Job Order Contracting A Washington State Procurement Option

Slides:



Advertisements
Similar presentations
Construction Contracting
Advertisements

THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
JOB ORDER CONTRACTING Contract Management Department 8/28/121.
ASARECA Procurement guidelines Goods and Works. PROCUREMENT OF GOODS By P rocurement and C ontracting Officer ITAZA MUHIIRWA.
PROJECT MANAGEMENT & BUSINESS PLANNING PROCESS
Contract CloseOut.
LOS ANGELES UNIFIED SCHOOL DISTRICT JOB ORDER CONTRACTING Copyright © 2004 The Gordian Group, Inc. all rights reserved.
CMGC Contracting at UDOT Program, Projects & Lessons Learned
1 1 Dr. Mark Stewart, Camden County Schools Steve Adams, Johnson-Laux Construction Jon Held, Georgia ezIQC SWC Project Manager Willie Moon, DOAS Contract.
Facilities Design Principles Chapter 28. Planning Pitfalls Failure to provide accommodations for handicapped Failure to provide adequate storage Failure.
Resolve Business Disputes and Select and Prepare a Construction Contract Lesson Seven Cert IV - M. S. Martin March 2012.
Alternative Project Delivery Mechanisms The J. K. Spruce Experience Katherine Yates Assistant General Counsel.
On-Call Signal Contract Options for Discussion March 13, 2015 Cape Cod Joint Transportation Committee.
Community Facility Loans/Grants Architect Flow Chart Owner has need for project. RD Area Office is contacted. RD visits project site and discusses project.
WELCOME! SBE Boot Camp LEARN HOW TO BID JOB ORDER CONTRACTS (JOC)
Project Close Out CTC-470.
THE PROJECT TEAM TYPICAL REQUIREMENTS AND RESPONSIBILITIES OF THE PROJECT TEAM TRADITIONAL TEAM ORGANIZATION AND VARIATIONS THE OWNER’S TEAM THE DESIGN.
PROCEDURES FOR SELECTING THE CONTRACTOR
2013 JOB ORDER CONTRACTING CONTRACT MANAGEMENT DEPARTMENT 8/3/2015 CONTRACT KICKOFF Solicitation CLMB312 January 3, 2013.
Expectations What your Construction Professional, Architect, Construction Manager/Contractor expects from you? What you can expect from your Construction.
November 3, 2002CVEN349 - Maxwell1 Procurement and Materials Management Module 6.2 November 3, 2002.
Prof Awad S. Hanna C HANGING P ROJECT D ELIVERY S YSTEMS by Awad S. Hanna, Ph. D., P. E. The University of Wisconsin, Madison Department of Civil and Environmental.
Have you silenced your cell phone? 1 2 Job Order Contract Informational Meeting Presented By: City of Bellevue and The Gordian Group April 15, 2010 City.
SPDES General Permit for Stormwater Discharges During Construction Activity GP Mike Jurkowski, CPESC, NYSDOT - Summary of Changes From GP
Genesis Solar Module Brochure ™
Copyright © 2009 T.L. Martin & Associates Inc. Chapter 3 Requirements of a realistic CPM schedule.
SPORT MANAGEMENT 302 (a) B. FLAHERTY Questions/Comments?? Quiz next week, Chapters 1-6 Complete Chapter 7 “Funding and the Bid Process” Chapter 8 “Constructing.
Public Works Contracting Marsha Reilly Office of Program Research House of Representatives recommended.
This Presentation is a Copyrighted Property of Waller S. Poage, AIA, CSI, MAI, CVS – All Rights are Reserved Session CDT 01 – Fundamentals Lesson CDT 1.3.
Construction Management: At Risk. PROJECT MANAGEMENT STRUCTURE: Contractual Relationships Owner Architect/Engineer General Contractor Sub Construction.
JOB ORDER CONTRACTING CONSTRUCTION SERVICES FOR FACILITIES MAINTENANCE AND OPERATIONS April 26, 2014 Presentation for Presented by Troy Alexander Project.
THE ECONOMICS OF RE-CREATING EDUCATIONAL ENVIRONMENTS HOW TO ACHIEVE HIGH PERFORMANCE SCHOOLS.
