Commissioning Presentation For Society of American Military Engineers (SAME) George Washington University Chapter February 25, 2011.

Slides:



Advertisements
Similar presentations
COMPANY MAINTENANCE MANUAL
Advertisements

THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
Course Material Overview of Process Safety Compliance with Standards
1.Quality-“a characteristic or attribute of something.” As an attribute of an item, quality refers to measurable characteristics— things we are able to.
PERFORMING EFFECTIVE BUILDING SYSTEM RECOMMISSIONING STUDIES Joseph J. Watson, P.E. Booth # 312.
Commissioning. What is Commissioning? And the word Authority?
SUBMITTALS PROCESSING Fall 2008 ARCH 330
1100 Superior Ave., Suite Wolf Ledges Parkway, Suite West Third Avenue Cleveland, OH 44114Akron, OH 44311Columbus, OH
Building Commissioning. What is building commissioning? Building commissioning is a systematic and documented process of ensuring that the owner’s operational.
More CMM Part Two : Details.
Commissioning: The Most Important Component of LEED ® by Rick Miller, PE, LEED AP RNM Engineering, Inc. San Luis Obispo, CA.
Sustainability and Commissioning for Military Facilities WHAT IT IS AND WHAT IT IS NOT! Dan Jackson, PE, Vice President Tim Whitley, PE, CxA, CCP, LEED.
Building Enclosure Commissioning (BECx): Practical Project Implementation.
ASHRAE Guideline The Commissioning Process Building Commissioning Association Northeast Chapter Thomas Anderson, CCP.
Building Commissioning
THE PROJECT TEAM TYPICAL REQUIREMENTS AND RESPONSIBILITIES OF THE PROJECT TEAM TRADITIONAL TEAM ORGANIZATION AND VARIATIONS THE OWNER’S TEAM THE DESIGN.
Quality Assurance/Quality Control Policy
Copyright 2008, International Code Council 2012 IECC ® for SERBCA Based on the 2012 International Energy Conservation Code.
Bodil Mose Pedersen, DHI Status for implementering af ”Quality Manual”
1 BROOKHAVEN SCIENCE ASSOCIATES As-Built Drawings and Commissioning Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional.
PMI Bluegrass May 2012 Lunch Presentation: Commissioning Building Systems Commissioning for Project Managers.
Brought to you by: Connecticut Energy Code Frederick F. Wajcs Senior Energy Engineer Northeast Utilities February 10, 2011.
The Future of Commissioning for Sustained Building Performance Birmingham, AL SERBCA Fall Conference Proposed LEED Requirements for Commissioning.
Building Commissioning: It’s a Process For a Reason Presented by Rick Scivally CHFM, CHSP, CBCP, LEED AP.
The 5 th Annual Conference on Total Building Commissioning 2009 Commissioning Changes in LEED 2009 Paul McCown, PE, CxA, LEED AP, CEM SSRCx, LLC.
Southeast Region Chapter 2004 Summer Training Meeting Louisville, KentuckyThursday, August 19, 2004 COMMISSIONING ??? COMMISSIONING 101.
August 10, 2007 CONTROL YOUR DATA CENTER! Tune your Legacy Data Center to improve overall efficiencies.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
Specifying Commissioning Derek De Jesús, CxA Commissioning Manager Chinook Systems, Inc. Understanding the Commissioning Process October 14, 2008.
National Sustainable Building Advisor Program Unit 8B Building commissioning Christopher Kerr, CxA Glumac June 4, 2010.
Commissioning for Sustained Building Performance Building Performance Birmingham, AL Marriott 9/29/11 Introduction to Commissioning and Retro-Commissioning.
Dan Frasier, PE, CCP Successful Turnover of New and Renovation Construction Projects Successful Turnover of New and Renovation Construction.
King County Wastewater Treatment Division What you need to know about WTD’s Technical Standards.
