1 Connecticut’s New Energy Code Connecticut ASHRAE Tech Session October 13, 2011 Frederick F. Wajcs, Jr. Senior Energy Engineer Connecticut Light and Power.

Slides:



Advertisements
Similar presentations
SEATTLE ENERGY CODE ENFORCEMENT PROCEDURES: PLAN REVIEW AND INSPECTION John Hogan, A.I.A., P.E. Seattle Department of Planning and Development 700 Fifth.
Advertisements

IECC 2006 Issues and Solutions Code Overview and Issue Solving Products.
Sustainable School Design Creating Healthy, High Performance School Facilities Presented by Stephen M. Koontz, Energy Services Leader, Tampa Bay Trane.
BUILDING ENERGY CODES UNIVERSITYwww.energycodes.gov/BECU 1 BUILDING ENERGY CODES UNIVERSITY ANSI/ASHRAE/IES Standard Scope and Application April.
U.S. Department of Energy Building Energy Codes Program
Presents 2012 Revisions to the NC Energy Code For Residential Building started after March 1, 2012.
Stuart Pieloch R C Lurie
Major Changes to the 2009 IECC
Energy Savings Impacts of the Advanced Energy Design Guide: Small Office Buildings Bing Liu, P.E. Research Engineer Pacific Northwest National Laboratory.
eQuest Quick Energy Simulation Tool
ASHRAE Standard Aiming at 50% Energy Savings For
Heating, Ventilating, and Air-Conditioning
Environmental Controls I/IG Lecture 14 Mechanical System Space Requirements Mechanical System Exchange Loops HVAC Systems Lecture 14 Mechanical System.
Commercial Mechanical Requirements
HVAC 101 The Basics of Heating, Ventilation and Air Conditioning
“Do not take anyone’s advice as to how this building should be assembled.”
Heating, Ventilating, and Air-Conditioning (HVAC)
1. 2 CASE STUDY NEW CONSTRUCTION PUBLIC SECTOR Case study by SEDAC What they got… ▪Prescriptive Incentive for individual measures. ▪They did not model.
2009 Washington State Energy Code Residential Sections
Residential Provisions of the 2012 International Energy Conservation Code July 2011 PNNL-SA
Technology in Architecture Lecture 10 Mechanical Systems Lecture 10 Mechanical Systems.
2009 versus 2012 IECC Maryland Affordable Housing Coalition June 26th, 2012.
Commercial Mechanical and Service Water Heating Requirements of 2012 International Energy Conservation Code.
T OPPORTUNITIES FOR ENERGY EFFICIENCY AT TRIBAL GAMING FACILITIES.
Effective March 15, New Base Code 2009 International Energy Conservation Code (IECC) Florida specifics are integrated into the document The biggest.
2004 Florida Building Code, Mechanical/Energy Technical Core Summary (1 hour) June 2004.
Presented by: Energy Systems Laboratory (ESL) Texas A&M University Funded by: State Energy Conservation Office (SECO) US Department of Energy (DOE) The.
Heat Loss & Gain Calculations 1. How Heat Moves in Homes Conduction is the transfer of heat through solid objects, such as the ceilings, walls, and floors.
Chapter 2: Energy Ratings and Economics To be used with the Guide to Building Energy Efficient Homes in Kentucky.
ENERGY STAR Multifamily High Rise Program Testing and Verification Protocols Webinar – Part II August 2011.
Copyright 2008, International Code Council 2012 IECC ® for SERBCA Based on the 2012 International Energy Conservation Code.
MECHANICAL ASPECTS OF MICHIGAN UNIFORM ENERGY CODE MIAM DOHERTY INN CLAIRE, MICHIGAN MARK RILEY.
Arkansas Energy Code 2004 Compliance
Original Materials Developed By: Britt/Makela Group, Inc.
IECC, REScheck, and COMcheck Mark Halverson Pacific Northwest National Laboratory PNNL-SA
Brought to you by: Connecticut Energy Code Frederick F. Wajcs Senior Energy Engineer Northeast Utilities February 10, 2011.
ENERGY CONSERVATION BUILDING CODE – 2006 PRESENTATION BY VP GUPTA PRINCIPAL CHIEF ENGINEER (ELECTRICAL), BSNL CHENNAI.
SEEA Presentation to SEES March 2006 SEEA Presentation to SEES February 2006 SOUTHEAST ENERGY EFFICIENCY ALLIANCE.
Residential Provisions
Commercial Provisions
North Pocono High School
Residential Energy Code Compliance
North Carolina State Buildings Efficiency Conference
IRC CHAPTER 11 AND HERS RESIDENTIAL ENERGY
BUILDING ENERGY CODES UNIVERSITYwww.energycodes.gov/training 1 BUILDING ENERGY CODES UNIVERSITY Residential Requirements of the 2009 International Energy.
Lighting systems HVAC systems Lighting Equipment HVAC Equipment Miscellaneous loads Envelope Energy Conservation Measures (ECMs)
The 2012 IECC A Rare Opportunity for Major Energy Savings Add AIA.
What’s new?. …including “fixes” made to the code in the 2012 Supplement August,
Energy conservation strategies Buildings energy consumption depends on building envelop, efficiency of HVAC and lighting systems, amount of required fresh.
Week 6 The Energy Walk Through. Possible elements of a walk through Understand on-site information collection and listing of essential data for collection.
Zone 4 R-38 Ceilings U-0.35 Windows, Doors R-13 Walls R-19 Floors R-10 Foundations.
Stretch Code Informational Session March 16, 2011.
7/15/2002PP.AFD.09 1 of 43 Yaskawa Electric America Variable Frequency Drives In HVAC Applications.
California Energy Commission Acceptance Test Technician Certification Providers National Environmental Balancing Bureau Annual Education February 26, 2016.
ENERGY SYSTEMS LABORATORY ABOVE CODE ENERGY ENHANCEMENT PROJECT for The City of Arlington ENERGY SYSTEMS LABORATORY Texas Engineering Experiment Station.
Builder’s and Contractors Luncheon Energy Code: The Major Changes.
Stretch Code Informational Session February 16, 2011.
IECC 2012 Standard Lee Brandt, LC, IALD, LEED AP BD+C Principal HLB Lighting Design.
2015 International Energy Conservation Code Overview and Compliance Requirements Martha Shrader, LEED AP, BD+C Sustainability Manager University of Maryland.
2015 International Energy Conservation Code
Energy Codes and the Building Envelope
Mark Hydeman, PE of Taylor Engineering
Section 6: Air-Conditioning (Heating And Humidification)
Transitioning to the 2012 IECC The devil is in the details
Energy Code Program Manager – SPEER
Performance Simulation
Compliance Software Tool Approval Technical Assistance Manual
Energy Codes and the Building Envelope
Adding Zones to Existing Systems
Technology in Architecture
Presentation transcript:

