Regulatory Overview of LNG LSU Center for Energy Studies Energy Summit Baton Rouge, Louisiana October 20, 2005 Robert Cupina, Deputy Director, Office of.

Slides:



Advertisements
Similar presentations
Pat Wood III, Chairman Federal Energy Regulatory Commission New Englands Platform for Infrastructure Development Boston September 13, 2004.
Advertisements

FERC 1 APGA Annual Conference Halifax, Nova Scotia FERC Priorities in an Evolving Natural Gas Market Suedeen G. Kelly Commissioner, FERC August 2, 2005.
1 The Honorable Suedeen G. Kelly Commissioner, Federal Energy Regulatory Commission IPAA 2004 Mid-Year Meeting June 14, 2004 “A FERC Perspective on Natural.
All Things Natural Gas Infrastructure, Rates and Policy
Capitol Hill Ocean Week Managing Emerging Demands for LNG.
ACC Workshop Regarding Notice of Inquiry on Natural Gas Infrastructure September 10, 2003.
Environmental Regulation and Liquefied Natural Gas Commissioner Suedeen G. Kelly, FERC Duke Environmental Law & Policy Forum November 19, 2004.
Pat Wood, III, Chairman Federal Energy Regulatory Commission Energy Infrastructure Washington D.C. April 5, 2005.
What’s Up With Infrastructure? Interstate Pipeline Regulatory Committee Jeff Wright, Chief Energy Infrastructure Policy Group Office of Energy Projects.
Dena E. Wiggins February 16, 2015 National Association of Regulatory Utility Commissioners Winter Meeting CONNECTING THE DOTS: FROM THE WELLHEAD.
SEARUC 2003 Annual Meeting Pinehurst, North Carolina June 9, 2003 Pat Wood, III Federal Energy Regulatory Commission.
The FERC Review Process and Interaction with State Authorities Council of State Governments July 27, 2005 Office of Energy Projects Federal Energy Regulatory.
LNG PAT WOOD III Federal Energy Regulatory Commission December 17, 2003.
Federal Energy Regulatory Commission
Pivotal Development: Regions of Possibilities Dana Grams Senior Vice President, Pivotal Development.
Federal Energy Regulatory Commission Item No. C- 7 Weaver’s Cove Energy & Mill River Pipeline June 15, 2005.
Outlook on Natural Gas and LNG. Fuel Diversity in New England Recent build-out ~10,700 MW Gas-fired generation (% Total NE GWh) –1999: 16% –2003: 41%
NATURAL GAS ROUNDTABLE Commissioner Suedeen G. Kelly, FERC February 24, 2004 “Pending Natural Gas Issues”
Federal Energy Regulatory Commission GITA Seminar on: New Construction Project Lifecycle JW Marriott Houston, TX September 20, 2004 Lonnie Lister, Chief.
Natural Gas In California LNG Imports UCSB Bren School Corporate Partners Summit May 14, 2004.
Eric J. Tomasi – Project Manager Division of Gas – Environment & Engineering Office of Energy Projects Federal Energy Regulatory Commission Northeast Energy.
EVALUATION OF LIQUEFIED NATURAL GAS RECEIVING TERMINALS FOR SOUTHERN CALIFORNIA April Chan Jana Hartline Rob Hurley Leanna Struzziery Faculty Advisors:
1 Cheyenne Tuscola Lebanon Clarington Meeker Wamsutter Opal “Rockies Express Pipeline”
Liquid Natural Gas (LNG) Facilities. LNG: What is it? Natural gas converted to liquid at -260 F Natural gas converted to liquid at -260 F 1/600 of original.
FERC and the Development of an Alaska Natural Gas Pipeline Robert J. Cupina, Deputy Director Office of Energy Projects Federal Energy Regulatory Commission.
Robert Cupina, Principal Deputy Director Office of Energy Projects Federal Energy Regulatory Commission Hot Button Issues and Priorities SGA Fall Leadership.
Commissioner Suedeen Kelly Federal Energy Regulatory Commission Energy Infrastructure in the West February 24, 2006.
Natural Gas Transmission Networks: So You Want To Build A Pipeline?
SHORT - TERM NATURAL GAS OUTLOOK National Association of State Energy Officials State Heating Oil and Propane Conference August 7, 2006 Barbara Mariner-Volpe,
FERC Office of Energy Projects 1 Federal Energy Regulatory Commission EPAct 2005 Authorities & FY06 Status of LNG Facilities and Pipelines IRWA Federal.
The Market Outlook for Natural Gas: The Wyoming Natural Gas Pipeline Authority’s Perspective Wyoming Geological Association Conference Prepared: July 26,
Public Symposium on LNG Bowdoin College Brunswick, Maine Robert J. Cupina, Deputy Director Office of Energy Projects Federal Energy Regulatory Commission.
FERC Organization Chart
Imported Liquified Natural Gas and its Role in Energy Independence Samuel Brown.
Natural Gas Transmission Regulation in the US Jeff Wright, Chief Energy Infrastructure Policy Group Office of Energy Projects Federal Energy Regulatory.
