Integrated Distribution & Production Planning (DP/PP) EIN 5346 Logistics Engineering (MSEM, Professional) Fall, 2013 Integrated Distribution & Production.

Slides:



Advertisements
Similar presentations
Intracompany Stock Transfer Scenario Overview
Advertisements

Chapter 3 Network Planning.
Logistics Network Configuration
Master Data for SCM (1) Master Data for Demand Planning & Fulfillment Processes EGN 5623 Enterprise Systems Optimization (Professional MSEM) Fall, 2012.
0 © 2009 Wellesley Information Services. All rights reserved. Implement SAP ERP Consumption-Based Planning Functionality for Your Non-Critical Production.
The Production Process
The Material Requirements Planning Process
Supply Chain Design Problem Tuukka Puranen Postgraduate Seminar in Information Technology Wednesday, March 26, 2009.
Material Planning Process
University of Southern California Enterprise Wide Information Systems The Procurement Process Instructor: Richard W. Vawter.
Supply Chain Management
Rough-Cut Capacity Planning in SCM EGN 5623 Enterprise Systems Optimization (Professional MSEM) Fall, 2011.
Transportation Planning EGN 5623 Enterprise Systems Optimization (Professional MSEM) Fall, 2011.
LOGISTICS OPERATION Industrial Logistics (BPT 3123)
Istanbul Kultur University Enterprise Wide Information Systems The Procurement Process.
OMSAN LOJİSTİK. Information Systems to Inventory Management Inventory Planning and Management Latin America Logistics Center Logistics Management Series.
Deployment & Available-to-promise (ATP) in SCM EGN 5623 Enterprise Systems Optimization (Professional MSEM) Fall, 2011.
Aggregate Planning and Resource Planning Chapters 13 and 14.
Master Data for SCM (1) Master Data in Demand Planning & Fulfillment Processes EGN 5346 Logistics Engineering (MSEM, Professional) Fall, 2013.
ISQA 407 Introduction to Global Supply & Logistics Management Winter 2012 Portland State University.
Rough-Cut Capacity Planning in SCM EIN 5346 Logistics Engineering (MSEM, Professional) Fall, 2013.
SCM Master Data - 2 Master Data for Distribution & Production Processes EGN 5346 Logistics Engineering (MSEM, Professional) Fall, 2013.
Sinha and Kotzab: Supply Chain Management, Copyright © 2012 by Tata McGraw-Hill Education CHAPTER 8 Production Planning and Scheduling.
1 Copyright © 2004, Manugistics, Inc. All rights reserved. Objectives At the end of this section you will be able to:  Understand the key pains and challenges.
Production Planning and Detailed Scheduling (PP/DS) in SCM EGN 5623 Enterprise Systems Optimization (Professional MSEM) Fall, 2011.
SCM Master Data - 2 Master Data for Distribution & Production Processes EGN 5623 Enterprise Systems Optimization Fall, 2012.
Rough-Cut Capacity Planning in SCM EGN 5623 Enterprise Systems Optimization (Professional MSEM) Fall, 2012.
Supply Chain Management
Transportation Planning EGN 5346 Logistics Engineering (MSEM, Professional) Fall, 2013.
Master Data for SCM (1) Master Data in Demand Planning & Fulfillment Processes EGN 5623 Enterprise Systems Optimization (Professional MSEM) Fall, 2011.
Transportation Planning EIN 5346 Enterprise Systems Optimization Fall, 2015.
Main Function of SCM (Part II). Main Functions  Procurement (supplier selection, optimal procurement policies, etc.)  Manufacturing (plant location,
Integrated Distribution & Production Planning (DP/PP) EGN 5623 Enterprise Systems Optimization (Professional MSEM) Fall, 2011 Integrated Distribution &
Intelligent Supply Chain Management Strategic Supply Chain Management
I2 U Intelligent Supply Chain Management Course Module Twelve: Inventory Deployment.
Transportation Planning EGN 5623 Enterprise Systems Optimization Fall, 2013.
SCM Master Data - 2 Master Data for Distribution & Production Processes EGN 5623 Enterprise Systems Optimization (Professional MSEM) Fall, 2011.
Systems Integration EGN 5623 Enterprise Systems Optimization (Professional MSEM) Fall, 2012 Systems Integration EGN 5623 Enterprise Systems Optimization.
Integrated Distribution & Production Planning (DP/PP) EIN 5346 Logistics Engineering Fall, 2015 Integrated Distribution & Production Planning (DP/PP) EIN.
Systems Integration EGN 5623 Enterprise Systems Optimization (Professional MSEM) Fall, 2011 Systems Integration EGN 5623 Enterprise Systems Optimization.
Rough-Cut Capacity Planning in SCM EIN 5346 Logistics Engineering Fall, 2015.
Transportation Planning EIN 5346 Enterprise Systems Optimization Fall, 2015.
Transportation Planning EGN 5623 Enterprise Systems Optimization (Professional MSEM) Fall, 2012.
Systems Integration EGN 5623 Enterprise Systems Optimization Fall, 2013 Systems Integration EGN 5623 Enterprise Systems Optimization Fall, 2013.
Rough-Cut Capacity Planning in SCM Theories & Concepts
Online | classroom| Corporate Training | certifications | placements| support CONTACT US: MAGNIFIC TRAINING INDIA USA :
Online | classroom| Corporate Training | certifications | placements| support CONTACT US: MAGNIFIC TRAINING INDIA USA :
SAP MATERIALS MANAGEMENT(MM) TRAINING IN SOUTHAFRICA,AUSTRALIA
MRP (Material Requirement Planning) The main function of material requirements planning is to ensure material availability on time. MRP helps monitor the.
Sap Apo Online Training And Certification Online | classroom| Corporate Training | certifications | placements| support CONTACT US: MAGNIFIC TRAINING INDIA.
www. magnifictraining.com Online | classroom| Corporate Training | certifications | placements| support Online | classroom| Corporate.
The Material Requirements Planning Process
Make-to-Stock Scenario Overview
ERP & APO Integration Theories & Concepts
Schlenker, H. , R. Kluge, and J. Koehl
Rough-Cut Capacity Planning in SCM Theories & Concepts
Rough-Cut Capacity Planning in SCM EGN 5623 Enterprise Systems Optimization (Professional MSEM) Fall, 2011.
Make-to-Stock Scenario Overview
ERP & APO Integration Theories & Concepts EGN 5623 Enterprise Systems Optimization (Professional MSEM) Fall, 2011.
Deployment & Available-to-promise (ATP) in SCM Theories & Concepts
SCM Master Data - 2 Master Data for Distribution & Production Processes EGN 5623 Enterprise Systems Optimization (Professional MSEM) Fall, 2011.
Transportation Planning Theories & Concepts EGN 5623 Enterprise Systems Optimization (Professional MSEM) Fall, 2011.
Enterprise Systems Optimization Spring, 2012
Integrated Distribution & Production Planning (DP/PP) EGN 5623 Enterprise Systems Optimization (Professional MSEM) Fall, 2012.
Integrated Distribution & Production Planning (DP/PP) EGN 5623 Enterprise Systems Optimization (Professional MSEM) Fall, 2011.
Transportation Planning EGN Enterprise Systems Optimization Fall, 2012
Production Planning and Detailed Scheduling (PP/DS) in SCM EGN 5623 Enterprise Systems Optimization Fall, 2012.
SCM Master Data - 2 Master Data for Distribution & Production Processes EGN 5346 Logistics Engineering Fall, 2015.
Master Data for SCM (1) Master Data in Demand Planning & Fulfillment Processes EGN 5346 Logistics Engineering Fall, 2015.
Presentation transcript:

Integrated Distribution & Production Planning (DP/PP) EIN 5346 Logistics Engineering (MSEM, Professional) Fall, 2013 Integrated Distribution & Production Planning (DP/PP) EIN 5346 Logistics Engineering (MSEM, Professional) Fall, 2013

Integrated Distribution Planning & Production Planning (DP/PP) Theories & Concepts Integrated Distribution Planning & Production Planning (DP/PP) Theories & Concepts

SCM Overview SCM aims at managing and optimizing the information flow and the material flow through a network of suppliers, manufacturers, distributors, and customers.

SCM Overview

Traditionally, distribution planning and production planning are carried out, independent of each other. Each seeks its own local optimum. In SCM, distribution planning and production planning decisions should be integrated to promote global optimum. This integrated distribution and production planning aims at : Reducing the costs for sourcing products and raw materials, Improving customer service, Dramatically reducing on-hand stocks, and Making better use of company resources.

An Integrated DP/PP Problem

An integrated DP and PP problem: Suppose a supply chain system contains two distribution centers (XXW1 and XXW2) and two plants (XX01 and XX02). There are two finished products for selling: GIN and KORN. GIN is produced in both plants XX01 and XX02, and KORN is only produced in plant XX02. The key semi-finished good for both products is ALC, which is only produced in plant XX01 and can be sent from the plant XX01 to XX02. The DC XXW1 is supplied from both plant and DC XXW2 is supplied only by XX02 (see the Figure 10.1) This is a classical transportation problem.

An Integrated DP/PP Problem Some planning decisions include: 1. Determine the source for warehouse XXW1: Procure GIN from XX01 or XX02, depending on the load in plants XX01 and XX02. 2.Prioritize production for plant XX02: Produce GIN for both warehouses XXW1 or XXW2, depending on whether XX01 has the capacity to supply additional quantities to XXW1. 3.Prioritize the production in plant XX02: Produce GIN or KORN, depending on the product priorities.