1 Connecticut’s New Energy Code Connecticut ASHRAE Tech Session October 13, 2011 Frederick F. Wajcs, Jr. Senior Energy Engineer Connecticut Light and Power

2 New Energy Code 2009 International Energy Conservation Code (IECC) Effective October 7, International Residential Code (IRC) Anticipated in Second Half x New State Building Code

3 Reasons for New Code Improve the energy efficiency of buildings Reduce carbon emissions Requirement for receipt of stimulus funds (including achieving 90% compliance by December 2017)

4 Key Areas Applicability Construction document information Technical requirements Completion requirements

5 Applicability New construction Additions, alterations, renovations or repairs to an existing building, building system or portions thereof Change in space occupancy or use that increases energy demand Change from one lighting use to another Change in space conditioning

6 Construction Document Information Specifically stated in Section (Administration) Insulation materials and their R-values Fenestration U-factors & Solar Heat Gain Coefficients (SHGC) Area-weighted U-factors and SHGC calculations Mechanical system design criteria Mechanical and service water heating system and equipment types, sizes and efficiencies Economizer description Equipment system and controls Fan motor horsepower and controls Duct sealing, duct and pipe insulation and location Lighting fixture schedule with wattage and control narrative Air Sealing details

7 Other Compliance Information for Commercial Buildings Name of code for compliance Heating and cooling load calculations (max. 72ºF heating, min. 75ºF cooling) Interior lighting power allowance and connected power Exterior lighting power allowance and connected power Details necessary for verifying compliance

8 Technical Requirements Mandatory Prescriptive Performance Commercial project must comply with either 2009 IECC in entirety or ASHRAE/IESNA Standard in entirety

9 Commercial Technical Requirements Chapter 5 - Envelope Vertical fenestration 40% maximum of above grade wall Skylight 3% maximum of roof area Insulation and fenestration criteria Opaque wall insulation R-value or U-factor IC rated luminaires in thermal envelope and sealed between housing and wall/ceiling covering.