A wholly owned subsidiary of Cheniere Energy, Inc. American Stock Exchange: LNG Cheniere LNG Energy Summit 2004 “Securing Louisiana’s Economic Growth in.
Regulation and Investment in the U.S. Robert J. Cupina, Deputy Director Office of Energy Projects Federal Energy Regulatory Commission GIE Annual Conference.
HYDROPOWER: A Comparative Energy Review J. Mark Robinson JMR Energy Infra, LLC NWHA February 23, 2011.
Intermountain West Production -- Getting Gas to Market Jim Cleary El Paso Western Pipelines IPAA Mid-Year Meeting June 14, 2004.
ALASKA NATURAL GAS SYMPOSIUM Regulatory Update J. Mark Robinson, Director Office of Energy Projects Federal Energy Regulatory Commission December 2, 2004.
LNG in North America Tommy Stone – Vice President, Operations & Engineering Trunkline LNG Company, LLC – Lake Charles, LA Tommy Stone – Vice President,
FERC Office of Energy Projects 1 Global LNG Outlook 2004 Regulatory Status & Challenges in the U.S. Richard R. Hoffmann, Director Division of Gas – Environment.
The FERC Review Process and The Importance of Safe Pipeline and LNG Terminal Operation NASFM Annual Meeting- July 8, 2005 Office of Energy Projects Federal.
LNG Regulatory Update 2 nd Annual Global LNG Outlook October 27, 2005 Houston, Texas Jeff C. Wright, Chief Energy Infrastructure Policy Group Office of.
Michael Dirrane Director, Northeast Marketing NASUCA 2012 Annual Meeting November 13, 2012.
LNG: Regulatory and Regional Considerations The Energy Council’s LNG/CNG Workshop Biloxi, Mississippi April 8, 2005 Robert Cupina, Deputy Director, Office.
Frank J. Macchiarola Executive Vice President May 6, 2015 Conference of Western Attorneys General The LNG Export Opportunity.
TEXAS TEXAS Current Status of Liquid Natural Gas Terminals & Offshore Wind Farms Jerry Patterson Commissioner Capitol Hill Ocean Week 2006 – State and.
LNG USA Houston, Texas J. Mark Robinson, Director Office of Energy Projects Federal Energy Regulatory Commission September 23, 2004.
1 Federal Energy Regulatory Commission John M. Wood, Acting Director Division of Pipeline Certificates Office of Energy Projects FERC Update Florida Energy.
1 Energy Crisis and Solutions for California Oilfield Producers Gas Supply and Demand and Future Outlook Presented by William J. Keese, Chairman California.
Federal Energy Regulatory Commission The Pre-Filing Process IRWA/AI January 13-14, 2009 IRWA/AI.
Major Changes in Natural Gas Transportation Capacity, 1998 – 2008 Next  The following presentation was prepared to illustrate graphically the areas of.
Entrega Project Update Wyoming Natural Gas Pipeline Authority – August 30, 2005 Entrega Gas Pipeline Inc.
The Northeast Natural Gas Market in 2030 LNG EXPRESS CONFERENCE Boston, Massachusetts September 21, 2006 William Trapmann Natural Gas Analysis Team Leader.
The Market Outlook for Natural Gas: The Wyoming Natural Gas Pipeline Authority’s Perspective.
Managing Our Future: A Case for LNG NARUC Summer Committee Meetings Keith Meyer President, Cheniere Marketing July 2007 CHENIERE ENERGY, INC.
Bryan Hassler, Executive Director Society of Petroleum Engineers January 21, 2004 Rock Springs, WY.
Office of Energy Projects 1 FERC Update Robert J. Cupina Deputy Director Office of Energy Projects Federal Energy Regulatory Commission Wyoming Infrastructure.
California Energy Commission LNG’s Role for Expanding Natural Gas Supplies and Update on West Coast Projects Presented to West Coast PTTC Workshop Valencia,
FERC Office of Energy Projects 1 Richard Hoffmann, Director Division of Gas – Environment & Engineering Office of Energy Projects Policies Affecting.
Landon Derentz Energy Policy Advisor Bureau of Energy Resources U.S. Department of State Shale Gas and Tight Oil Production in the United States 1.
Continuing Progress of LNG Terminals in the Gulf Coast Region
California Energy Commission 1 LNG Permitting and Environmental Review: the View from California DOE LNG Forum Los Angeles June 1, 2006 Kevin Kennedy,
ACC Workshop Regarding Notice of Inquiry on Natural Gas Infrastructure February 13, 2004.
LNG Terminal Permitting J. Mark Robinson, Director Office of Energy Projects Federal Energy Regulatory Commission before the California Senate Energy,
Understanding the Impacts of Incremental Gas Supply on the Flow Dynamics Across the North American Grid Canadian Institute Vancouver, BC November 20, 2006.
Exploring Pipeline Dynamics to Connect New Markets
Swan City Rotary Club October 19, 2016
Natural Gas World Presentation T
Presentation transcript:

