1 BAM status report S.Buontempo on behalf of BAM Committee BAM Committee Firm Pre-selection Tender Documentation BAM site preparation Project strategy.

Slides:



Advertisements
Similar presentations
THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
Advertisements

CIEMAT technological contributions to linear colliders Fernando ToralGandía, 3/12/2005.
1 STILL open points: lead, ECC Packaging, CS laminated film, skates Construction Strategy Working groups BAM design and construction BAM LNGS site preparation.
1 Brick and Wall dimensions S.Buontempo, J.Dupraz, A.Franceschi, D.Frekers, H.Pessard, P.Mugnier, E.Vanzanella. What do we call a “brick” ? Brick components.
1 Certification of Compliance with New Meal Pattern Requirements.
Lunchtime Topics Craig Weise Construction Reform Program Director Lisa Conomy Construction Counsel OSU Office of Legal Affairs.
1 LHC-DFBX Procurement Strategy Joseph Rasson LBNL Presented at the DFBX Production Readiness Review October 2002, LBNL Brookhaven - Fermilab - Berkeley.
Trip Report on the visit to ICST of HIT, Harbin, China Derun Li Mike Green Steve Virostek Mike Zisman Lawrence Berkeley National Laboratory (from December.
1 BAM Activity at CERN New welding tools Alternative folding brick: dimension measurements Leakage test measurements in destructive mode Pressure test.
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
REPLACEMENT AND MAINTENANCE OF LIFTS GIVING ACCESS TO LHC UNDERGROUND AREAS TENDERING PROCEDURE IT-4056/EN 105 December 2014 Floris Bonthond.
LCG Milestones for Deployment, Fabric, & Grid Technology Ian Bird LCG Deployment Area Manager PEB 3-Dec-2002.
© 2012 Autodesk Using Autodesk ® Inventor ® for Sales Mark Keenan Business Development, Technicon Systems, Inc.
Noneducational Community-based Support Services Funding Education Service Center Region 11 Fort Worth, Texas.
WU1 - Management S. Gammino (INFN). WU1 Management and TDR preparation: overview and criticalities 2 The WP6 aim is to define the best design of the Warm.
Atlanta Public Schools Project Management Framework Proposed to the Atlanta Board of Education to Complete AdvancED/SACS “Required Actions” January 24,
From Research Prototype to Production
International Meeting Youth for Innovation Linz (Austria), June 2006.
EARTO – working group on quality issues – 2 nd session Anneli Karttunen, Quality Manager VTT Technical Research Centre of Finland This presentation.
TENDERING PROCEDURE IT- 3927/EN
Rev. 0 CONFIDENTIAL Mod.19 02/00 Rev.2 Mobile Terminals S.p.A. Trieste Author: M.Fragiacomo, D.Protti, M.Torelli 31 Project Idea Feasibility.
OPERA bricks LNGS G.Rosa, C.Sirignano Emulsion Workshop, 7-9 December 2006.
Energy for the Future Belene Nuclear Power Plant Project Status.
Status Update Outline  General remarks - reminder  Progress since last Annual Meeting – June 2010  Next steps - timeline EUROnu Costing Ilias Efthymiopoulos.
News on mechanics Photon veto F. Raffaelli INFN – Sezione di Pisa CERN, January r 02 th, Status of tender Anti Status of the supporting.
1 Brick Alternative Layout S.Buontempo on behalf of BAM Committee Present design (Baseline) and “minor modifications” New CS and CSS design Alternative.
Compressor status AWAKE Technical Board meeting 19 August 2015.
Brick gas tightness & emulsion-lead compatibility Opera Collaboration Meeting Hamburg, June 2004 F.Laudisio, G.Romano, C.Sirignano Salerno Emulsion.
Status of QUACO project
CENF – Civil Engineering Extension B887 Status – 02 October 2014 Done: (1/2) Preliminary civil engineering drawing and Functional specification approved.