An Integrated DP/PP Problem 1.Handle ALC: to ship ALC to XX02 or process it in XX01, depending on the production costs, the market and the product priorities and the demand structure in XX02. 2.Balance the loads for GIN between plants XX01 and XX02 depending on the production costs, the lot size dependent production costs and the capacity extension costs and possibilities. 3.Make trade off To optimize the lot size that strikes a balance between set-up cost and storage cost, while improving sales flexibility.

The SNP Optimiser Objective: The SNP optimiser is to plan the entire supply chain (i.e., from distribution, production to procurement) at optimal costs by modelling the complete supply chain as linear equations and solve them by linear programming (LP) or mixed integer linear programming (MILP). The difference between the two (LP and MILP) lies in the consideration of discrete decisions, as lot size intervals.

The SNP Optimiser Objective function: Min {  product [(D –S) * Penalty + S * Cost supplychain ]} where D: the total demand quantity; S: total supply quantity (which is product and location dependent). The supply chain costs contain cost for production, procurement, transport, storage and handling. The penalties are cost for lateness, non-delivery and safety stock violation. SNP optimizer considers only one time interval at a time.

The SNP Optimiser The constraints for the plants are: P GIN-XX01 <= C GIN-XX01 P GIN-XX02 + P KRON-XX02 <= C GIN-KRON-XX02 P GIN-XX02 <= C GIN-XX02 P KRON-XX02 <= C KRON-XX02 P ALC-XX01 <= C ALC-XX01 P GIN-XX01 + P GIN-XX02 + P KRON-XX02 <= BOM Ration * P ALC-XX01 Where P: is the produced quantity, C: is the production capacity.

The SNP Optimiser The penalties for non-delivery and lateness are maintained in the product master either globally or locally (by product-location). The supply chain costs are maintained in the master data for product, PDS, PPM, resource capacity variant and transportation lane. The SNP optimiser takes the production, transport, storage and handling costs into account for global optimization.

The SNP Optimiser By setting these costs, we can model for decisions such as: Extend production capacity in a plant or procure from a different plant considering increased production and transport costs, Extend production capacity in a plant or procure externally Switch to a more expensive transport method to speed up the transportation, Switch to another source if a transport capacity is already consumed, and Produce and ship just in time to minimise storage costs. The more sourcing alternatives exists, the more complicated the planning problem becomes.

The SNP Costs Cost are used in SNP optimization to define the objective function. Related SNP costs are listed in Table 10.2

The SNP Costs for Optimisation

The SNP Costs The penalty costs for safety stock are defined with the number of stock-out days. The storage costs are calculated as stock quantity multiplied by the number of time buckets (or in addition, multiplied by the number of days per bucket), according to the setting. Costs for delay and non-delivery are maintained in the product master, for three demand types, corresponding to the demand priorities (set in the optimiser profile per demand type): 1: customer demand, 5: corrected forecast demand, and 6: forecast demand.

The SNP Costs The most critical issue in using the SNP optimiser is the appropriate maintenance of the costs. For example, if storage costs are too high, it may result in no production at all, because supply chain costs exceed the penalties for non-delivery or permanent transport

The SNP Constraints The constraints for the optimisation are the demand, the capacities, the material availability and the production and stock transfer horizons. Most of these constraints are controlled in the optimiser profile as listed in Table The user may define a priority for each demand type. The user may also set priority in the optimiser profile in the “hard prioritisation” checkbox.

Constraints for SNP Optimiser

The Discrete Optimiser Discretization is required in the following cases: 1.Lot-size dependence Such as decreasing costs due to less set-up or increasing costs if procurement contract is exceeded, 2.Technical restriction When it requires different master data, e.g. if the production process or the resource changes for huge lot sizes, 3.Fixed resource consumption Such as set-up, 4.Technical restrictions When it requires a fixed lot size, a lot size rounding, or a minimum lot size, and 5.Extension of the standard capacity.

Discretization for Optimiser The use of discretization parameters in each bucket complicates the planning problem, as it is a NP-hard problem in nature. Try to limit the use of discretization parameters and discrete buckets. The SNP optimiser makes use of a medium-term plan, to review each discretization step to see if it is really necessary.

Discretization for Optimiser Cost functions are created for procurement, production, and transport and are assigned to the product master (procurement), PDS /PPM (production) and means of transport view of the transportation lane (transport). Production costs can be modelled in two ways: 1.one is to assign a cost function to PPM, 2.the other one is to use two PPMs: one with higher cost, and the other one with lower cost but a minimum lot size. Depending on the modeling, the curve for the cost per quantity is different (see Figure 10.5).