Regulatory Overview of LNG LSU Center for Energy Studies Energy Summit Baton Rouge, Louisiana October 20, 2005 Robert Cupina, Deputy Director, Office of Energy Projects

FERC Office of Energy Projects 2 FERC Helping Markets Work Adequate Infrastructure OEP Effective Market Rules OMTR Market Oversight OMOI Competitive Market FERC

Office of Energy Projects 3 FERC Organizational Structure

FERC Office of Energy Projects 4 Major Interstate and Canadian Pipelines and Gas Production Areas

FERC Office of Energy Projects 5 Natural Gas Act NATURAL GAS ACT Section 3 Import/Export Case Specific Case Specific Blanket Authority Automatic Prior Notice Section 7(c) Interstate

FERC Office of Energy Projects 6 Conduct a full review of proposal including engineering, rate, accounting, and market analysis Conduct an environmental review by preparing an Environmental Assessment or an Environmental Impact Statement Natural Gas Act Case Specific Section 7(c) and 3

FERC Office of Energy Projects 7 Northwest (113) ANR (107,143) Ocean Express (842) 2 Cheyenne Plains (560,170) 1 Calypso (832) Discovery (150) Transwestern (375) Trunkline(1,500) Cheniere Sabine (2,600) Trunkline (200) 7 Petal (600) Major Pipeline Projects Certificated (MMcf/d) January 2004 to October BCF/D Total 1,444 Miles Cheniere Corpus Christi (2,600) Algonquin (140) Transcontinental (105) CenterPoint(113) CIG (105) Vista Del Sol (1,100) Golden Pass (2,000) El Paso (502) Mill River (800) San Patricio (1,000) TransColorado (125, 300) 2. CIG (118) 3. Rendezvous (300) 4. WIC (116) 5. WIC (350) 6. Entrega (EnCana) (1,500) 7. Questar (102) Northern Border (Chicago III) (130)

FERC Office of Energy Projects 8 McMoRan (1,500) Compass Pass (1,000) Algonquin (800) Pearl Crossing (2,000) Golden Pass (2,000) Logan Lateral (Texas Eastern) (900) Seafarer Pipeline (El Paso) (800) Dominion Southern (200) Major Pipeline Projects Pending (MMcf/d) October BCF/D Total 879 Miles Dominion (700) Cameron (1,500) Columbia (172) Cheniere Creole Trail (3,300) ANR (168) Midwestern (120) Point Comfort (1,000) Cypress Pipeline (Southern Natural) (500) NE ConneXion (Tennessee) (800) Jewell Ridge (East Tennessee) (235) Triple-T Extension (Tennessee) (200) Florida Gas (160)