DEX Publication Project OASIS PLCS Telecon 27 November 2007 Trine Hansen.
SOLUTION What kind of plan do we need? How will we know if the work is on track to be done? How quickly can we get this done? How long will this work take.
1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.
G. Carboni - Muon Meeting – Muon Meeting 12/ Agenda IntroductionGiovanni (30’) GEM and TDR AddendumWalter (20’) Update on M1 ratesAlessia.
Status of Anti project. F. Raffaelli,A. Checchetti,C. Capoccia. INFN CERN, July 14 th, Status of the Anti construction test and schedule. -Status.
CENF – Civil Engineering Extension B887 Status – 18 September 2014 Done: (1/2) Preliminary civil engineering drawing and Functional specification approved.
1 Costs to Completion Common funds &Running Costs Support for Running OPERA Funding Issues L. Votano Resource Coordinator OPERA Funding Agencies meeting.
NA62 Organisation of the work - proposal 2/24/20161PD/DT/PO-MH.
For more information, please contact 14/12/2010 EN/CV/DC Technical specification IT-3684 by Elena Perez Rodriguez.
CENF meeting 5 th February STATUS CE engineering contract running : – phase 1 : tender drawings – phase 2 : execution drawings – Phase 3 (option)
Ing. Šimon Kovář, Ph.D. Ing. Jan Valtera, Ph.D. Ing. Petr Žabka, Ph.D. Ing. Josef Skřivánek Term project.
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4144/SMB/HL-LHC (Point 1) IT-4155/SMB/HL-LHC (Point 5)
Proposal for ESS DTL Roadmap. Divide Into Four Phases 1.Conceptual Design Phase (In progress) 2.Technical Design Phase 3.Prototyping Phase 4.Construction.
Wolfgang Vinzenz FAIR Proton Linac 10 th FAIR MAC November 25 th and 26 th 2013 Proton Linac 1 Status Buncher Design  Rectangular design, longitudinal.
PROCUREMENT RULES FOR EXPERIMENTS AT CERN Dante Gregorio CERN Procurement Service.
Workshop summary Outline  Workshop’s aims  Highlights from the presentations (my selection!)  Costing Exercise – What we learnt  Summary - Roadmap.
André Hoddevik, Project Director Enlargement of the PEPPOL-consortium 2009.
IT-4135/EN Supply of Air Handling Units for Industrial HVAC Projects at CERN Technical Specification Paul Pepinster / EN-CV.
PRESENTED BY HENRY RUHNKE WALD, RUHNKE & DOST ARCHITECTS, LLP SIERRA HOUSE & DROP-IN CENTER.
Scope of PCP Phase 1: Solution Design of Q4 First-of-a-kind prototype QUACO Bid Conference, CERN, 07 th July 2016 Arnaud Foussat, CERN TE MSC-LMF Helene.
Monitoring Visit to NatRisk Project
(on behalf of BAM Committee)
Tender Evaluation and Award Process
CSP 25th November 2010 Technical agreement number 3: overview
Rockingham County Public Schools Teacher Evaluation Process
11th meeting of the Monitoring Committee of the Operational Programme Research, Development and Education Prague, 12th October 2017 (2nd day)
Purchasing supplies at CERN
PRE-BID MEETING ITB UNDP Design and Construction of a new medical warehouse in Bissau, Guinea Bissau 15th August 2017 Presented by Antoine Fadoul UNDP-
Global Youth Tobacco Survey (GYTS): Proposal Development
MicroMegas Mechanical Meeting --- Cern April 2014
Curriculum Forms Guidelines and Information
TRAINING SESSION I EU Market Intervention
From a project idea to the kick-off meeting
ApprenticeshipNC Regional Collaboration and Expansion Project
Jacques Delsalle Clean Air and Transport Unit DG ENV
DOD’S PHASED SYSTEM DEVELOPMENT PROCESS
ESSI CHANGE AND nonconformity control SYSTEM
NSS integrated installation plan workshop Introduction
ESHAC #8 Safety Readiness Review Thomas Hansson, ESH
Transmitted by the experts of IWG ASEP
Presentation transcript:

1 BAM status report S.Buontempo on behalf of BAM Committee BAM Committee Firm Pre-selection Tender Documentation BAM site preparation Project strategy May 2003, LNGSOPERA Collaboration Meeting

2 BAM Committee A BAM Committee was formed in March 03 with the task of BAM firm selection by the November 03. The members of the Committee are: Gianfranco Catitti, Ubaldo Denni, Jean Dupraz, Alberto Franceschi, Kaoru Hoshino, Gianni Rosa, Mario Spinetti, Lucia Votano, and SB. H. Pessard and D. Frekers gave their availability for consulting about BMS and Lead if needed. The selection procedure is based on a Pre-selection phase, closed in May 03, followed by an official INFN tender where only pre- selected firms are invited.

3 Firm Pre-selection 3 meetings have been done at LNF for Pre-selection: April 7 th, April 17 th, Mai 7 th -8 th The goals were: - to have a more detailed technical and economic evaluation of proposed designs, - a reduction of ~ a factor 2 on the number of firms to invite to the tender, - to define the evaluation criteria, - to have a first comparative scoring of the submitted projects, - to prepare all the documentation (technical and administrative) for the tender

4 List of firms Simpro (I) yes yesyes RMP-Aldepack (I) yes yes no G&A- Site Tech (I) yes yesyes (only) GRT (I-Switz.) yes yes no Cybernetix (F) yes yes yes Imanpack (I) yes no no IPS (D) yes no - Able (I) no yes ? Fantini (I) yes no - Name Visited Pre-offer Alt. Layouts (see later)

5 Pre - Selection Criteria 100 points to be scored by - firm evaluation (15), - project: technical solution (40), - project: cost (30), - project: running costs (5), - reliability (10). The Committee decided to score the proposal according to the following rules:

6 Template for Evaluation The Committee has defined the following template of items to be used for the evaluation of the pre-projects submitted by the firms Piling: description of adopted method, technical details, material and components, speed and acceleration, piling cycle timing. Pile wrapping and manipulation: description of adopted method, technical details, material and components. ECC and Brick Packaging: description of adopted method, technical details, material and components, welding procedure, vacuum procedure, helium insertion. Quality Control systems: description of adopted method, technical details, documentation on instrumentation to be used and expected performance. Alternative solutions: compatibility with baseline option, expected performance (packaging lifetime, brick dimensions, etc etc).

7 Alternative layout (see other talk) Some of the firms attending the pre-selection phase have submitted “alternative brick layouts” in order to: - simplify laminated film positioning, welding and folding - reduce and/or eliminate risks due to vacuum packaging All proposed solutions are under evaluation and technical studies are going on both in our labs and in firm sites. A strategy to manage the possibility to change brick layout has been defined by the BAM Commitee and will be presented in a dedicated talk.

8 Pre – Selected firms Simpro (I) yes RMP-Aldepack (I) yes G&A- Site Tech (I) no only alternative layout, not compatible with technical specs GRT (I-Switz.) yes Cybernetix (F) yes Able (I) no only budgetary offer Name Pre-selected Remarks All the activities and discussions done during the 3 BAM Committee meetings are collected in internal Minutes.

9 Tender documentation The Committee has also defined the document that will be sent during first week of June to the pre-selected firms as invitation to the INFN tender. The document will include: Revised BAM specs document, Project Milestones, Technical Offer, Cost breakdown, Material sent to firms, Payment Conditions

10 BAM Project Milestones 1 - Technical design with description of commercial and custom components, 2 - Acceptance of Piling section, 3 - Acceptance of ECC packaging section, 4 - Acceptance of Brick packaging section (nominal dimension), 5 - Acceptance of all Quality Check operations at nominal speed rate, 6 - Acceptance of BAM at firm site, 7 - Acceptance of BAM at LNGS site, 8 - Final acceptance (3 months of mass production).