2 of 45 WELCOME TO BUILDING COMMISSIONING 101 Building Commissioning Association.
SENG521 (Fall SENG 521 Software Reliability & Testing Software Product & process Improvement using ISO (Part 3d) Department.
PACE Technical Standards Eddy Trevino, P.E., Program Manager State Energy Conservation Office August 2015.
April, 2002Energy Audits1 April, 2002 Ryan Stroupe, Pacific Energy Center DeAnza College: ES 76 Energy Reliability and Your Organization Energy Auditing.
Commissioning of New and Existing Buildings Alexander P. Boucher, P.E., CEM, LEED BD+C.
High Performance Buildings 2007 Differences in Commissioning Scope ACG, ASHRAE Guideline 0, GSA and LEED Steven (Rusty) Ross PE, CxA, LEED AP SSRCx, LLC.
SPS policy – Information Presentation Presentation to ROS June 16, 2004.
Building Commissioning: Cx 101 Brock Graham, Gilbane Building Co. Michael Gannon, BVH Integrated Services November 15, 2010.
Formats ACT 380.
Chapter 23 Lighting Design Process: Final Phases © 2006 Fairchild Publications, Inc.
Birmingham, AL SERBCA Fall Conference Presented by: Gary Sweatt, CxA, QCxP.
Circuit Rider Training Program (CRTP) Circuit Rider Professional Association Annual General Meeting and Conference August 30, 2012.
Wilsdorf Hall Materials Science Engineering & Nanotechnology Building University of Virginia Leaha Martynuska Construction Management Option Senior Thesis.
Code Officials and the Code Process.  To design the interior of the building in conjunction with codes, standards and federal regulations required in.
Scoping a Commissioning Job in Terms of Contractor Involvement ???
QUALITY MANAGEMENT STATEMENT
Contracting for Commissioning Services A Priority for Facility Owner’s and Program Managers Matt Ferreira, CxA, LEED AP October 14, 2008.
New Development and Significant Development 12/21/20151 New Development & Significant Redevelopment.
Design Intent Phase Design Intent Phase Determine what the design intent is and how the building is to operate when it is complete. Determine what the.
Specifying Commissioning Derek De Jesús, CxA Commissioning Manager Chinook Systems, Inc. Understanding the Commissioning Process October 14, 2008 ©2008.
1 A Seminar On Pharmaceutical Outsourcing A Seminar On Pharmaceutical Outsourcing.
Teknologi Pusat Data 12 Data Center Site Infrastructure Tier Standard: Topology Ida Nurhaida, ST., MT. FASILKOM Teknik Informatika.
Code Officials and the Code Process.  Concentrates on the code process as a whole.  Different type of code officials  Various steps that are taken.
McDonough Bolyard Peck Educational Series Building Commissioning Presented by: Doug Wrenn Steve Baxter July
McDonough Bolyard Peck Educational Series HVAC Commissioning Presented by: Doug Wren Steve Baxter September 30, 2003.
Commissioning HVAC Systems: Lessons learned throughout
Managing Quality with Quality Through the Construction Management Leadership Manual Presented by: Aleksandr Sergek, PE, PMP Allison Justiniano, LEED AP.
the Basic Commissioning (Cx) Process
Glendale Community College Why LEED? Why Commissioning? Blair Seibert, AIA, LEED AP, CSBA VERDE CONCEPTS Los Angeles.
Constructing Recreation Facilities 8 chapter. Groundbreaking Before the construction begins, a groundbreaking ceremony is often held in recognition of.
Process Safety Management Soft Skills Programme Nexus Alliance Ltd.
Steve Griffith February 28th, 2017
Introduction to LEED Building Commissioning
Commissioning at NYP Joseph Lorino, PE, LEED Vice President
Air Carrier Continuing Analysis and Surveillance System (CASS)
CxA at Georgia Tech TRAINING OUTLINE Overview of CxA
PSS verification and validation
Presentation transcript:

Commissioning Presentation For Society of American Military Engineers (SAME) George Washington University Chapter February 25, 2011

Anthony Pellegrino, PE My name is Anthony Pellegrino. I am a licensed Professional Engineer with 17 years of experience in the Design and Construction Industry. I am a Senior Mechanical Engineer at URS and function as a specialist at both Commissioning and Control System Design. I have been responsible for the development of commissioning specifications and test plans; third party reviews of mechanical, plumbing and electrical design; and management of commissioning projects as a Commissioning Agent. I have also been responsible for witnessing and documenting mechanical, plumbing and electrical building commissioning activities as well as post-construction troubleshooting

Agenda Introduction to Commissioning Building Systems which are Commissioned Description of the Commissioning Process Documentation used in the Commissioning Process Conclusion

What is Commissioning? The Process is based on the ASHRAE Guidelines 0-2005 and 1-1996 A Quality Based Method adopted by the Owner to achieve a successful construction project. As Defined by ASHRAE “Commissioning is a systematic process of ensuring that all building systems perform interactively according to the design intent and the owner’s operational needs.”

What is the Purpose of Commissioning? Serves as a means to provide documented confirmation that the facility fulfills the requirements of the owner. To verify and document compliance with design criteria throughout construction, start-up, and the initial period of operation. To confirm that operating staff are trained and have the necessary documentation to maintain the facility. It includes and coordinates the separate functions of system documentation, equipment startup, control system calibration, testing and balancing and performance testing.

When is Commissioning NOT Optional? Code requirements for all new buildings over 50,000 SF (ASHRAE 90.1) require HVAC systems be commissioned. US Green Building Council requires Fundamental Commissioning as a pre-requisite for LEED Certification. Additional points can be earned with Enhanced Commissioning.

Who Should be Doing Commissioning? Ideally, Commissioning should be performed by an Independent Company that has no affiliation with: Manufacturers of equipment or system components Installing Contractors Designers Any other person or company which could affect the ability of the Commissioning Agent to render an Independent Commissioning Report

What is a Commissioning Agent? The Commissioning company will assign a Commissioning Agent (CxA) to the project. The primary role of the CxA is to develop, coordinate and execute testing plans, document performance and confirm proper system functionality. The CxA leads, plans, schedules and coordinates the Commissioning Team.

What is a Commissioning Team? The Commissioning Team consists of representatives from the various parties involved in the construction effort. They are responsible for implementing the commissioning process.

What Gets Commissioned???

Heating Ventilation & Air Conditioning (HVAC) Systems Air Handling Units Roof Top Units Fan Coil Units VAV Boxes Chillers Boilers Pumps Exhaust Fans

Potable Hot Water Domestic Hot Water Sanitary Water Storm Water Plumbing Potable Hot Water Domestic Hot Water Sanitary Water Storm Water Water Softener Toilets Sinks Urinals Showers

Power Distribution Units Motor Control Centers Engine Generators Electrical Transformers Switchgears Power Distribution Units Motor Control Centers Engine Generators Breaker Panels Automatic Transfer Switches

Wet Pipe Sprinkler System Dry Pipes Sprinkler System Fire Protection Fire Pumps Wet Pipe Sprinkler System Dry Pipes Sprinkler System Pre-Action Sprinkler System Kitchen Hood Fire Suppression System

Information Technology Systems Telephone Systems Intranet Telecommunications Information Technology Systems Telephone Systems Intranet

Security Card Access Systems CCTV Systems Alarm Systems

Building Pressurization Exterior Walls Roof Building Envelope Doors Windows Building Pressurization Exterior Walls Roof

Laboratory Exhaust System Specialty Equipment Laboratory Fume Hood Laboratory Exhaust System

Fire Alarm System Fire Alarm Control Panel

Building Automation System Control Panel Controls Building Automation System Control Panel

The Commissioning Process The Commissioning Process is a Quality-Focused Process for enhancing the delivery of a project. The process focuses upon verifying and documenting that the facility is planned, designed, installed and tested to meet the design intent.

Four Phases of Commissioning The Commissioning Process can be broken down into four phases: Design Phase Activities Construction Phase Activities Acceptance Phase Activities Post Acceptance Phase Activities

Design Phase During the Design Phase, the CxA: Reviews the Owner’s Project Requirements. Reviews the Design Documents. Develops Commissioning Specifications. Develops a Preliminary Commissioning Plan. Conducts a Kickoff Meeting.