FERC Office of Energy Projects 9 Major Pipeline Projects On The Horizon (MMcf/d) October BCF/D Total 6,754 Miles Maritimes Phase IV (1,563) Northwinds Pipeline (NFG) (500) Dracut Interconnect (Tennessee) (250) Potomac Expansion (Transco)(150) Coronado (500) Painter Lateral (Overthrust) (200) Phoenix Lateral (Transwestern) (500) Questar Expansion (160 & 100) Northern Lights (No. Natural) (500) Kinder Morgan/Sempra (2,000) Vector Expansion (500) Trunkline (400) Continental Connector (El Paso Corp.)(1,000) Louisiana Pipeline (KMInterstate)(3,400) Carthage Pipeline(KM Interstate)(700) CenterPoint (500) Natural (232) Alaska (4,000)

FERC Office of Energy Projects 10 Caledonia (11.7) Falcon MoBay (20.0) County Line (6.0) Copper Eagle (3.2) EnCana (8.0) Bluewater (27.0) Saltville (5.8) Columbia (12.4) Pine Prairie (24.0) Natural (10.0) Dominion (9.4) Texas Gas (8.2) Freebird (6.1) CenterPoint (15.0) Starks (19.2) Falcon Hill-Lake (10.4) Liberty (17.0) Petal (5.0) Port Barre (10.5) SemGas (5.5) Certificated Since 1/1/04 On The Horizon Currently Pending Storage Projects (Capacity in Bcf) Falcon Worsham-Steed (12.0) Unocal Windy Hill (6.0) Columbia (16.4) Natural (10.0)

FERC Office of Energy Projects 11 Balancing Interests

Environmental ReviewOther Review Notice of Intent Data Requests Analysis Agency Coordination Scoping Meetings & Site Visit Data Requests Analysis Interventions Protests Notice of Application Preliminary Determination (Optional) Authorization / Rejection Tech Conference (Optional) Cryogenic Design & Safety Review DEIS FEIS FERC Review Process (Traditional Process) LNG

FERC Office of Energy Projects 13 Traditional vs. Pre-Filing Process Announce Open Season Announce Open Season Develop Study Corridor Develop Study Corridor Conduct Scoping Conduct Scoping Review Draft Resource Reports & Prepare DEIS Issue Draft EIS Issue Draft EIS File At FERC Issue Order Issue Order File At FERC Prepare Resource Reports Prepare Resource Reports Issue Final EIS Issue Final EIS (months) Traditional - Applicant Traditional - FERC Pre-Filing - Applicant Pre-Filing - FERC

FERC Office of Energy Projects 14 NPC Study Align the conflicting policies –- Policies that encourage consumption –- Policies that inhibit gas supply

FERC Office of Energy Projects 15 LNG – Two Points Natural gas is the economic/environmental fuel of choice. 96% of natural gas reserves are outside North America.

FERC Office of Energy Projects 16 How Much Natural Gas Is Out There? Source: EIA, World Oil Total World Gas Reserves as of 1/1/03: 6,127 Trillion Cubic Feet

FERC Office of Energy Projects 17 Where Are the Export Facilities? Office of Energy Projects 17 LNG supply growing Multiple LNG supply proposals announced Long term LNG supply outlook robust Global LNG Supply WORLD PROVED RESERVES 2003: 6,127 TCF NORTH AMERICA RESERVES 4% Source: Cedigaz, NPC Existing Under Construction Proposed Global LNG Supply Facilities

FERC Office of Energy Projects 18 Natural Gas Pipelines Storage and Vaporization Facility Liquefaction and Storage Facility Natural Gas Production Dock LNG Supply Stream -- From Production to Distribution

