1 © 2013 Westinghouse Electric Company LLC. All Rights Reserved Westinghouse Non-Proprietary Class 3 David Cliff UK Licensing Manager AP1000 Westinghouse.

Slides:



Advertisements
Similar presentations
1 Proprietary and Confidential New Jersey Clean Air Council Public Hearing April 1, 2009 Jeff Halfinger Babcock & Wilcox.
Advertisements

Region II WIN Feb © 2011 Babcock & Wilcox Nuclear Energy, Inc. All rights reserved. A practical, scalable, modular ALWR.
Generic Pressurized Water Reactor (PWR): Safety Systems Overview
Idaho National Engineering and Environmental Laboratory SCWR Preliminary Safety Considerations Cliff Davis, Jacopo Buongiorno, INEEL Luca Oriani, Westinghouse.
Carbon Reduction Commitment AEA is the Government adviser contracted to develop the CRC scheme Stephen Boyle, Principal Consultant, Climate Change and.
5th Nuclear Energy Conclave, New-Delhi, Sep. 6th 2013 / AREVA Safety Programs p.1.
Vermont Yankee Presentation to VSNAP 7/17/13 VY/Entergy Fukushima Response Update Bernard Buteau.
Slide 1 Doc.ppt 0144 NEW NUCLEAR POWER Ed Cummins Westinghouse Electric Company June 29, 2006.
The 2002 Davis Besse Event and Safety Culture Policy at the U.S. Nuclear Regulatory Commission Stephanie Morrow, Ph.D. Safety Culture Program Manager Office.
Acumen7 1 Accelerating UK Nuclear New Build Tony Roulstone July 2006.
LFR plant assessment against a Fukushima-like scenario Technical Workshop to Review Safety and Design Aspects of European LFR Demonstrator (ALFRED), European.
INSAG DEVELOPMENT OF A DOCUMENT ON HIGH LEVEL SAFETY RECOMMENDATIONS FOR NUCLEAR POWER Milestone Issues: Group C. Nuclear Safety. A. Alonso (INSAG Member)
EUROTRANS - Helium cooled EFIT Probabilistic assessment of different DHR designs Karlsruhe, November Sophie EHSTER, Laurent VINCON.
Month Year Working together to achieve your desired outcomes, by delivering service excellence. Building Engineering Solutions for the optimisation of.
ONR Presentation to NuLeAF Tanya MacLeod. Responsibilities Prime responsibility for the assessment and management of Flood and Coastal Risk on site rests.
MPMP Power Supply 1 Nuclear Power Update for The Society of American Military Engineers September 15, 2010.
BNFL/Westinghouse’s Perspective on the Nuclear Hydrogen Economy Dr PJA Howarth Head of Group Science Strategy.
ANSI-NIST Nuclear Energy Standards Coordination Collaborative Larry Burkhart, Chief, AP1000 Projects Branch (LB4) Division of New Reactor Licensing NRC’s.
Westinghouse Non-Proprietary Class 3© 2013 Westinghouse Electric Company LLC. All Rights Reserved. 1 October 2013 Westinghouse Overview and AP1000 ® Plant.
Overview of Conventional 2-loop PWR Simulator. PCTRAN Dr
The New Reactor Program Process, Progress, and Plans (And a Peek Over the Horizon) December 2, 2009 David B. Matthews, Director Division of New Reactor.
Nuclear Power Plant/Electric Grid Regulatory Coordination and Cooperation - ERO Perspective David R. Nevius and Michael J. Assante 2009 NRC Regulatory.
A Proposed Risk Management Regulatory Framework Commissioner George Apostolakis Presented at the Organization of Agreement States 2012 Annual Meeting Milwaukee,
Westinghouse Non-Proprietary Class 3© 2014 Westinghouse Electric Company LLC. All Rights Reserved. 1 Attie Ferreira & Prof. Itumeleng Mosala Westinghouse.
Westinghouse Operational Experience and Prospects for New Build
What about Japan?. Unit 1 Unit 2 Unit 3 Unit 4 Unit 5 Unit 6.
Tom MAZOUR IAEA, Division of Nuclear Power
Nuclear Power Plant New Build Activity: A Market Overview
UC Berkeley Per F. Peterson Professor Department of Nuclear Engineering University of California, Berkeley California Science Center February 23, 2008.
08 October 2015 M. Ammar Mehdi Introduction to Human Resource Management & SSG-16 Actions 4 th Steering Committee on Competence of Human.
1 © 2012 Westinghouse Electric Company LLC. All Rights Reserved.Westinghouse Proprietary Class 3 The Incorporation of the Utilities Input into the Design.