Construction Phase During the Construction Phase, the CxA: Develops the final Commissioning Plan. Holds regular Commissioning Meetings. Incorporates Commissioning milestones into the project schedule. Reviews modifications to the Contract Documents. Reviews approved submittals for equipment being Commissioned. Develops the Construction Verification Checklists (CVC).

Construction Phase (Continued) During the Construction Phase, the CxA: Randomly visits the site to verify installation of equipment. Creates and Maintains a Commissioning Issue Log. Reviews CVCs startup checklists completed by Contractor. Develops Functional Performance Tests (FPT). Reviews Operation & Maintenance Manual Documentation. Verifies adequate training is provided by the Contractor.

Acceptance Phase During the Acceptance Phase, the CxA: Witnesses initial Testing, Adjusting and Balancing (TAB) of building systems. Directs and Witnesses FPTs performed by the Contractor. Documents the results of FPTs and notes all deficiencies found. Directs and Witnesses re-testing of items that failed initial testing. Maintains and Updates the Commissioning Issue Log. Works with the Contractor to resolve outstanding issues.

Post Acceptance Phase During the Post Acceptance Phase, the CxA: Directs and witnesses off-season testing. Maintains and updates the Commissioning Issue Log. Works with the contractor to resolve outstanding issues. Conducts a final interview with the Owner. Writes the Final Commissioning Report.

Documents Used in the Commissioning Process Design Intent Document Construction Documents Contract Documents Commissioning Plan Field Reports Construction Verification Checklists (CVC) Functional Performance Tests (FPT) Commissioning Issue Log Operation & Maintenance Manuals Final Commissioning Report

Design Intent Document Details the functional requirements of a project and how it will be used. It includes project goals, performance criteria, cost considerations, benchmarks and success criteria. It is translated into the construction documents. It is the ultimate measure of the project’s technical success.

Construction Documents: These include a range of documents that vary with the Owner’s needs, regulations and laws. Includes specifications, drawings and general terms and conditions of the contract. Contract Documents: These include price agreements, construction management process, subcontractor agreements and/or requirements, requirements and procedures for submittals, changes, other construction requirements, timeline for completion, and the Construction Documents.

Commissioning Plan: A written plan of how the commissioning process will be accomplished. Field Reports: A document generated after each CxA site visit to record commissioning related event. Commissioning Issue Log: A formal vehicle to track commissioning issues, their status and resolution.

Example of a Commissioning Plan

Example of a Field Report

Example of a Commissioning Issue Log

Construction Verification Checklists (CVC) Activities that must be performed for the proper storage, handling and installation of building components. CVC’s must be completed by the Contractor prior to Functional Performance Testing.

Example of a Construction Verification Checklist (CVC)

Functional Performance Testing (FPT) A procedure designed to verify the functional performance of equipment or systems under a full range of operating conditions and loads, as specified by the contract documents. Each test is a written protocol that defines methods, personnel, and expectations for tests conducted on components, equipment, assemblies, systems, and interfaces among systems. The Contractor performs the FPT’s and provides necessary test equipment to complete the tests. The CxA directs, witnesses, and documents the FPT’s.

Example of Functional Performance Tests (FPT)

Example of Functional Performance Tests (FPT) (Cont.)

Example of Functional Performance Tests (FPT) (Cont.)

Operation & Maintenance Manuals Provided by Contractor at the completion of the project. Describes the as-built conditions. Describes how systems operate. Includes information on products concerning repair and replacement.

Final Commissioning Report Documents the Activities which occurred during the Building Commissioning Process. Provides the Final Results of the overall Building Commissioning Effort.

Example of a Final Commissioning Report

And FINALLY….

What are the Benefits of Commissioning? A fully Functional System that minimizes the number of occupant complaints. A fine-tuned system improves the economy of operation. Knowledge and Resources are available to maintain systems as they were originally intended. Reduces the number of problems upon initial occupancy. Improves the reliability of building systems. Saves money through more efficient operation of building systems.

QUESTIONS? Q&A TIME

THANK YOU!