Cost Function for varying Capacities

Cost Function for Varying quantities

Solution time of the Optimiser The SNP solution time depends on the number of locations, products and buckets. To reduce the solution time, the user may aggregate the time buckets – e.g. by decreasing the granularity within the time horizon. The main issue for SNP optimiser is 1.To maintain the relevant costs and 2.To integrate interactive planning steps into scenario (See an example in the SAP implementation).

Capable-to-Match (CTM) Capable-to-match (CTM) is an APO tool to perform DP/PP interactively To run CTM, the user needs to prioritize demand elements, categorize supply elements, and match demands with the supplies, according to a strategy to search existing stocks, planned receipts, and/or with production. CTM planning is a first-come, first-serve heuristic; as a result, shortages may occur to late comers. CTM approach usually applies when demand priorities (e.g. demand type, customer priorities, product priorities) exists

Capable-to-Match (CTM) CTM is a heuristic approach; it does not optimize. There is no re-planning for the created orders for other demands. The structure of CTM is shown on the Figure Like the SNP optimizer, the user needs to first set up the CTM planning engine.

Capable-to-Match (CTM) CTM Procedure: 1.Prioritize demands and orders, and categorize supplies (production and/or stocks), according to the planning mode and the search strategy; 2.Load the master data and the transaction data (demands and orders) into CTM engine; 3.Run CTM to match demands with supplies in a location- by-location procedure. All supply categories and the production are taken into account for each location, according to the search strategy.

CTM Profile All relevance settings for CTM planning are made within the CTM profile. CTM profile defines the planning parameters, and triggers CTM planning. Figure 10.9 outlines the CTM profile. For example, the CTM scope is defined by the master data selection. order selection CTM time stream (e.g., time bucket definition)

CTM Profile

CTM Categorization and Search Strategy Two way to generate the supply categorisation: 1.Assigning an ATP category (e.g. stock or production order) and/or category groups to each supply category, and 2.defining limits per location-product and assigning the limits to each supply category (see Figure 10.11). After the supply limits are defined, the supply categories are assigned to the supply limits in the categorisation profile. The main purpose of the supply categorisation is to keep the inventory level above a certain limit.

Supply Categorisation

CTM Categorisation and Search Strategy The search strategy defines the sequence in which the supplies are matched with demands. All the planning steps defined in the search strategy – the matching of supplies and the production – are carried out location-by-location. The sequence of the locations is determined by the priorities (see Figure 10.12), where the location SOURCE1 has a higher priority than SOURCE2, so first all the planning steps are performed for the location SOURCE1. Production is only able to cover one demand.

Supply and Demand Matching – Search Strategy

CTM Planning CTM takes into account, the transportation lane priority, the location priority, and the product priority; and uses them to make decisions as shown in Figure The transportation lane priority is used for sourcing decisions. The location and product priorities become significant when shortage occurs (in which the demand with the highest priority is considered first).

Priorities for CTM

Aggregation for CTM By activating the aggregation selection in CTM profile, all orders can be aggregated to match resources according to the CTM time stream. Figure illustrates the impact of the three aggregation options: no aggregation, demand aggregation at the start of CTM time steam, and demand aggregation at the end of CTM time steam.

Aggregation for CTM

Integration to ERP There is a parameter in CTM, to specify if we want to transport receipt objects individually or not. 1.If we want to transport individually, then each supply (e.g. stock, planned order) will be transferred immediately, 2.Otherwise, the transportation is based on the number of demands. (see Figure 10.19)

Transport Receipt Objects Individually

Planned Stock Transfers CTM considers the duration for goods issue, transport, and goods receipt to schedule stock transfer orders. Goods issue and goods receipt are maintained in the product master in days (unit of measurement used), and transport duration is maintained in the transportation lane in hours (unit of measurement used). Figure 11.3 shows the scheduling for stock transfer orders.

Scheduling of Stock Transfer Orders

Storage Resource

Integrated Distribution & Production Planning SAP Implementation Integrated Distribution & Production Planning SAP Implementation

Maintain Distribution Definitions in SCM System

Define Transfer of SNP Orders in SCM System

HW 5: Exercises (Due date 11/30/2013) 1. Create transportation lanes in SCM system 1) Create transportation lane from plant to DCs and assign materials 2) Mass generate transportation lanes with start locations for plant and DCs and destination locations for customers 3) Create transportation lane from MI## to SD## 2. Assign materials to transportation lanes 1) Assign materials for transportation lanes from plant to customers 2) Assign materials for transportation lanes from DCs to customers 3) Assign materials for transportation lane from MI## to SD## 3. Create quota arrangement in SCM system 1) Create inbound quota arrangement for vendor ) Create inbound quota arrangement for vendor Master Product settings 5. Model Consistency check