10 Commercial Technical Requirements Chapter 5 – Envelope Continued Air Leakage Window and door assemblies Curtain wall, storefront glazing and entrance doors Sealing building envelope Dampers on air intake and exhaust openings Loading dock weatherseals Vestibules Plenum insulation and sealing

11 Additional / Different Requirements Under Standard Replacement fenestration needs to comply if >25% of total existing fenestration area Skylight 5% maximum of roof area

12 Commercial Technical Requirements Chapter 5 - Mechanical Calculated heating and cooling loads for equipment sizing Equipment performance Air cooled package equipment more efficient Chiller application & ratings changed Thermostatic control for each zone Heat pump control of supplementary electric- resistance heat Automatic setback, shutdown and shutoff controls Fan horsepower limitation, hp/cfm

13 Commercial Technical Requirements Chapter 5 – Mechanical Continued Duct and plenum insulation and sealing High pressure duct and plenum leak testing Pipe insulation Radiant heating systems for outside building controlled by occupancy sensor or time switch

14 Commercial Technical Requirements Chapter 5 – Mechanical Continued Automatic or readily accessible manual switch on service hot water circulating pumps Snow melt system controls Readily accessible on-off switch on pool heaters without adjusting set point Time switched on pool heaters and pumps

15 Commercial Technical Requirements Chapter 5 – Mechanical Continued Economizers Speed control on VAV fans ≥10 hp Demand control ventilation for spaces >500 sq. ft. and 40 people per 1,000 sq. ft. Energy recovery on fan systems ≥5,000 cfm and minimum outside air ≥70% of supply air Automatic supply air temperature reset controls on multi-zone systems

16 Commercial Technical Requirements Chapter 5 – Mechanical Continued Isolation of cooling tower on water loop heat pump systems Two position valves on water loop heat pumps Pump, boiler and chiller isolation Automatic speed control on cooling tower fans ≥7.5 hp

17 Commercial Technical Requirements Chapter 5 – Mechanical Continued HVAC system completion System balancing Operation manuals, complete with written narrative of how each system is intended to operate Maintenance manuals

18 Additional / Different Requirements Under Standard Automatic shutdown control for ventilation fans >0.75 hp Single zone VAV for AHU ≥5 hp HVAC system commissioning for conditioned area >50,000 sq. ft. Optimum start controls for systems >10,000 cfm Speed control on pump motors >50 hp Efficiency requirements for SPVAC & SPVHP Duct & pipe insulation requirements

19 Additional / Different Requirements Under Standard Voltage drop design criteria for conductor sizing Record power drawing submittal to owner Complete narrative of how each power system is intended to operate Power operations manuals and maintenance manuals for each piece requiring maintenance Calculated service water load

20 Commercial Technical Requirements Chapter 5 – Service Water heating Equipment performance Temperature controls Heat traps Pool covers

21 Commercial Technical Requirements Chapter 5 – Electrical Each enclosed area to have at least one manual lighting control Manual control to allow ≥50% reduction in lighting load Automatic lighting shutoff for buildings ≥5,000 sq. ft. Daylight zones to have independent controls

22 Commercial Technical Requirements Chapter 5 – Electrical Continued Master lighting switch for hotel / motel / boarding housing sleeping units Automatic exterior lighting control IC-rated and labeled recessed luminaires in building thermal envelope All recessed luminaires sealed between housing and wall / ceiling covering Tandem wiring Exit signs <5 watts per side

23 Commercial Technical Requirements Chapter 5 – Electrical Continued Total connected interior lighting power must be less than the calculated interior lighting power Total connected exterior lighting power must be less than the calculated exterior lighting power (Separate for tradable and non- tradable surface) Exterior building grounds luminaires >100 watts must have lamp efficacy >60 l/w

24 Additional / Different Requirements Under Standard Lighting system replacement in space shall comply with lighting power density Direct replacement of existing control device shall comply with new control requirement Automatic lighting control required in defined spaces Separate control required for defined lighting Lighting power densities for building types and space types Base site allowance replaced 5% exterior lighting additional unrestricted allowance (in 2008 supplement). Record drawing submittals to owner

25 Completion Confirm installation is per approved drawings Provide documentation that required controls are installed Provide documentation that connected lighting power is less than calculated lighting allowance Confirm submittals have been provided Received all required inspections

26 Additional Information on web under Technology Transfer Table of 2006 IECC, 2009 IECC and with 2008 supplement requirements Table of , and requirements under Building Performance & Regulations Committee Compliance Documentation Spreadsheets

27 Connecticut Energy Efficiency Fund Energy Opportunities program for commercial retrofit Energy Conscious Blueprint program for commercial new construction and equipment replacement WISE-USE ( )

28 THANK YOU! Questions? Fred Wajcs Conservation and Load Management