CDC Scrutineer Talk Elliott Wolin GlueX Collaboration Meeting Jefferson Lab 9-Sep-2004.

Slides:



Advertisements
Similar presentations
Davide Piccolo INFN Napoli Muon Annul Review Cern 15 September 2003 Chamber Production QA/QC MUON ANNUAL REVIEW On RESISTIVE PLATE CHMABERS CERN, 15 September.
Advertisements

Status of test beam data analysis … with emphasis on resistive coating studies Progress and questions 1Meeting at CEA Saclay, 25 Jan 2010Jörg Wotschack,
Daikin Altherma™ Troubling Shooting
April 17, 2015Jonathan Valvano EE445M/EE380L.6 Recap RTOS Debugging/verification Lab 4 Application of RTOS Input sound, analog filter Digital filter, FFT.
Manchester 09/sept/2008A.Falou & P.Cornebise {LAL-Orsay}1 CALICE Meeting/ Manchester Sept 2008 SLAB Integration & Thermal Measurements.
08 September 2009 A.Kashchuk INFN-Ferrara and PNPI-St.Petersburg 1 A.Kashchuk
RD S. Aune CEA/IRFU Micromegas Bulk for CLAS12 vertex tracker.
Layer 0 Grounding Requirement in terms of noise performance Grounding/Shielding studies with L0 prototype Summary Kazu Hanagaki / Fermilab.
Aging, High Rate and Shielding L. Lopes Lip-Coimbra.
1Daya Bay RPC HV FDR 6/17/2008 RPC HV cable pick-up noise issue C. Lu, Princeton University (6/17/2008)
Global Design Effort Detector concept # Plenary introductory talk IRENG07 Name September 17, 2007.
New Readout Methods for LAr detectors P. Otyugova ETH Zurich, Telichenphysik CHIPP Workshop on Neutrino physics.
Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
Analog Cable Status Basic design fixed --- the latest cable has good quality. (report by Frank) Capacitance for single cable ~0.35pF/cm --- both new and.
Introduction to GEM detectors assembly Leszek Ropelewski CERN CompassTotem 33 cm NA61 30 cm 20 cm 66 cm Totem Upgrade 10 cm.
SSD Operations Manual March 2014 SSD: 4 th layer of vertex detector Heavy Flavor Tracker Silicon Strip Detector – Operations Manual PXL Inserted from this.
LBNE R&D Briefing May 12, 2014 LBNE R&D Briefing May 12, 2014 LArIAT and LBNE Jim Stewart LArIAT EPAG Chair BNL LBNE LARIAT-EPAG J. Stewart BNL T. Junk.
Semiconductor detectors
SVX4 chip 4 SVX4 chips hybrid 4 chips hybridSilicon sensors Front side Back side Hybrid data with calibration charge injection for some channels IEEE Nuclear.
The Straw-Tube Tracker of the ZEUS Detector at HERA
October 28-th, 2005Straw tracker 1 Status of Straw Tracker for P236 P.L. Frabetti, V.Kekelidze, K.Kleinknecht, V.Peshekhonov, B.Peyaud, Yu.Potrebenikov,
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
Report of the NTPC Test Experiment in 2007Sep and Others Yohei Nakatsugawa.
Experience with the MVD Living around the beam pipe Components, connections, signals, systems Hubert van Hecke - Los Alamos.
1 HBD Commissioning (II) Itzhak Tserruya HBD group meeting November 28, 2006 Progress from October 3 to November 28, 2006.
BigBite Wire Chamber Test Xin Qian Duke University Feb 20th For TRANSVERSITY Collaboration Wire chamber Gas Cerenkov Shower system Scintillator Magnetic.
Apex Target Marco Oriunno, April 23, Design and fabrication by: Marco Oriunno, Dieter Walz, Jim McDonald, Clive Field, Douglas Higginbotham, and.
Large Area Endplate Prototype for the LC TPC 1 D. Attié, P. Baron, D. Calvet, P. Colas, C. Coquelet, E. Delagnes, M. Dixit, A. Le Coguie, R. Joannes, S.
DC12 Commissioning Status GOALS: establish operating conditions, determine initial calibration parameters and measure operating characteristics for the.
27 Octobre 2005IEEE2005 Nuclear Science Symposium, Puerto Rico, Niels Tuning 1/18 A High-Efficiency and High- Resolution Straw Tube Tracker for the LHCb.
Physics Requirements Current CDC Design R&D Items What We Have Achieved (Publications) What is Left Out? Summary and Conclusions JLC CDC R&D Status As.
The LHCb Outer Tracker Front End, what does it look like and what is the status Talk for the LHCb Electronics Working Group /TS A Collaboration.
HEC Parameters from As-Built knowledge HEC is a homogeneous detector and any mechanical tolerances are well below any significance for physics..... this.
EPS-HEP 2015, Vienna. 1 Test of MPGD modules with a large prototype Time Projection Chamber Deb Sankar Bhattacharya On behalf of.