NMMSS Users Meeting Las Vegas, NV May 20, 2010 Status of the U.S. Nuclear Regulatory Commission’s Implementation of the U.S./IAEA Additional Protocol.
Atoms for Peace +50 Andy White – President & CEO, GE Nuclear Energy.
Nuclear Thermal Hydraulic System Experiment
IAEA International Atomic Energy Agency. IAEA Outline Learning Objectives Introduction IRRS review of regulations and guides Relevant safety standards.
1 BULATOM - New Build prospects in the UK New Build prospects in the UK International Nuclear Forum Bulgarian Nuclear Energy – National, Regional and World.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/1 Design Geoff Vaughan University of Central Lancashire,
TACIS Project: R8.01/98 – TRANSLATION, EDITING AND DIFFUSION OF DOCUMENTS (Result Dissemination) Probabilistic Safety Analysis Technology (PSA) TACIS R3.1/91.
Ontario Region First Nation Water & Wastewater Action Plan Presentation on March 9, 2010 Niagara Falls, Ontario INAC Ontario Region.
© 2012 Rolls-Royce plc The information in this document is the property of Rolls-Royce plc and may not be copied or communicated to a third party, or used.
New Reactors: Licensing Basis and Configuration Mgmt Challenges June 22, 2010 David B. Matthews Director Division of New Reactor Licensing Office of New.
ANSI-NIST Nuclear Energy Standards Coordination Collaborative David Matthews, Director, Division of New Reactor Licensing Larry Burkhart, Chief, AP1000.
1 Impact of Revised 10 CFR 50.46(b) ECCS Acceptance Criteria 2009 Regulatory Information Conference Rockville, MD March 12, 2009 Mitch Nissley Westinghouse.
International Atomic Energy Agency 1 Grid, Industrial involvement and procurement Akira OMOTO DIR, NENP.
Westinghouse Non-Proprietary Class 3© 2015 Westinghouse Electric Company LLC. All Rights Reserved. 1 Graham Cable Vice President, New Plant Development.
Natural Convection as a Passive Safety Design in Nuclear Reactors
Adding Nuclear Power to the Grid ASQ Energy and Environmental Conference August 28, 2006.
I & C.
Sustainability of Technical and Scientific Expertise Don Macnab Australian Radiation Protection and Nuclear Safety Agency.
IAEA International Atomic Energy Agency TM/WS TOPICAL ISSUES ON INFRASTRUCTURE DEVELOPMENT: MANAGING THE DEVELOPMENT OF NATIONAL INFRASTRUCTURE FOR NUCLEAR.
MEHB 513 Introduction on nuclear technology assignment GROUP MEMBERS:ID: SEEH CHONG CHIN ME YEE QIAN WAHME TING DING PINGME LIM JIA YINGME
Standards Certification Education & Training Publishing Conferences & Exhibits ISA Division Symposia and Technical Conferences.
1 Nuclear Power Technology Development Westinghouse View Kiev March 2012 Dr. Nick Shulyak AP1000® is a registered trademark in the United States of Westinghouse.
Enhancing Safety at America’s Nuclear Energy Facilities U.S. Industry’s Fukushima Response Joseph Pollock, Nuclear Energy Institute Christopher H. Mudrick,
REPUBLIC OF SLOVENIA MINISTRY OF AGRICULTURE AND THE ENVIRONMENT SLOVENIAN NUCLEAR SAFETY ADMINISTRATION 1 Regulatory Information Conference 2014 Regulatory.
New Plant Regulatory Issues Kati Austgen Washington International Representatives Meeting July 12, 2012.
EFCOG STARTUP AND COMMISSIONING TASK TEAM INTRODUCTION
AN INTEGRAL PWR, “CAREM”, IS BEING DEVELOPED BY CNEA, ARGENTINA
János Krutzler Hungarian Atomic Energy Authority
Collaborative Research in
Pressurized Water Reactor Owners Group
Nuclear Power Update for The Society of American Military Engineers
Plant Vogtle Units 3 and 4 Alex Thirkell.
NEI Perspectives on Small Modular Reactors
PRESENTATION OUTLINE Introduction and Background
Multinational Design Evaluation Programme: 10 year-achievements ID111
Session Name: Lessons Learned from Mega Projects
Pressurized Water Reactor Owners Group
BASIC PROFESSIONAL TRAINING COURSE Module VII Probabilistic Safety Assessment Case Studies Version 1.0, July 2015 This material was prepared.
THE ROLE OF PASSIVE SYSTEMS IN ENHANCING SAFETY AND PREVENTING ACCIDENTS IN ADVANCED REACTORS Moustafa Aziz Nuclear and Radiological Regulatory Authority.
Presentation transcript:

1 © 2013 Westinghouse Electric Company LLC. All Rights Reserved Westinghouse Non-Proprietary Class 3 David Cliff UK Licensing Manager AP1000 Westinghouse UK UK Safety Case for the AP1000 ® PWR AP1000 is a trademark or registered trademark of Westinghouse Electric Company LLC, its affiliates and/or its subsidiaries in the United States of America and may be registered in other countries throughout the world. All rights reserved. Unauthorized use is strictly prohibited. Other names may be trademarks of their respective owners.

2 © 2013 Westinghouse Electric Company LLC. All Rights Reserved Westinghouse Non-Proprietary Class 3 UK GDA: Background and ProcessAP1000 GDA Safety CaseLessons learned UK Safety Case for the AP1000 ® Plant Agenda

3 © 2013 Westinghouse Electric Company LLC. All Rights Reserved Westinghouse Non-Proprietary Class 3 UK Safety Case for the AP1000 ® Plant Background to GDA Funded Decommissioning ProgrammeRegulatory JustificationGeneric Design AssessmentNational Policy StatementInfrastructure Planning

4 © 2013 Westinghouse Electric Company LLC. All Rights Reserved Westinghouse Non-Proprietary Class 3 UK Safety Case for the AP1000 ® Plant GDA Process Phase 1 Generic Design Assessment Step 1 Process Step 2 “Claims” Step 3 “Arguments” Step 4 “Evidence” Phase 2 Site Licensing Site Specific and Operational Issues

5 © 2013 Westinghouse Electric Company LLC. All Rights Reserved Westinghouse Non-Proprietary Class 3 UK GDA: Background and ProcessAP1000 GDA Safety CaseLessons learned UK Safety Case for the AP1000 ® Plant Agenda

6 © 2013 Westinghouse Electric Company LLC. All Rights Reserved Westinghouse Non-Proprietary Class 3 UK Safety Case for the AP1000 ® Plant Options to Achieve Low Core Damage Frequency? 4 Train Safety Injection 4 Train Decay Heat Removal 4 Train Containment Cooling 4 Train Residual Heat Removal 4 Train Diesel Generators Evolutionary plants achieve goals by adding redundant safety features Increased complexity Increased capital Increased O&M cost Leads to:

7 © 2013 Westinghouse Electric Company LLC. All Rights Reserved Westinghouse Non-Proprietary Class 3 UK Safety Case for the AP1000 ® Plant Options to Achieve Low Core Damage Frequency? natural circulation of air, water and steam gravity and gas pressure drive the flow of cooling water natural heat transfer occurs through conduction, convection and evaporation Passive Plants achieve goals by using naturally occurring physical phenomena such as: A few battery powered valves align the passive safety systems upon actuation signals Reactor safety functions are achieved without AC power

8 © 2013 Westinghouse Electric Company LLC. All Rights Reserved Westinghouse Non-Proprietary Class 3 UK Safety Case for the AP1000 ® Plant Passive Core Cooling System

