1 Developing the MBSE Approach Tony Ramanathan Principal Engineer Network Rail.

Slides:



Advertisements
Similar presentations
Interfacing Risk and Systems Engineering – Left Shift Risk Management
Advertisements

Operation & Maintenance Engineering Detailed activity description
Capacity Studies on Transportation Network Presented by Rakesh Ambre ( ) Under Guidance Of Prof. Narayan Rangaraj.
European Rail Agency Workshop 29 th September 2011 (Lille) Dr Björn Paulsson (UIC) Dr Stephen Ingleton (Newcastle University) REDUCING THE OCCURRENCES.
Proactively Preventing Freight Wagon Derailment Innotrans | Berlin| 18 th September Dr Björn Paulsson (UIC) Grigory Kozyr(UIC) Gordana Vasic (NewRail.
1The Expanding UK Rail Sector - DELACOUR - Aarhus - Oct.1st, 2013.
SCORT/TRB Rail Capacity Workshop - Jacksonville Florida1 1  A Primer on Capacity Principles  New Technologies  Public Sector Needs 22 September
A Joint Research Project funded under the Seventh Framework Programme (FP7) of the European Commission WP 1: Specification and evaluation.
ITIL: Service Transition
Chapter 14 Network Design and Implementation. 2 Network Analysis and Design Aspects of network analysis and design Understanding the requirements for.
Telematics : Where Safety and Productivity Coexist Improving Heavy Vehicle Summit 16 April 2015 Chris Koniditsiotis Chief Executive Officer Transport Certification.
Workshop on Infrastructures Key research to solve mobility barriers Claude Dumoulin Bouygues Travaux Publics (France) reFINE core team Industrial Technologies.
Metro Today, Main Line Tomorrow Malcolm Dobell, Head of Train Systems Kate Whelan, Lead Systems Performance Engineer SUP ATC.
Materials developed by K. Watkins, J. LaMondia and C. Brakewood Rail Capacity Unit 3: Measuring & Maximizing Capacity.
1West of England Area Rail Studies - David Crockett 08/02/2012 West of England Area Rail Studies Outline Summary This presentation summarises the work.
Agenda Overview Why TransCAD Challenges/tips Initiatives Applications.
ARISTOTELION UNIVERSITY OF THESSALONIKI SCHOOL OF TECHNOLOGY FACULTY OF RURAL AND SURVEYING ENGINEERING DEPARTMENT OF TRANSPORTATION AND HYDRAULIC ENGINEERING.
UGDIE PROJECT MEETING Bled September WP6 – Assessment and Evaluation Evaluation Planning  Draft Evaluation plan.
RAILWAY INDUSTRY TRAIN PLANNING LEVEL 2 TRAINING Module 7 Engineering Overview.
EMIS Chapter 6. EMIS Chapter 6 EMIS Chapter 6 Fig 6.2 shows where the SEMP fits into the earliest program stages. Fig 6.5 has an.
Introduction Transportation System Objectives : Military; Knit together the inhabitants of a territory by providing mutual access and communication; Economic.
Capacity for Rail KAJT Dagarna, Dala-Storsund Pavle Kecman - LiU Anders Peterson - LiU Martin Joborn – LiU, SICS Magnus Wahlborg - Trafikverket.
All content in this presentation is protected – © 2008 American Power Conversion Corporation Rael Haiboullin System Engineer Capacity Manager.
1SlideBusiness Modelling Team, Consultancy UK OR in Shell Lauretta Ciuffardi Strategy & Business Modelling Consultancy UK.
RAILWAY INDUSTRY TRAIN PLANNING LEVEL 2 TRAINING Module 2 - Who, What Why?
‘The Application of Systems Engineering’ - Spring Conference 2009 IMPLEMENTING PROGRESSIVE ASSURANCE ON THE EAST LONDON LINE PROJECT – LESSONS LEARNED.
Infrastrucure presentation VZNERRAC PLENARY 11 Railway Infrastructure for the Twenty First Century John Amoore Network Rail and ERRAC.
Overview System modelling and holistic simulation :
Duncan Cross Deputy Director Operations London Overground & Crossrail Crossrail The First Interconnected CBTC Railway in the UK.
RAILWAY INDUSTRY TRAIN PLANNING LEVEL 2 TRAINING Module 9 - The TOCs and Network Rail.
