California Resource Area

9 Phase 1 Results (as updated in Phase 2)

10 RETI Phase 2A Results Report presents new, transparent, objective methodology for conceptual planning, in a process that supports active participation by diverse stakeholders. Base case scenario evaluates 102 network line segments: – 23 “Renewable Foundation” Lines – 13 “Renewable Delivery” Lines – 12 groups of “Renewable Collector” Lines, grouped by resource area Relative value of line segments to deliver renewable energy, and relative environmental concern assessed Foundation Lines, Delivery Lines recommended for immediate study at California ISO, POUs – “least regrets” additions to CA grid

11 RETI Phase 2 Conceptual Plan – Northern California

12 RETI Phase 2 Conceptual Plan – Southern California

13

14 RETI’s Current Activities Coordinating with newly-formed California Transmission Planning Group –Provided two 33% RPS scenarios for CTPG planning –Rating environmental impact of new line segments identified by CTPG –CTPG’s statewide conceptual plan would be input to formal CAISO planning process under new CAISO proposal Supporting transmission corridor designation at CEC Coordinating with Desert Renewable Energy Conservation Plan, BLM Solar PEIS, other planning activities as appropriate Providing input into CPUC’s long-term resource planning work

15 CPUC’s bi-annual Long-Term Procurement Plan (LTPP) proceeding authorizes IOU procurement of conventional generation resources, with a 10-year planning horizon 2010 LTPP considers needs to 2020 – a 33% by 2020 RPS would have substantial implications for the amount and type of needed conventional generation CPUC staff using RETI and contracting activity to develop 3-5 renewable generation scenarios, representing possible 33% RPS futures in –IOUs would file LTPPs that include the conventional generation and transmission needed to accommodate these RPS scenarios. Decision on conventional need determination expected in late 2011, but it will not direct renewable procurement Long-Term Planning for Renewables 15

16 33% of 2020 Retail Sales Approach to 33% RPS Scenario Development 16 RPS generation under dev’t & contracted to CA by Q Discounted Core Cost- constrained Scenario Time- constrained Scenario Environmentally- constrained Scenario Trajectory Scenario RPS generation delivering to CA by Q GWh/yr

17 Umbrella LTPP proceeding considers EE, demand response, distributed generation, utility-scale renewables, fossil retirements, when determining overall system need –CPUC must consider these same things when assessing the need for individual transmission projects, pursuant to statute CPUC and California ISO signed MOU on May 13, 2010 –Agrees on certain elements of the ISO’s new proposed annual Transmission Planning Process –Commits to closer coordination between resource and transmission planning – ISO planning process considers scenarios provided by CPUC, CPUC gives substantial weight in the permitting process to projects consistent with ISO plan Coordinating Resource & Transmission Planning 17

18 Ensure timely transmission access to viable, priority generation resources – resource planning is not the core competency of California ISO/CTPG Smooth transmission need determination – CPUC can give greater deference to projects resulting from CAISO/CTPG planning if assumptions and alternatives considered there are consistent with LTPP Reducing risk of successful legal challenges to CPUC need determination – Inconsistency between resource assumptions adopted in LTPP (EE and DG levels, etc.) and those used to justify a transmission line leaves CPUC transmission need determination vulnerable Why is this coordination important? 18

19 More Information CPUC RPS Website: Long-Term Procurement Plan proceeding: Transmission Siting and Environmental Permitting: Questions: Anne Gillette, Renewable Procurement and Resource Planning Phone: Ken Lewis, Electric Transmission Planning, Permitting, and Reliability Phone:

20 Electric Generation and Transmission Permitting in California May 21, 2010 Ken Lewis Deputy Director Energy Division CPUC

21 Topics to be Discussed  Current Permitting Processes in California  Initiatives to Streamline CPUC Permitting  Renewable Transmission Permitting Status

22 Permitting Electric Generation  Conventional Thermal and Solar thermal Projects over 50 MW. California Energy Commission And BLM if on BLM controlled property  Conventional Thermal projects less than 50 MW, Wind, and Photovoltaic (PV) Projects County And BLM if on BLM controlled property

