Delay Attribution Guide April 2013 Changes Ana Maria Sanchez Delay Attribution Board Secretariat support.

Slides:



Advertisements
Similar presentations
The Biosafety Clearing-House of the Cartagena Protocol on Biosafety Tutorial on Registering Information.
Advertisements

Agenda Introduction Advisory Circular Changes Consultant Selection Procedures Contract Format and Provisions Methods of Contracting and Allowable Costs.
United Nations Statistics Division
Review of UNC Section Q “Emergencies” Steve Pownall Transmission Workstream.
Manage an IT Project.
SERVICE LEVEL AGREEMENTS The Technical Contract Within the Master Agreement.
Regulation Grant Brown Bag Session February 12, 2013.
WHAT IS HIPAA? The Health Insurance Portability and Accountability Act of 1996 (HIPAA) provides certain protections for any of your health information.
Page 1 Conflicts of Interest Peter Hughes IESBA December 2012 New York, USA.
Overseas (Non-UK) Travel Health and Safety Standard How to Guide April 2015 (v3)
Rail Freight Assistance Program (RFAP) S ETTING THE S TAGE FOR THE F UTURE Rail Transportation Assistance Program (Rail TAP) RFAC Meeting April 28, 2010.
Time for a new standard - AS General Conditions of Contract
ISLAMIC UNIVERSITY OF GAZA FACULTY OF ENGINEERING CIVIL ENGINEERING DEPARTMENT 20. Claim, Disputes and Arbitration [Construction Contract Administration]
SB 490 Amendments to the Kansas Underground Utility Damage Prevention Act Effective January 1, 2003.
New Template of Environmental Compliance Approval with Limited Operational Flexibility Environmental Approvals Branch Presented to Air Practitioners’ Group.
Change Request Management
Japan’s Efforts to Ensure Safety of Railways October 12th, 2010 Railway Bureau MLIT.
TPT EPAF Temporary Part-Time Rehire EPAF. What is a TPT EPAF? The EPAF for Temporary Part-Time (TPT) is an electronic process allowing for paperless personnel.
The Ten Most Common Mistakes in IRB Submissions (How to avoid “3-tylenol-days”)
Offtake Metering Errors Stephen Skipp Asset Manager (Transmission and Storage)
Cohort 8 Grant Closeout Procedures HEIDI SCHULTZ DEBRA APPLETON.
Madrid, 1 st April 2008 Offering of capacities under the OSP.
Records Managers’ Forum 28 February Draft standard on the appraisal and disposal of State records Catherine Robinson Senior Project Officer, Government.
NYS Workers’ Compensation System Compliance Outreach: Measuring and Monitoring Payor Performance Questions /14/2015 & 7/16/2015.
Migration & More Info Kuala Lumpur ICH UG 2010 James SHANNON.
October 25, 2005 Pathways To Successful EU-Research Projects Financial management in FP 6 projects Praha, October 25, 2005 Claudia Labisch KoWi Office.
1 The Impact of SAS 112 on Governmental Financial Statement Audits GAQC Member Conference Call January 4, 2007 Presented by Chuck Landes, CPA.
UIC ERTMS World Conference
SUMMARY OF INFORMAL COMMENTS Temporary Waiver of Terms Regulations May 2006.
Indonesian Timetabling Conference Introducing Timetabling and Train Control where there a Multiple Operators 31 May 2011.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.1 Steps in the Licensing Process Geoff Vaughan University.
The Variety of Reports in Business Business Information Management II.
Planning Obligations & Section 106
SPS policy – Information Presentation Presentation to ROS June 16, 2004.
Avoid Disputes, Not Complaints Presented by: Stuart Ayres and Derek Pullen Stuart Ayres, Scheme Manager Derek Pullen, Scheme Adjudicator.
Delay Attribution Guide April 2011 Changes Ana Maria Sanchez Delay Attribution Board Administrator.
Special Railways Phase III Proposed approach to regulatory changes Jakarta 16 May 2011.
Reasonable Accommodation Process Access. Michelle Day Project Manager Kim Jones Regional Disability Coordinator 2.
New Rail Market Access Rules Directive 2012/34/EU (recast) EUROPEAN COMMISSION.
Madrid, 1 st April 2008 Proposal for the commercialisation of existing and committed capacity at the cross border point of Larrau between France and Spain.
Pol-PRIMETT II – London Conference “Cross border mapping and analysis of metal theft within the EU” José Pires Rail Security Senior Advisor - UIC 16 September.
Local Assessment of Code of Conduct Complaints. Background  On 08 May 2008 – the local assessment of Code of Conduct complaints was implemented due to.
Grid Operations Centre LCG SLAs and Site Audits Trevor Daniels, John Gordon GDB 8 Mar 2004.
International Ethics Standards Board for Accountants Breach of a Requirement of the Code Kate Spargo New York City, U.S.A. October , 2011.
Proposed Preliminary Statewide Full Service Partnership Classification System BASED ON STAKEHOLDER FEEDBACK THIS REPORT IS THE MENTAL HEALTH SERVICES OVERSIGHT.
. Thematic Working Group 4 Possible Elements – Chapter VI: Constraints, gaps and related financial, technical and capacity needs CGE Workshop to exchange.
Delay Attribution Guide September 2011 Changes Ana Maria Sanchez Delay Attribution Board Secretariat support.
“We will lead the nation in improving student achievement.” Facility and School Registry Laura Haase September 1, 2010.
Page 1 | Proprietary and Copyrighted Information Safeguards Gary Hannaford, Task Force Chair IESBA Meeting New York, USA June 29 – July 1, 2015.
British Library Document Supply Service (BLDSS) API
Annual Performance Management Cycle Management Training Tutorial
BAR Independent Alternative Dispute Resolution
Room and Resource Reservations
Professional Engineering Practice
20th April 2016 Teleconference
Presentation title User-friendly document – reporting, accounting and review – second commitment period KP 14th meeting of GHG inventory Lead Reviewers.
20th April 2016 Teleconference
James SHANNON RA44 – BUD 15 Sept 2010
Unit4 Customer Portal Submitting & Managing Cases.
2P13 Week 2.
Internal control - the IA perspective
..
20th April 2016 Teleconference
D&WRFU FUNDING Dorset & Wilts Rugby Football Union Limited
Welcome to Facility and School Registry (FSR) Presentation
Fasset Briefing Session
Workload Staffing Reports
Status report of TF-CS/OTA
Time Distribution Report OMB Circular A-87, Attachment B. Paragraph 8 h. Standard Operating Procedures
USOAP Continuous Monitoring Approach (CMA) Workshop
Presentation transcript:

Delay Attribution Guide April 2013 Changes Ana Maria Sanchez Delay Attribution Board Secretariat support

1 st April New Codes 2 new codes have been introduced to the April 2013 Delay Attribution Guide (DAG) JB – this is a replacement for the old QL code. A new incident is required for any reactionary delays caused by a late running train as a result of a ‘P’ coded TSR. YQ - Where an operator’s service suffers delay as a result of overcrowding or station overtime due to that train being of short-formation, and all reasonable attempts to mitigate have been made, the delay should be attributed to the prime cause incident that resulted in the train being of short-formation for that service. CODECAUSE ABBREVIATION JB Reactionary Delay to ‘P’ coded TSR PLND TSR YQ Passenger overcrowding caused by a train being of short- formation SHRT FRMD

1 st April New JB code example JB Example Train “A” runs 5 late, with a P-coded Temporary Speed Restriction being the largest cause of delay. Train “B” is then regulated for “A” and is itself delayed. The delay to Train “B” is explained as “YB” to Train A, but this cannot be allocated to the original P-coded incident. A separate incident coded “JB” must therefore be created, to account for the fact that the TSR has caused reactionary delay, and the delay to Train “B” allocated there.

1 st April New code YQ example YQ Definition – As per current but with the additional comment: “The delay should be explained as a reaction to whichever train is initially responsible for the short formation”. YQ Example The diesel unit scheduled to form Train “A” encounters a brake defect and has to be taken out of service. To avoid cancelling the service, the operator detaches a unit from Train “B” (which is booked to run with two attached units) and runs that in place of the failure. This means that Train “B” (and possibly later workings) has to run with half its planned passenger capacity. Delays caused by overcrowding on the short-formed Train “B” should be allocated to an incident coded “MN” (to account for the original failure) and described as “YQ” to Train “A”. This principle would equally apply where, for example, Train “A” encountered an external object on the line which damaged the train and the incident was established as vandalism, the responsibility of Network Rail. Delays subsequently caused by overcrowding on the short-formed Train “B” (and possibly later workings) should be allocated to an incident coded XB and described as “YQ” to Train “A”.

1 st April Guidance where NFF 4.25 Guidance where no fault found (technical equipment) has been updated to indicate that: If there is NO agreement that all reasonable efforts have been undertaken to investigate the delay, then the NFF section is not to be used. Where parties have agreed that all reasonable efforts to investigate have been done then NFF is applied has been updated to include the words in the below paragraph in italics Where a train fails to read a piece of infrastructure based equipment but then reads subsequent equipment and it cannot be determined if the fault is train based or infrastructure based, it should be deemed unless otherwise proven, that the fault is with the train based equipment. Where two or more separate trains fail to read the same equipment in similar circumstance, it should be deemed that the fault is with the infrastructure based equipment. This principle of two or more separate trains should also be applied in the same way to two separate train-based radios.

1 st April Delays caused by RETB system failure where no fault is found following investigation, are considered to be the responsibility of the Operator. The table in 4.25 has been amended also.

1 st April Any Questions? We encourage you all to visit the DAB website at: There you will find the latest copies of the DAG, Freight user documents and competency standards. The web site is updated regularly with up and coming events and activities that the DAB are undertaking. You can use the website to obtain forms to make proposals for change to the DAG and PDAC as well as to make requests for guidance. You can use the website to make suggestions on how to improve delay attribution on the whole. You can the website, however, please do not use this facility to request specific attribution guidance – the request for guidance process is to be followed in these cases. Feel free to the DAB Secretariat on: for clarification on process in regard to delay