When all the pipes are in position the site is then brought up to tarmac level. The kerbs can then be put in place and all the manholes and gulleys can be fixed at the correct level
First broken stone is used. Note the clay at the side where topsoil will be put to form a flower bed.
Placing the stone in place
Marked ready for the kerbs
Kerbs laid with falls for drainage
Gulley and manhole set at the correct levels
Bases cast for the steps
Shuttering to enable a step and a ramp to be cast at the front door
Finally the front step is tiled
A land drain round the site
The drive ready for asphalt
Patios are laid
The gardens are roughly laid out ready for sowing in the spring
Fencing round the oil tank
The drive with the base course in place
The back steps will look better when the drive is asphalted