Economic Oversight – Access to LNG Terminal A Open Access At Delivery of Liquid to Terminal LNG Suppliers LNG Buyers A B B Open Access At Delivery of Vapor into Interstate Pipeline System Liquid to Vapor Flow FERC Office of Energy Projects 19

FERC Office of Energy Projects Existing and Proposed North American LNG Terminals As of October 7, 2005 FERC A B US Jurisdiction FERC US Coast Guard * US pipeline approved; LNG terminal pending in Bahamas C 2 D ,31 9 6, E CONSTRUCTED A. Everett, MA : Bcfd (Tractebel - DOMAC) B. Cove Point, MD : 1.0 Bcfd (Dominion - Cove Point LNG) C. Elba Island, GA : 0.68 Bcfd (El Paso - Southern LNG) D. Lake Charles, LA : 1.0 Bcfd (Southern Union - Trunkline LNG) E. Gulf of Mexico: 0.5 Bcfd, (Gulf Gateway Energy Bridge - Excelerate Energy) APPROVED BY FERC 1. Lake Charles, LA: 1.1 Bcfd (Southern Union - Trunkline LNG) 2. Hackberry, LA : 1.5 Bcfd, (Sempra Energy) 3. Bahamas : 0.84 Bcfd, (AES Ocean Express)* 4. Bahamas : 0.83 Bcfd, (Calypso Tractebel)* 5. Freeport, TX : 1.5 Bcfd, (Cheniere/Freeport LNG Dev.) 6. Sabine, LA : 2.6 Bcfd (Cheniere LNG) 7. Elba Island, GA: 0.54 Bcfd (El Paso - Southern LNG) 8. Corpus Christi, TX: 2.6 Bcfd, (Cheniere LNG) 9. Corpus Christi, TX : 1.0 Bcfd (Vista Del Sol - ExxonMobil) 10. Fall River, MA : 0.8 Bcfd, (Weaver's Cove Energy/Hess LNG) 11. Sabine, TX : 1.0 Bcfd (Golden Pass - ExxonMobil) 12. Corpus Christi, TX: 1.0 Bcfd (Ingleside Energy - Occidental Energy Ventures) APPROVED BY MARAD/COAST GUARD 13. Port Pelican: 1.6 Bcfd, (Chevron Texaco) 14. Louisiana Offshore : 1.0 Bcfd (Gulf Landing - Shell) CANADIAN APPROVED TERMINALS 15. St. John, NB : 1.0 Bcfd, (Canaport - Irving Oil) 16. Point Tupper, NS 1.0 Bcf/d (Bear Head LNG - Anadarko) MEXICAN APPROVED TERMINALS 17. Altamira, Tamulipas : 0.7 Bcfd, (Shell/Total/Mitsui) 18. Baja California, MX : 1.0 Bcfd, (Sempra) 19. Baja California - Offshore : 1.4 Bcfd, (Chevron Texaco) PROPOSED TO FERC 20. Long Beach, CA : 0.7 Bcfd, (Mitsubishi/ConocoPhillips - Sound Energy Solutions) 21. Logan Township, NJ : 1.2 Bcfd (Crown Landing LNG - BP) 22. Bahamas : 0.5 Bcfd, (Seafarer - El Paso/FPL ) 23. Port Arthur, TX: 1.5 Bcfd (Sempra) 24. Cove Point, MD : 0.8 Bcfd (Dominion) 25. LI Sound, NY: 1.0 Bcfd (Broadwater Energy - TransCanada/Shell) 26. Pascagoula, MS: 1.0 Bcfd (Gulf LNG Energy LLC) 27. Bradwood, OR: 1.0 Bcfd (Northern Star LNG - Northern Star Natural Gas LLC) 28. Pascagoula, MS: 1.3 Bcfd (Casotte Landing - ChevronTexaco) 29. Cameron, LA: 3.3 Bcfd (Creole Trail LNG - Cheniere LNG) 30. Port Lavaca, TX: 1.0 Bcfd (Calhoun LNG - Gulf Coast LNG Partners) 31. Freeport, TX: 2.5 Bcfd (Cheniere/Freeport LNG Dev. - Expansion) 32. Sabine, LA: 1.4 Bcfd (Cheniere LNG - Expansion) PROPOSED TO MARAD/COAST GUARD 33. California Offshore: 1.5 Bcfd (Cabrillo Port - BHP Billiton) 34. So. California Offshore : 0.5 Bcfd, (Crystal Energy) 35. Louisiana Offshore : 1.0 Bcfd (Main Pass McMoRan Exp.) 36. Gulf of Mexico: 1.0 Bcfd (Compass Port - ConocoPhillips) 37. Gulf of Mexico: 2.8 Bcfd (Pearl Crossing - ExxonMobil) 38. Gulf of Mexico: 1.5 Bcfd (Beacon Port Clean Energy Terminal - ConocoPhillips) 39. Offshore Boston, MA: 0.4 Bcfd (Neptune LNG - Tractebel) 40. Offshore Boston, MA: 0.8 Bcfd (Northeast Gateway - Excelerate Energy)