Malte Hildebrandt, PSIMEG - Review Meeting / 1   e  Drift Chambers Charge Division Test Chamber Testsetup for Cosmics Chamber Construction.
LHCb VErtex LOcator & Displaced Vertex Trigger
14-Dec-15S.Movchan Straw manufacturing and QC1 Straw manufacturing procedure and QC tape and straw parameters specification conditions of straw production:
9 September 2004The Straw Tube Chamber1 The CDC Curtis A. Meyer Carnegie Mellon University Physics Requirements and Specifications Prototype Construction.
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC January 17, 2003TOTEM plenary meeting -Marco Bozzo1 CSC detectors for T1.
Tracking (wire chamber) Shield radon, neutron,  Source foil (40 mg/cm 2 ) Scintillator + PMT 2 modules 2  3 m 2 → 12 m 2 Background < 1 event / month.
26 June 2006Imaging2006, Stockholm, Niels Tuning 1/18 Tracking with the LHCb Spectrometer Detector Performance and Track Reconstruction Niels Tuning (Outer.
Development of Digital Hadron Calorimeter Using GEM Shahnoor Habib For HEP Group, UT Arlington Oct. 12, 2002 TSAPS Fall ’02, UT Brownsville Simulation.
Takeshi Matsuda LC TPC Collaboration March 5, 2008 TPC Endcap Materials.
Towards a 7-module Micromegas Large TPC prototype 1 D. Attié, P. Baron, D. Calvet, P. Colas, C. Coquelet, E. Delagnes, M. Dixit, A. Le Coguie, R. Joannes,
C. Lu, K.T. McDonald RPC Connections October 27, RPC Module Signal and HV Connections (October 27, 2008) Changguo Lu, Kirk T. McDonald Princeton.
CLAS12 Drift Chamber Prototyping
1 Integration and Milestones Elton Smith Hall D Detector Review October 20-22, 2004.
2002 LHC days in Split Sandra Horvat 08 – 12 October, Ruđer Bošković Institute, Zagreb Max-Planck-Institute for Physics, Munich Potential is here...
Hall D infrastructure and integration Elton Smith Hall D Collaboration Meeting September 9-11, 2004.
Quality control for large volume production GEM detectors Christopher Armaingaud On behalf of the collaboration GEMs for CMS.
The BoNuS Detector: A Radial Time Projection Chamber for tracking Spectator Protons Howard Fenker, Jefferson Lab This work was partially supported by DOE.
Zaragoza, 5 Julyl Construction of and experience with a 2.4 x 1 m² micromegas chambers Givi Sekhniaidze On behalf of the Micromegas community.
HBD Report Craig Woody BNL DC Meeting January 7, 2009.
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL December 13, 2006 Progress from October 3 to November 28, 2006.
TPC Large Prototype panels D. Attié, P. Colas, E. Delagnes, M. Dixit, A. Giganon, M. Riallot, F. Senée, S. Turnbull Status of the Micromegas Large Prototype.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
BABAR  &  L. de Brunhoff Drift Chamber System BABAR Drift Chamber Project Co-System Managers D.B.MacFarlane, McGill University A.J.S.Smith, Princeton.
TRIUMF laboratory studies Christopher Hearty University of British Columbia/IPP 27-Sep-2010.
Upgrade of the MEG liquid xenon calorimeter with VUV-light sensitive large area SiPMs Kei Ieki for the MEG-II collaboration 1 II.
Low-energy Sim/Reco Capability Xin Qian (BNL) Tingjun Yang (FNAL) 1.
New MPGDs at CERN PCB Workshop
FCAL R&D towards a prototype of very compact calorimeter
Calorimeter Mu2e Development electronics Front-end Review
HEC Electronics Chain HEC chain-2000 Spice model Analytical model
BoNuS: Radial-Drift TPC using Curved GEMs
ScECAL+AHCAL+TCMT Combined Beam FNAL
Transition Radiation Studies with Xe GlueX Collaboration Meeting
(On Behalf of CMS Muon Group)
MEG II実験 液体キセノン検出器の建設状況
Limited Streamer Tube Project Summary
Presentation transcript:

CDC Scrutineer Talk Elliott Wolin GlueX Collaboration Meeting Jefferson Lab 9-Sep-2004

Scrutineer? scrutineer n. a scrutinizer; specifically, an examiner of votes, as at an election. scrutinizer n : a careful examiner; someone who inspects with great care

Strategy Assume role of a skeptical reviewer Assume role of a skeptical reviewer Present list of questions/concerns not covered in Design Report and in DocDB Present list of questions/concerns not covered in Design Report and in DocDB Please add to my list! Please add to my list!