23 Permits needed to Construct Transmission lines  Construction Permits for Transmission Lines CPUC  Certificate of Public Convenience and Necessary (CPCN) For Project voltages greater than 200 kV  Permit To Construct (PTC) For project voltages less than 200 kV and greater than 50 kV If on federal controlled land – Need NEPA review and a Record of Decision (ROD)

24 Other Possible Permits Need From The State  State Water Resources Control Board (SWRCB)  California Department of Fish and Game (CDFG)  States Lands Commission  California Coastal Commission  CalEPA

25 Possible Federal Permits Required  Bureau of Land Management (BLM)  US Forrest Service (USFS)  United State Fish and Wildlife (USFW)  Army Corp of Engineers

26 Permit Streamlining Done in last Five Years  Pre-filing Review Work with the applicant during the development of their alternatives Collaborate on visual simulations  Run all the simulations only once Oversee biological and cultural surveys early  Try to do only once

27 CPUC Permitting Streamlining  Clarified Proponents Environmental Assessment (PEA) checklist  Earlier agency outreach to avoid misunderstandings and establish time lines  Pre-filing meetings with utility to get a complete application  Joint CPUC/ NEPA documents to avoid duplication  Use other state and federal agency’s or county environmental documents

28 CPUC Permitting Streamlining  Regular Meetings with all other Agencies together at one time: BLM, USFS, USF&W, State F&G, CalEPA, State Parks, States Land Commission, USEPA, Army Corp of Engineers, State Water Resources Control Board Out  Held web workshop with cities and counties  Regular meetings with the Utilities on what is and what is not working

29 CPUC Permitting That Needs Review and Possible Modification  The number of mitigation measures and their complexity

30 Renewable Transmission Applications Since 2004  Tehachapi One of four purely renewable projects filed with the CPUC since 2004 CPUC ordered SCE to file the first two CPCN’s for this project Project includes 11 transmission segments 4500 MW Construction of segments 1 – 3 completed November 2009 CPUC Permitting of segments 4 – 11 completed March 2009 Joint CPUC/USFS Project Waiting on USFS ROD for two segments Construction completion 2015

31 Renewable Transmission Applications Since 2004  SDG&E Sunrise Power Link Application filed December MW ~100 miles Joint CPUC/USFS Project CPCN approved December 2008 Waiting for USFS ROD A lot of NIMBY’s Construction completion 2012

32 Renewable Transmission Applications Since 2004  SCE Ivanpah Project Application filed May 2009 Estimated Approval December 2010 ~26 Miles 1400 MW Joint CPUC/BLM Project  SDG&E ECO Substation Application Filed August 2009 Estimated approval December MW of connected renewables Joint CPUC/BLM Project

33 Renewable Transmission Applications Since 2004  Devers-Palo Verde 2 (DPV2) Originally approved January 2007 on economics, but modified as a renewables interconnection project in November MW ~100 Miles Connection for renewable projects along the highway I10 corridor Construction complete in 2014

34 Renewable Energy Policy Group  Currently working on September 2010 CEC/BLM approval for 25 Wind and Solar projects in three CREZ’s to meet ARRA funding December 31, 2010 deadline Maximum capacity is 9153 MW for the 25 projects Probable capacity will be 20 projects and 7751 MW

35 Renewable Energy Policy Group  CAISO Phase II studies in June will identify future transmission cluster upgrades Could have impact on solar developers projects Large Generator Interconnection Agreements (LGIA)  Renewable Energy Action Team (REAT) established by Governor’s Executive Order of November 2008 Purpose is a one-stop shop for renewable permitting in the desert Draft Desert Renewable Energy Conservation Plan (DRECP) to be completed in December 2010 with a final by June 2012  Will have impact on available land in the desert  Possible impact on transmission routing

36 Finally  We need a specific (real) transmission plan with projects that have preliminary engineered routing corridors soon if California is make its 2020 RPS 33% goal