ERTMS state of the art and evolution of the applications considering customer’s orientations.
The variable cost approach to pricing John Thomas Deputy Director, Economic Regulation Office of Rail Regulation, UK 9 July 2004.
ROAD TRANSPORT RESEARCH, TECHNOLOGICAL DEVELOPMENT AND INTEGRATION (2003 Call)
18 September Licensing for Next Generation Signalling Buddhadev Dutta Chowdhury 27 th April 2012.
RAIL TRANSPORT SEMINAR: RAILWAY INFRASTRUCTURE – KEY TO ACHIEVE SUSTAINABLE TRANSPORT Operation on the Bulgarian railway market – current situation and.
Future Road Map – Modern Control, Command Signalling Systems BY Anshul Gupta DRM, Adra, South Eastern Railway Secretary, Institution of Railway Signal.
Action for business, by business Action For Business – Tameside Friday 30 th November 2012.
1 Automotive News - May 20, 2008 Enhancement of Virtual Development in FGA Harald J. Wester Chief Technical Officer Fiat Group.
Indonesian Timetabling Conference Introducing Timetabling and Train Control where there a Multiple Operators 31 May 2011.
1 “Old fashioned” problem solving in a modern railway RSA- 08/01/14 Jo Kaye.
Railway Operations: Issues and Objectives Capacity management Infrastructure planning Timetable preparation Management of day-to-day movement of trains.
Dynamic modelling of steam locomotives using VAMPIre ® Owen Evans, DeltaRail.
Transportation leadership you can trust. presented to Safety Data Analysis Tools Workshop presented by Krista Jeannotte Cambridge Systematics, Inc. March.
Powering Network Rail with the Oracle Business Intelligence Platform
Integrated Corridor Management Initiative Dale Thompson Transportation Specialist Office of Operations R&D May 4, 2005.
I © 2015 Bentley Systems, Incorporated Andrew Smith, Feb 2016 How BIM can positively influence rail O&M.
SCATS Congestion Improvement Program. The Scope of the SCATS Congestion Improvement Program.
DESTination RAIL Decision Support Tool for Rail Infrastructure EU Project No Railway Pro Investment Summit Building the New CEE Railway Economy.
ERTMS Strategy Group Agenda Item 3 – Key Strategic Issues 11 th April th April 2006.
UNIT IV TRACK CONSTRUCTION. POINTS AND CROSSINGS Point and Crossings are peculiar arrangement used in permanent way to guide the vehicle for directional.
Transportation leadership you can trust. presented to Third International Conference on Innovations in Travel Modeling presented by Thomas Rossi Cambridge.
HIGH SPEED RAIL ASSESSMENT NORGE
Provisional view of the Procurement Strategy Phil Bennett Commercial Director.
Freight Railway Integration Strategy For Inter-American Development Bank Transport Week 2009 by Transportation Technology Center, Inc. (TTCI) Subsidiary.
A-DOUBLE PRESENTATION Freight Council 31 March 2016.
ME Summer 2013 Systems Engineering, Part II Session July 2013 Mr. Larry Hopp, CPL.
// Eating the Elephant ETCS Requirements for GB railway.
1 Address: UIC Safety Database (SDB) System and Results.
Road Investment Decision Framework
Infrastructure Part 3. Signalling 2 What the TSIs mean…  The on-board system is tightly defined – it has to be able to go anywhere,  The trackside.
Constraints Space Load Capacity Costs Operating hours.
Public Conference December
Cambrian Lessons Learnt
1st November, 2016 Transport Modelling – Developing a better understanding of Short Lived Events Marcel Pooke – Operational Modelling & Visualisation Manager.
Transportation and Traffic Engineering Ch 1 Introduction 10/10/2017
Digital Gauging Colin Johnson Managing Director DGauge Ltd.
EMIS 7307 Chapter 6.
Network Rail - Asset Management Story & Reliability Improvements
Matteo Merialdo RHEA Group Innovative aspects in cyber range solutions.
Life Cycle Costing.
Presentation transcript:

1 Developing the MBSE Approach Tony Ramanathan Principal Engineer Network Rail

2 The Railway System Investment Governance GRIP Asst Life Models / Analysis used Interface Management – why we need Modelling Modelling Tools Design Handbook inc the Building Blocks Agenda

3 The people, The process applied, The systems used

4 Project Governance - GRIP “Project Life-Cycle” Governance for Railway Investment Projects (GRIP) There are Eight GRIP Stages A RUS scheme is outside of Project Governance and is between 5 to 7 years prior to GRIP 1 Pre-GRIP

5 System Capability Layout Capacity Signalling Capacity Electrification Capacity Infrastructure Loading Life Cycle Costs System Reliability Timetable Robustness Safety Risk Passenger Demand Analyses Used in Systems Engineering

6 Asset Life

7 Interface Management - train infrastructure interfaces OLE Contact Traction Power EMC Platform Occupation/ Dwell Times Platform Length/SDO Stepping Distance Station/ DDA Compliance Wheel/ Rail Interface Axle Load Route availability (RA) / Allowable Speeds Train Detection Track Conditions Track Design/Quality Drainage Tonnage passing (load) Gauging Clearance Kinematic Envelope (KE) Customer Information Systems (CIS) Lineside Infrastructure Signalling & Telecoms Passengers behaviour

Modelling Tools Systems Analysis Section number to go here

9 VTSIM Models often consider differing Time Horizons Spatial Representation * Analysis Time Horizon MinsHoursDaysPeriodsYearsMulti Years EMI RailSys Pedflow OSLO ICM Scheme level Route level Full UK CUI Asset level TRAIL SPA * Spatial representation within a single model

10 SA Approach towards Option Selection Option 1 Capability : Capacity Journey Times Power Reliability Maintenance Construction Whole life cost Option X Capability: Capacity Journey Times Power Reliability Maintenance Construction Whole life cost ‘Favoured Option’ Option Capability: Capacity Journey Times Power Reliability Maintenance Construction Whole life cost Option Selection SPA RailSys TRAIL TIP OSLO LCC Legion Option 1 Capability : Capacity Journey Times Power Reliability Maintenance Construction Whole life cost Option X Capability : Capacity Journey Times Power Reliability Maintenance Construction Whole life cost Requirements & Option Validation: Ops & Perf. Engineering Eng Policy Feasibility Systems Capability Modelling Preliminary Assessment ? ? ? Option 2 Capability: Capacity Journey Times Power Reliability Maintenance Construction Whole life cost ? ?

11 Typical System Breakdown Structure (SBS)

12 TRAIL (Transportation Reliability, Availability and Integrated Logistics) Infrastructure TRAIL discrete event simulator OperationsRolling stockTimetable Lateness Analysis Delay Analysis PPM Infrastructure Performance Operations Performance

13 What about RailSys? RailSys is used to provide the ‘operations tick in the box’ for any scheme Provides a very powerful visualisation of a timetable Can be used to identify detailed train path routeing and permits detailed event scenario modelling It does not do PPM Of note for engineers; the complexity within the model can vary (even if the model is compliant to NR Opns Build Ver6) Simple models are normally optimistic trains may exhibit movement behaviour which the driver / signaller might not be able to emulate in real life

14 Capacity Modelling Existing Layout Proposed Layout Thameslink KO2 – The need for ATO Crossrail – Scheme Performance Assessment ERTMS – Braking Curve Reading – Capacity Utilisation Index

Date Presentation title to go here15 SPA Process

16 Key contacts Specialist within Network Rail Nigel Best – TRAIL, RAILSYS, RAM, FMECA Clare Waller – Timetable Maya Petkova – EMC Mark Burstow – Wheel / rail dynamics Caroline Lowe – Climate + Asset specialist Gauging Power Signalling Telecoms Level Crossings

17 The people, The process applied, The systems used Section 1 What is SE Section 2 Intro to SE Teams Section 3 GRIP, P Approval & Acceptance Section 4 System Integration Section 5 Building Blocks Section 6 Requirements System Design Handbook Links work only in Presentation Mode

18 PSE – Building Blocks (guidance) (Links work in Presentation Mode) Junction Evaluation Junction Evaluation + PresentationPresentation Terminal Stations Line Speed & Journey Time Improvements Line Speed & Journey Time Improvements + Presentation Presentation Consideration for Gradients / Curves Gradients / Curves + Presentation Presentation Layout Development Workshops PRS user guide Light RailLight Rail + PresentationPresentation Rail Maintenance Depots Introduction to Building Blocks PSE Schemes Resource estimating Route Integration Application of Standard Designs System Capability Layout Capacity Signalling Capacity Electrification Capacity System Maintenance Life Cycle Cost System Reliability Timetable Robustness System Safety Passenger Capacity Undertaking a Pre Grip Evaluation Freight Distribution Depots Main Line Stabling Sidings Generic Train Infrastructure Interface Specification Interface Specification + Presentation Introduction To Station Design Equality Act 2002 (DDA)

19 Typical System Level Railway Functional Block Diagram (FBD)

20 DESIGN for RELIABILITY Modify System Configuration Use alternative Asset types Control Key Processes Introduce Condition Monitoring Enhance Maintenance Improve Operational Plans DESIGN for RELIABILITY Modify System Configuration Use alternative Asset types Control Key Processes Introduce Condition Monitoring Enhance Maintenance Improve Operational Plans System Diagrams FMS / TRUST Data Reliability Data Hdbk Route FMECA (Tech. & Ops) Design for Reliability Cause & Effect Workshops: Engineering Maintenance Operations TRAIL Model: Options Evaluation