But first… I find the project in good shape I find the project in good shape Confidence in CMU to solve remaining problems Confidence in CMU to solve remaining problems Only concern is effectiveness of dE/dx in magnetic field, with real preamps, etc. Only concern is effectiveness of dE/dx in magnetic field, with real preamps, etc.

Skeptical Reviewer’s Concerns Conceptual Conceptual Performance Performance Mechanical Mechanical Services (gas,electrical,hv,etc.) Services (gas,electrical,hv,etc.) Onboard electronics Onboard electronics Reconstruction and Analysis Reconstruction and Analysis

Conceptual No VTX implies need for re-optimization of STC/CDC/FDC geometry No VTX implies need for re-optimization of STC/CDC/FDC geometry New Cerenkov implies reevaluation of dE/dx requirements New Cerenkov implies reevaluation of dE/dx requirements Is prototype plan adequate…need more? In B field? Is prototype plan adequate…need more? In B field? Why not resistive wires? Why not resistive wires? If dE/dx not needed skip ADCs? Or drift? If dE/dx not needed skip ADCs? Or drift?

Performance Look at other gases? CO2 - long pulse, pile-up? Look at other gases? CO2 - long pulse, pile-up? Understand aging better Understand aging better Understand Lorentz angle effects better Understand Lorentz angle effects better Effect of breakdown, broken wire? Effect of breakdown, broken wire? Verify dE/dx works in B field Verify dE/dx works in B field Gain variations vs V, wire sag, gas purity, etc. Gain variations vs V, wire sag, gas purity, etc. Cross talk – straws, preamps, via HV, etc. Cross talk – straws, preamps, via HV, etc. Rate effects – V sag, preamps, x-talk, heat, signal pile-up, etc. Rate effects – V sag, preamps, x-talk, heat, signal pile-up, etc.

Mechanical Verification of matl’s, glue, techniques Verification of matl’s, glue, techniques Glue lifetime – radiation damage, etc. Glue lifetime – radiation damage, etc. Failure mode analysis Failure mode analysis How to repair? Time? Replace wire? How to repair? Time? Replace wire? Survey, align requirements? Plan? Survey, align requirements? Plan? Supports, stability, deflections, vibration? Supports, stability, deflections, vibration? QC (clean,glue,crimp,tension) – students? QC (clean,glue,crimp,tension) – students? Al vs Cu vs Au? mylar vs kapton? Al vs Cu vs Au? mylar vs kapton? Metal coating thickness, skin depth? Metal coating thickness, skin depth? Are compound angle problems under control? Are compound angle problems under control? Interfaces, keep out zones, installation plan? Interfaces, keep out zones, installation plan?

Services Gas distrib, uniform flow, purity, cleaning? Gas distrib, uniform flow, purity, cleaning? Room for cables, services? Mass? Room for cables, services? Mass? HV dist, granularity, currents, cable type? HV dist, granularity, currents, cable type? Discharges - HV cap, resistor size calc? Discharges - HV cap, resistor size calc? Power, heat, noise, shielding, grounding? Power, heat, noise, shielding, grounding? Is temperature rise a problem? Gas flow rate? Is temperature rise a problem? Gas flow rate?

Onboard Electronics Preamp design? Preamp design? Preamp mounting, power, heat, x-talk? Preamp mounting, power, heat, x-talk? Cable type, quality, thickness, max length? Cable type, quality, thickness, max length? Signal shape variations? Shaping? Signal shape variations? Shaping?

Reconstruction and Analysis Calib plan – special runs? Survey reqs? Calib plan – special runs? Survey reqs? Pat rec – spiraling tracks, bad straws, showers, event pileup, x-talk, ambiguities, Pat rec – spiraling tracks, bad straws, showers, event pileup, x-talk, ambiguities, Track fitting – mult. scatt, dE/dx, Kalman filter? Track fitting – mult. scatt, dE/dx, Kalman filter? What if no tagger info? What if no tagger info?

Conclusions CDC project in good shape CDC project in good shape Some open questions Some open questions Some tests still needed Some tests still needed CMU headed in the right direction CMU headed in the right direction Seem to have enough time, people, $$? Seem to have enough time, people, $$? “Reviewer’s” questions should be satisfied by adequate documentation of past work, and planned future work “Reviewer’s” questions should be satisfied by adequate documentation of past work, and planned future work