Regional co-operation within the Third Package Nigel Sisman Senior Adviser Stakeholder Group, GRI NW, Den Haag, 7 May 2010.

Slides:



Advertisements
Similar presentations
The Agency for Cooperation of Energy Regulators (ACER) – UK Government views Sue Harrison Head of European Energy Markets 13 February 2008 EPP-ED Public.
Advertisements

IG meeting TITRE 04/04/2013 IG meeting Coordination of the (early) implementation of network codes Programme Office.
1 TITRE Identifying priorities for GRI NW and setting agenda for Menno van Liere Programme Officer GRI NW 11 th Stakeholder Group meeting GRI.
ENTSOG’s view on next steps for regional co-operation Nigel Sisman Senior Adviser Stakeholder Group, GRI NW, Brussels, 26 Nov 2010.
Gas Regional Initiative – North West Region Investment workshop The Hague – 4 June 2010 Investment Project Regional Investment Plans Introduction to methodology.
David Halldearn Energy Market Insights Limited 5 July 2010.
New structure of GRI NW following revised road map Stakeholder Group meeting Brussels, 26 November 2010 Peter Plug Chairman GRI NW.
Future role of GRI NW Stakeholder Group Meeting The Hague, 7 may 2010 Peter Plug Chairman of GRI NW.
Completing the EU internal energy market IFIEC, 22 November 2011
Bente Danielsen, ERGEG Transparency Project Team leader Alain Taccoen, ENTSO-E WG Market Information and Transparency, convenor Florence Forum June 2010.
Stakeholder Group Meeting 26. May 2010 Northern Regional Initiative in a European context Jeppe Danø.
The role of ACER In the Regional Initiatives Steve Gordon Head Of the Gas Department North West Regional Initiatives 2011.
RCC meeting Monitoring implementation of network codes TITRE 18/10/2012 RCC meeting First thoughts on project approach for monitoring implementation of.
Adeline Lassource (CRE) Charlotte Ramsay (OFGEM) 10 th FUI SG, London, 11 th March 2011 Progress with market integration: European initiatives and impact.
ACER’s view on the future role of the Gas Regional Initiative Dennis Hesseling Head of the Gas Department, ACER 11 th Stakeholders group meeting of GRI.
Heinz Hilbrecht Director "Security of Supply and Energy Markets" European Commission - DG TREN , GRI NW, Amsterdam Regional Cooperation Role of.
GRI NW European Energy Work Plan 2011 – 2014 Programme Office RCC meeting, 15 September 2011.
Jose Braz, ERGEG Conference on Implementing the 3rd Package 11th December 2008 The Agency for the Cooperation of European Energy Regulators.
Does the Third Package provide the European TSO associations with the tools necessary to find solutions to the European energy challenge ? Pierre BORNARD.
GRI NW Stakeholder Group Meeting – 25 November 2011 GRI NW Stakeholder Group Meeting 25 November 2011 Kristóf Kovács The 2014 target and the role of the.
Completing the EU internal energy market
Mark van Stiphout – DG TREN – C2 Internal market for electricity and gas The role of TSOs in the third package EUROPEAN COMMISSION GIE conference 7 May.
Madrid Forum 15 October 2014 Massimo Ricci Chairman.
David Halldearn, ERGEG Conference on Implementing the 3 rd Package 11 th December 2008 Implementating the 3rd Package: An ERGEG Consultation paper.
Lord Mogg Chair of ERGEG Florence Forum June 2009 Implementation of the Third Energy Package.
Gas Regional Initiatives Getting to 2014 Steven Gordon Head of the Gas Department, ACER 8 th GRI Co-ordination Meeting Brussels, 27 th February 2012.
Global Competitiveness in a Liberalised EU Energy Market Wim Groenendijk, Member of the Board Brussels, 22 November 2011 Gas infrastructure and Markets.
How will the Third Liberalization package influence the framework of the regulators? Dr. Annegret Groebel Managing Director and Head of International Coordination.
Towards a European network for digital preservation Ideas for a proposal Mariella Guercio, University of Urbino.
David Halldearn, ERGEG Conference on Implementing the 3 rd Package Brussels, 11 th December 2008 Co-ordination of Decisions at Regional and European level.
TSO progress towards ENTSOG IFIEC Energy Forum 22 Sep 2009 Jacques Laurelut GTE President & GTE+ Transition Manager.
The 3rd package for the internal energy market Key proposals EUROPEAN COMMISSION Heinz Hilbrecht Directorate C - Security of supply and energy markets.
1 GIE Annual Conference Madrid, November 2007 Investing in Europe‘s Future – the Role of Regulators David Halldearn Senior Adviser, European Affairs.
Benoît ESNAULT Commission de Régulation de l’Energie 17th Madrid Forum Madrid, 15 January year network development plan ERGEG recommendations.
Bucharest, 24 October 2008 Making the third package work in practice Wolfgang Urbantschitsch, E-Control.
EUROPEAN COMMISSION Heinrich Hick, DG TREN C 2 3rd IEM Package and relevance of GRI GRI NW stakeholder Conference, London, 14 November 2008.
GTE views on the role of TSOs As foreseen in the Third Package Joint Workshop ERGEG GRI SSE and EFET 21 January 2008.
Does the Third Package provide the European TSO associations with the tools necessary to find solutions to the European energy challenge ? Nigel Sisman,
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
The next steps for regional co-operation GRI NW Stakeholder Group 25 November 2011.
David Halldearn 6 May Background Programme Board initial discussion last year at Stockholm Since then: Further analysis has been undertaken on.
GTE+ progress towards ENTSOG Jacques Laurelut GTE President & GTE+ Transition Manager GIE Annual Conference 2008, Bucharest.
The EU’s Third Energy Package European Code Development UNC Transmission W/S - 4 th December 2008.
22 – 23 November 2007 GIE Annual Conference How the Third Package might encourage investment.
1FTS-CEER bilateral meeting, St Petersburg, 17 May 2011 Peter Plug Chairman of the electricity working group Use and management of interconnections – The.
Madrid Forum 6-7 November 2008 Implementating the 3rd Energy Package: An ERGEG Consultation paper Lord Mogg, ERGEG chairman.
Lord Mogg Chair, ERGEG Madrid Forum, 14/15 January 2010 Strategy for market integration and the role of the Regional Initiatives.
Gas Regional Initiative Impact of the 3rd package & creation of RIG Benoît Esnault (CRE), GRI TF co-chair NW GRI – RCC and ministerial meeting Paris, 8.
European Developments Transmission Workgroup 1 st December 2011.
North West Region Gas Regional Initiatives Regulatory Co-ordination Workshop 23 rd April 2007.
Michael Schmoeltzer Member of ERGEG Gas Working Group GIE Annual Conference, 6/7 May 2009, Groningen ACER & ENTSOG and their interaction.
GRI NW European Energy Work Plan 2011 – 2014 Robert Spencer 20th Madrid Forum, 26 September 2011.
TAIEX-REGIO Workshop on Applying the Partnership Principle in the European Structural and Investment Funds Bratislava, 20/05/2016 Involvement of Partners.
NRA’s vision on GRI NW work plan 2011 Stakeholder Group meeting Brussels, 26 November 2010 Peter Plug Chairman of GRI NW.
Gas Regional Initiative South South-East
10 year investment plan ERGEG approach and contribution
The 3rd package for the internal energy market
FlorenceForum November 2008
Gas Regional Initiative
GRI NW European Energy Work Plan 2011 – 2014
Coordination of the (early) implementation of network codes
Organisational Development
Update on European Network Codes
Steven Gordon ACER Gas Department
Coordination of the (early) implementation of network codes
GRI NW European Energy Work Plan 2011 – 2014
Gas Regional Initiative South South-East
Coordination of the (early) implementation of network codes
Jacques LAURELUT GTE First Annual Work Programme Consultation
Gas Regional Initiative South South-East
Presentation transcript:

Regional co-operation within the Third Package Nigel Sisman Senior Adviser Stakeholder Group, GRI NW, Den Haag, 7 May 2010

Contents Post Third Package –Conceptual framework for Regional co-operation Commission’s 3 Year Priority Plan Implications for regional co-operation Conclusions 2

Regional Cooperation Challenge remains that formal governance and binding rules only occur at European & national levels 3 Third package envisages regional cooperation of and lead by TSOs Member States Regulators Regional co-operation – conceptual framework

Third Package Rules Development process European rules –the primary aspiration –scope for regional specificities Regional activities –to fit with European approaches –scope to accelerate progress –co-ordination and coherence essential 4 Priority setting Framework Guidelines Network Codes Comitology Process Regional co-operation – conceptual framework

3 types of local co-ordination Specific local concerns should be checked for consistency and coherence with European aspirations 5 European driven 1. (Early) implementations 2. Trial approaches Locally driven 3. Specific local concerns Regional co-operation – conceptual framework

Stakeholder support for development processes 6 Commission & Agency set priorities Network Code delivery Commission & Agency approval processes time Define Code Project Plan Code Proposal Development Code Finalisation Regional co-operation – conceptual framework

European 3 Year Plan Madrid XVII request for a co-ordinated plan Joint working between Commission Regulators ENTSOs Objective to approve plan during summer 7 Commission’s Three Year Priority Plan

Extract from EC / ACER /ENTSOG 3-year work plan draft 8 Commission’s Three Year Priority Plan

European / local interaction European 3 Year Plan Should define what local work needs to be done Next year’s plan should build on early framework guideline/code experience Top-down governance to ensure coherence and consistency Avoid double work European and local work must not compete Resources to be focussed to ensure efficient engagement TSOs, regulators. ministries and stakeholders have limited skilled resources at all levels Preserve the good multi-lateral co-operation within the GRI Geography Allow flexibility Local co-operations to embrace relevant geography and key actors 9 Implications for regional co-operation

Conclusions Delivery of progress needs to be consistent with European 3 Year plan Future local co-operation should focus on : –Leaving room for flexibility in local groupings o To cover geographical and relevant actor considerations –Enabling the implementation of codes –Ensuring efficiency in the deployment of resources 10 3 year plan should define regional work (if appropriate) and, where relevant, regional specificities should be fed into the European process by ACER and ENTSOG.