FERC Office of Energy Projects 21 POTENTIAL U.S. SITES IDENTIFIED BY PROJECT SPONSORS 41. Coos Bay, OR: 0.13 Bcfd, (Energy Projects Development) 42. California - Offshore: 0.75 Bcfd, (Chevron Texaco) 43. Pleasant Point, ME : 0.5 Bcfd (Quoddy Bay, LLC) 44. St. Helens, OR: 0.7 Bcfd (Port Westward LNG LLC) 45. Galveston, TX: 1.2 Bcfd (Pelican Island - BP) 46. Philadelphia, PA: 0.6 Bcfd (Freedom Energy Center - PGW) 47. Astoria, OR: 1.0 Bcfd (Skipanon LNG - Calpine) 48. Robbinston, ME: 0.5 Bcfd (Downeast LNG - Kestrel Energy/Dean Girdis) 49. Boston, MA: 0.8 Bcfd (AES Battery Rock LLC - AES Corp.) 50. Calais, ME: ? Bcfd (BP Consulting LLC) POTENTIAL CANADIAN SITES IDENTIFIED BY PROJECT SPONSORS 51. Quebec City, QC : 0.5 Bcfd (Project Rabaska - Enbridge/Gaz Met/Gaz de France) 52. Rivière-du- Loup, QC: 0.5 Bcfd (Cacouna Energy - TransCanada/PetroCanada) 53. Kitimat, BC: 0.61 Bcfd (Galveston LNG) 54. Prince Rupert, BC: 0.30 Bcfd (WestPac Terminals) 55. Goldboro, NS 1.0 Bcfd (Keltic Petrochemicals) POTENTIAL MEXICAN SITES IDENTIFIED BY PROJECT SPONSORS 56. Lázaro Cárdenas, MX : 0.5 Bcfd (Tractebel/Repsol) 57. Puerto Libertad, MX: 1.3 Bcfd (Sonora Pacific LNG) 58. Offshore Gulf, MX: 1.0 Bcfd (Dorado - Tidelands) 59. Manzanillo, MX: 0.5 Bcfd 60. Topolobampo, MX: 0.5 Bcfd Potential North American LNG Terminals As of October 7, 2005 FERC US Jurisdiction FERC US Coast Guard

Office of Energy Projects 22 Calais, ME (50) Everett, MA (A) Offshore Boston – Neptune (39) Fall River, MA (10) Legend: Existing Terminal Approved Terminal Proposed Terminal: Pre-Filing Proposed Terminal: Filed Working on DEIS Working on FEIS Potential Terminal North East LNG Terminals October 7,2005 Offshore Boston – Excelerate (40) Providence, RI Rejected Robbinston, ME (48) Boston, MA – Battery Rock (49) Pleasant Point, ME (43)

Office of Energy Projects 23 Legend: Existing Terminal Approved Terminal Proposed Terminal: Pre-Filing Proposed Terminal: Filed Working on DEIS Working on FEIS Potential Terminal Cove Point, MD (B/24) Logan Township, NJ (21) Mid-Atlantic LNG Terminals Long Island Sound, NY (25) Philadelphia, PA (46) October 7,2005