9 © 2013 Westinghouse Electric Company LLC. All Rights Reserved Westinghouse Non-Proprietary Class 3 1 x x <1 x x U. S. NRC Requirements Current Plants Utility Requirements AP1000 UK Safety Case for the AP1000 ® Plant Core Damage Frequency – All Events

10 © 2013 Westinghouse Electric Company LLC. All Rights Reserved Westinghouse Non-Proprietary Class 3 PowerConcrete, m3Rebar, MT Sizewell B1188 MWe520,00065,000 AP MWe< 100,000< 12,000 UK Safety Case for the AP1000 ® Plant Impact of Passive Systems - Layout

11 © 2013 Westinghouse Electric Company LLC. All Rights Reserved Westinghouse Non-Proprietary Class 3 UK Safety Case for the AP1000 ® Plant US & UK Regulatory Approach

12 © 2013 Westinghouse Electric Company LLC. All Rights Reserved Westinghouse Non-Proprietary Class 3 UK Safety Case for the AP1000 ® Plant US & UK Regulatory Approach Challenge is to maintain benefits of AP1000 “standard plant” approach

13 © 2013 Westinghouse Electric Company LLC. All Rights Reserved Westinghouse Non-Proprietary Class 3 UK Safety Case for the AP1000 ® Plant AP1000 UK Safety Categorisation & Classification

14 © 2013 Westinghouse Electric Company LLC. All Rights Reserved Westinghouse Non-Proprietary Class 3 UK Safety Case for the AP1000 ® Safety Submission Delivery Pre-Construction Safety Report Revision 0 UK AP1000 Environment Report UKP-GW-GL- 790, Revision 4 Pre-Construction Environment Report Revision 4 Plant Life Cycle Safety Report UKP-GW-GL- 737, Revision 2 Plant Life Cycle Safety Report Revision 2 Design Reference Point Revision 3 The Master Submission List UKP-GW-GLX-001 Revision 0 Roadmap of the UK Generic Design Assessment of the European AP1000 Design April 2011

15 © 2013 Westinghouse Electric Company LLC. All Rights Reserved Westinghouse Non-Proprietary Class 3 UK Safety Case for the AP1000 ® Plant GDA Issues “We have committed to consider the adequacy of these Resolution Plans, and if we judge them to be credible, we will publish them and provide an interim Design Acceptance Confirmation (DAC) and interim Statement of Design Acceptability (SoDA) by the end of 2011” - ONR Quarterly Report July 2011

16 © 2013 Westinghouse Electric Company LLC. All Rights Reserved Westinghouse Non-Proprietary Class 3 UK Safety Case for the AP1000 ® Plant iDAC iSoDA On Wednesday 14 th December 2011 the Office for Nuclear Regulation and the Environment agency awarded Westinghouse UK with interim Design Acceptance Confirmation (iDAC) and interim Statement of Design Acceptability (iSoDA) certificates respectively.

17 © 2013 Westinghouse Electric Company LLC. All Rights Reserved Westinghouse Non-Proprietary Class 3 UK GDA: Background and ProcessAP1000 GDA Safety CaseLessons learned UK Safety Case for the AP1000 ® Plant Agenda

18 © 2013 Westinghouse Electric Company LLC. All Rights Reserved Westinghouse Non-Proprietary Class 3 UK Safety Case for the AP1000 ® Plant Lessons Learned Strategy Safe Secure Robust DAC/SoDA Structure Multi Party Agreement Joint Programme Office Process Programme Management Regulator Nuclear Interface Protocol 3 way communication People Technical experts Project managers US, European resources Measures Quarterly Reporting Metrics

19 © 2013 Westinghouse Electric Company LLC. All Rights Reserved Westinghouse Non-Proprietary Class 3 UK Safety Case for the AP1000 ® Plant From Design to Reality Sanmen Unit 1 1st Concrete Pour, March 31, 2009

20 © 2013 Westinghouse Electric Company LLC. All Rights Reserved Westinghouse Non-Proprietary Class 3 UK Safety Case for the AP1000 ® Plant From Design to Reality Sanmen Site Spring 2013

21 © 2013 Westinghouse Electric Company LLC. All Rights Reserved Westinghouse Non-Proprietary Class 3 Thank you