Design–Build Contracts G. Hardy Acree Director of Airports Sacramento County Airport System Advantages of of During Turbulent Times.
UESC Project Implementation Construction & Installation ä Issue TO for construction ä The pre-construction meeting ä Review/accept final construction package.
Is Your JOC Program Audit Worthy? z Scott Creekmore.
Job Order Contracting Process Bob Bourg, Claims & Disputes Manager Marlene Anglemyer, Cost Engineer.
CVE 4070 Construction Engineering Test-2 & Review Prof. Ralph V. Locurcio, PE.
Managing Engineering Design - Infrastructure. Presentation Overview 1.Tools and Techniques 2.Design and Documentation 3.Estimating and Scheduling.
1 DPW Presentation to the Portfolio Committees on Correctional Services and Public Works Kimberley Correctional Centre 24 November 2010.
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
CVE 4070 Construction Engineering Course Review & Critique Prof. Ralph V. Locurcio, PE.
EXAMPLE – Quality Control Plan For Contractors To view the Pre-Award Phase presentation, please go to: Click on "PIPS"
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
Agency Construction Management :CM NOT AT-RISK
Managing Construction Chapter 16. Contractor Projects are overseen by a contractor who owns and operates a construction company. Projects are overseen.
Conformance & Documentation Services Copyright © 2009 Sleighter Engineering, Inc.
Contractor Alternate Design Serving the Public’s Best Interest.
Construction Coordination BIM Curriculum 06. Topics  Problems of the Construction Industry  Objectives  The Virtual Construction Model  Benefits.
CHATSWORTH HIGH SCHOOL. LOCNSNAMTASK_NAME 8583CHATSWORTH HSPURCHASE & INSTALL MODULAR BUILDING AT GIRLS SOFTBALL FIELD CHATSWORTH HSChatsworth.
Construction Eng 221 Project Management and Administration.
Pre-Construction Activities to include: - Provide effective overlap period and oversight of effort - Estimates during - CPM Schedule - Identify lead-time.
1 CONTRACTING. 2 WHAT IS CONTRACTING ? CONTRACTING IS BASICALLY AN AGREEMENT BETWEEN TWO PARTIES, ONE CALLED THE CONTRACTING PARTY AND THE OTHER THE CONTRACTED.
Contract Specifications Written Set of standards and procedures informing the contractors or remediation professionals of materials & operation necessary.
Meet DES Curtis Pate Roland Orr Engineering & Architectural Services Delegated Contracting Authority.
CVE 4070 Construction Engineering Course Review & Critique Prof. Ralph V. Locurcio, PE.
CVE 4070 Construction Engineering HW #6 review Test-2 & Review Prof. Ralph V. Locurcio, PE.
An Overview Of The MBP CM Leadership Manual Presented by: Robert J. Carter, CCM Robert M. Pfeiffer, CCM.
Construction Management At Risk Process
Agenda – JOC Gordian Construction Task Catalog Understanding the Construction Task Catalog ® (CTC) Calculating the Bid Contractor Adjustment Factors Risk.
© Awad S. Hanna, PhD, P.E.1 Estimating and Scheduling CEE 492 Lecture 2 Construction Contracts.
PRESENTED AND PREPARED BY CITY OF MISSOULA PUBLIC WORKS DEPARTMENT.
Constructing Recreation Facilities 8 chapter. Groundbreaking Before the construction begins, a groundbreaking ceremony is often held in recognition of.
Introduction to Energy Efficient Design
JOB ORDER CONTRACTING FUNDAMENTALS
Camera PDR/CD1 Planning 19 September 2008
Job Order Contracting (JOC)
(Additional materials)
CHANGING PROJECT DELIVERY SYSTEMS
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Traditional Steps Leading To A Bid Document
Presentation transcript:

Job Order Contracting A Washington State Procurement Option

Procurement Options Design – Bid – Build Design – Build General Contractor/Construction Manager Job Order Contracting Small Works Roster

Definition of JOC "Existing Washington State RCW 39.10.420 to RCW 39.10.460 Job order contract" means a contract in which the contractor agrees to a fixed period, indefinite quantity delivery order contract which provides for the use of negotiated, definitive work orders for public works

General reasons to choose JOC Multiple projects that typically range from $25,000 to $350,000 in value Total dollar volume of work is less than $4 million per year Limited owner staff availability for proper implementation of other methods Urgency for project completion

Unique aspects of JOC The owner can stop the JOC contract at any time Procurement of JOC Contractor = the best competitive coefficient (no hidden costs) Partnership with JOC Contractor leads to trust and a familiarity with owner’s unique needs Constant value engineering provides best value practices Unit Price Book = best average cost JOC eliminates change order philosophy since change orders are based on Unit Price Book

What is JOC’s construction niche? Fast response for small ($350,000 or less) repair, renovation, remodel and alteration projects Services provided on an on-call basis Lump-sum fixed price for each work order Owner negotiates (consensus) the scope of work Cost coefficient is established upfront

JOC Contractor’s Coefficient The coefficient provides a factor or multiplier that applies to all items in the Unit Price Book JOC is responsible for: Quality Control and Safety Superintendent & Field Engineer Risk Identification & Incidental Sketches Corporate Fees of Administration and Margin Project Management Sub contractor procurement, Value engineering, Procurement-materials & supplies, General conditions, Project closeout, As-built drawings & operations manuals Bond and Insurance Costs Sub-contractors do NOT use Unit Price Book

Typical Projects Infrastructure upgrade projects (usually multi-discipline) Bathroom renovation ADA Compliance renovation projects Communication/security systems installations Classroom renovations Parks and playfields renovation projects

Some Benefits of JOC for Owners Reduced lead time – no need to plan or prepare bid documents and drawings for each work order Eliminated bid time Expedited engineering, since JOC projects usually require no architectural or engineering services for construction of projects Joint scoping and re-scoping as needed

Increased Opportunities for Small and Disadvantaged Businesses JOC furnishes bonding for most subcontractors JOC completes “red tape” requirements JOC uses best value bid analysis for subcontractors & partners with subcontractors JOC recruits small and disadvantaged businesses JOC coaches subcontractors in all aspects of quality work, safety and project management (as needed) JOC pays subcontractors promptly, typically subcontractor payment is not tied to JOC contractor’s payment from the owner, and no retainage is held.

Mapping the JOC Process Notes 1 – Owner, Owner’s Staff and JOC Contractor Conduct Site Visit

Site visit with Owner Owner and JOC Contractor walk site Visit job site with Owner’s representative and Users, where possible Determine project information scope (i.e. desired materials, special needs, etc.) Take measurements of field conditions Take photos for documentation and communication purposes Determine cost and schedule parameters Issue comprehensive Site-Visit Minutes

Develop Scope of Work Scope of Work Development Discuss scope with Owner and Facility Manager Questions to clarify scope of work answered Produce detailed scope of work Produce any sketches required Review and revise the estimate with Owner for final scope

Scope of Work Example Demo / dispose of 3 existing lights Reuse existing circuit for new lights. Remove & replace 2 existing HVAC grilles Install gyp ceiling at 8' 8" with 4 new surface mounted explosion proof lights. Relocate existing smoke detector to new ceiling Demo CMU for 42" opening min. (exist opening +/- 36") Demo & dispose of existing metal partitions and replace with new 4" CMU covered completely with ceramic tile, with one block scupper at bottom of each Remove and reinstall existing 3 urinals and 2 commodes Demo ceramic tile, floors and walls, typ. and walls, typ (exist ceramic on walls is approx. 8'-0" high)

Scope of Work Example Install new mirror provided by owner Demo & dispose of vanity & sinks, install new stainless steel counter with integral sinks supplied by owner (save existing P-traps & faucets for reuse on new sinks) Demo existing partitions, replace with4" CMU covered completely with ceramic tile & scupper at bottom of each Demo ceramic tile, floors & walls, typ. Remove existing paper towel dispenser and turn over to Owner Install 1 ea hand dryer, wire to existing, adjacent 110Voutlet. All new wiring to be concealed NOTE: Replace entry door - 3-0x7-0, HM with kickplates both sides, reuse hardware Typical all restrooms

Proposal Phase Work Order Request Proposal Package Cover Letter Work Order Form Comprehensive Line Item Estimate Preliminary Schedule Final Scope of Work Scope Negotiations – reach consensus Final Work Order Form is signed by Facility Manager

Work Order Proposal Estimate Package Proposal Package Delivery JOC contractor details the project execution plan and schedule JOC contractor identifies time saving suggestions where possible JOC contractor provides value engineering ideas, “constructability” input, and quality control Owner and contractor review and discuss line item estimate . . . Consensus

JOC Consensus Are the estimated line items appropriate? Negotiations under JOC are different from other delivery Methods JOC negotiations are based on line item selection, line item quantity and schedule, not price The result of negotiations is consensus The Owner has the opportunity to review and discuss the Work Order proposal so that they can answer “Yes” to the following questions before approving the Work Order Proposal Estimate Package: Are the estimated line items appropriate? Are the estimated quantities correct? Is the proposed schedule acceptable? Is the bottom line price fair and reasonable?

Construction Prepare all subcontract documents Mobilize and manage all subcontractors Provide on-site supervision of ongoing work Provide jobsite safety supervision Provide quality control and assurance for the work Provide regular progress reports (as needed) Conduct pre-final and final inspections

Project Closeout Final punch list (if necessary) Acceptance of work As-built documentation Operation and maintenance manuals, equipment lists, and training where applicable