11 Technical Offer The Technical offer shall be divided in the following main 5 sections: Component feeding (1.1.1 in BAM specs document) Piling (1.1.2, 1.1.3) ECC packaging (1.1.4) Brick assembly (1.1.5, 1.1.6, 1.1.7) Control systems including handling of rejected bricks For each section it will be requested: detailed description in words, technical drawing as detailed as possible, manpower demanded (number of shifts, number, frequency and kind of professional).

12 Material for firms Each of the 4 pre-selected firms will be supplied with the following material from the OPERA Collaboration: 1000 lead sheets in 1 transportation box for lead (end of May) 1000 emulsion sheets in final packaging (not refreshed end of May, refreshed end of June at most) 10 samples of CS in final packaging shape (end of June at most) The firms will be also informed about the present laminated film we are using at CERN (Sidec 122TLS95). They will be also supplied of prototype samples of CSS and skates

13 BAM site preparation During last March – April we had two meetings with LNSG technical engineering team (R. Adinolfi, D. Franciotti, A. Fulgenzi, P. Martella, R. Tartaglia) to continue the definition of the BAM site infrastructure The goal is to define all the administrative and technical actions to guarantee the release of the site in final shape by October It was submitted to the LNGS Colleagues all documentation regarding: - the power consumption, - the possible BAM layout, - the logistic for manipulation of brick components and BMS drums, - the safety infrastructures, - the dark room and the clean room, - the air conditioning system Presently the documentation for the construction of all the insulation structure and crane is under way in INFN administration. Delivery is expected before august 03.

14 BAM project strategy (1) Human resources at CERN: BAM CERN based activity is funded by INFN for 2003 (?). After negotiations with CERN management last year we defined the technical support in terms of G. Decreuse (50%) + C. Schillinger (100%) and J. Dupraz. Contracts of technicians last up to September 03. Decision must be taken now on extension. Human resources at LNF: LNF BAM group has started up under A. Franceschi Coordination After first training session of LNF technicians at CERN done in Nov 02, they have started the setting up of a local laboratory, performing first test measurements (see U. Denni talk) and actively participated both in pre-selection phase and administrative organization of tender. New engineer contract expected in June 03

15 BAM project strategy (2) From now to BAM contract: Laboratory activities test measurements will be performed on real piles (and not anymore on iron or Al blocks) concerning: wrapping of the pile with PE and adhesive tapes, alternative welding shapes, folding, and gluing, alternative brick layouts with mechanical packaging solutions leakage rate measurements (destructive and not destructive mode) production of test beam bricks as close as possible to final ones Tender activity we have to follow the preparation of the offers having several contacts and visits to the firms. There will be visits with firms to LNGS by-pass site to define details of BAM vs site infrastructures. LNF colleagues will take care about all the administrative items to prepare for the signature of the contract.

16 BAM project strategy (3) From BAM contract to BAM Acceptance in firm site: Laboratory activities test measurements will be performed on validation of proposed solutions of different BAM sections, especially in terms of compatibility with emulsion sheets. This will often require accelerated aging tests. Production of test beam bricks as close as possible to final ones. Other activity Control the BAM design and construction in selected firm site. Control that the BAM site in LNGS will be prepared according to the requests and schedule Follow the preparation of all the administrative documents to perform the payments according to the fulfillment of different milestones.

17 BAM project strategy (4) BAM revised schedule: Final specifications: December 2002 End of market search: March 2003 Technical audit:April 2003 Call for tenders:May to September 2003 Firm selection:October 2003 Ordering:November 2003 Construction and tests in the firm:December 2003 to January 2005 Delivery at Gran Sasso laboratory:February 2005 Assembly, installation:March 2005 Production acceptance tests at Gran Sasso: April to June 05 Brick mass production:July 2005 to June 2006