Office of Energy Projects 24 South East LNG Terminals Elba Island, GA (C/7) Bahamas (3/4/22) Legend: Existing Terminal Approved Terminal Proposed Terminal: Pre-Filing Proposed Terminal: Filed Working on DEIS Working on FEIS Potential Terminal (Pipelines only) October 7,2005

Office of Energy Projects 25 Corpus Christi, TX (8) Lake Charles, LA (D/1) Port Pelican (13) Pearl Crossing (37) Freeport, TX (5/31) Golden Pass (11) Port Lavaca, TX (30) Port Arthur (23) Sabine Pass, LA (6/32) Gulf Coast LNG Terminals Freeport McMoran (35) Hackberry (2) Gulf Landing (14) Compass Port (36) Legend: Existing Terminal Approved Terminal Proposed Terminal: Pre-Filing Proposed Terminal: Filed Working on DEIS/EA Working on FEIS Potential Terminal Galveston, TX (45) Pascagoula, MS (26/28) Cameron (29) Beacon Port (38) Gulf Gateway (E) Vista Del Sol (9) Ingleside LNG (12) October 7,2005 EA

Office of Energy Projects 26 Long Beach, CA (20) California Offshore (33/34/42) Southwest LNG Terminals Chevron Texaco (42) BHP Billiton (33) Crystal Energy (34) Legend: Existing Terminal Approved Terminal Proposed Terminal: Pre-Filing Proposed Terminal: Filed Working on DEIS Working on FEIS Potential Terminal October 7,2005

FERC Office of Energy Projects 27 Office of Energy Projects 27 North West LNG Terminals Coos Bay, OR (41) Bradwood, OR (27) Legend: Existing Terminal Approved Terminal Proposed Terminal: Pre-Filing Proposed Terminal: Filed Working on DEIS Working on FEIS Potential Terminal Astoria, OR (47) St. Helens, OR (44) October 7,2005

FERC Office of Energy Projects 28 LNG Properties and Safety LNG is natural gas that in its liquid state at -259º Fahrenheit - it is commonly stored and shipped at slightly above atmospheric pressure. LNG is odorless, colorless, non-toxic - it neither explodes nor burns as a liquid. LNG vapors are flammable only in concentrations of 5% to 15% with air and will not explode in an unconfined environment - the ignition temperature is more than 500º Fahrenheit higher than gasoline. In the past 40 years there have been more than 33,000 LNG ship voyages without a significant accident or cargo spillage.

FERC Office of Energy Projects 29 LNG Terminal Siting Issues Safety Take Away Capacity Local acceptance Federal and State approvals

FERC Office of Energy Projects 30 LNG Review Process Mandatory Pre Filing Start of Pre-Filing Process Scoping Meeting / Site Visit Data Requests, Analysis & Agency Coordination Notice of Application Interventions & Protests Issue DEIS Public Meeting / Comments Issue FEIS Authorization / Denial Safety & Engineering Cryogenic Design & Safety Review Technical Conference Waterway Suitability Assessment Review Waterway Suitability Report USCG Letter of Recommendation (issued independently)

FERC Office of Energy Projects 31 The FERC Process: We Issue Notice of the Application Project Sponsor Sends Landowner Notification Package SCOPING = We Issue Notice of Intent to Prepare the NEPA Document Public Meeting(s) Public Input: File an Intervention Contact the project sponsor w/questions, concerns; contact FERC Send letters expressing concerns about environmental impact Attend scoping meetings Opportunities for Public Involvement

FERC Office of Energy Projects 32 The FERC Process: Issue Notice of Availability of the DEIS Public Meetings on DEIS Issue a Commission Order Public Input: File comments on the adequacy of DEIS Attend public meetings to give comments on DEIS Interveners can file a request for Rehearing of a Commission Order Opportunities for Public Involvement

FERC Office of Energy Projects 33 Recent Events ABS Study Skikda Accident Reorganization for Safety Sandia Study Regional Planning Katrina/Rita

FERC Office of Energy Projects 34 Outlook/Issues Associated with LNG Development Attempts to reassert economic jurisdiction in the post-Hackberry environment. Disinformation about safety. Legislative/Judicial Action Rulemaking

FERC Office of Energy Projects 35 US Natural Gas Balance