DRIE equipment purchase Final steps Mikko Kataja, Ville Liimatainen, Mohammadrez Soleymaniha, Sasha Hoshian.

Slides:



Advertisements
Similar presentations
____ __ ____ _____ ____ ______ _____ _____ ____ _____ _____ _____ ____ _____ Click to edit Master text styles Second level Third level Fourth level Fifth.
Advertisements

Is a Contract Necessary? Step 7Step 6Step 5Step 4Step 3Step 2Step 1 Goods or Services? Finished (ready- made) Goods Contract is Needed Any Complex Delivery,
Al-Azawi, Anas Fahad Berdova, Maria Jannatul, Susoma Mutanen, Ilkka Key Issues In Purchasing DRIE system.
Electronic Systems Support LV PS Procurement - Status February 28, 2005.
Al-Azawi, Anas Fahad Berdova, Maria Jannatul, Susoma Mutanen, Ilkka Key Issues In Purchasing DRIE system.
EQUIPMENT VALIDATION.
1 Conference Call December 7 th h 30 Agenda 1.Concerns on wording and inclusion of glossary of terms; 2.Issues: 3.Scope of RFP equipment required;
IT Services Centrally Funded Workstations
1 E-Procurement in Azerbaijan Republic Challenges and perspectives Elshad Samedzade, PHD & Arzu Aliyev
Procurement Procedure and Preparation of Procurement Plan with reference to Karnataka.
Process Engineer’s Role in Project Management Dr Abdullah Malik.
REPUBLIC OF ALBANIA PUBLIC PROCUREMENT AGENCY 9th Public Procurement Knowledge Exchange Platform May, 28-31, 2013 Skopje
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
Vendor management. What is vendor management? Everything that happens after the vendor starts delivering the equipments and other high value items purchased.
ACTION PLAN LIN ASSISTANT ENGINEER KUNMING-CHINA.
Introduction to Business Organisations
Equality Purchase Cycle Produce Spec Evaluate Quotes / Tenders Vendor Selection Issue RFQ/T Requirement to Purchase Negotiate Vendor Paid Place / Award.
© 2010 Chevron A Day in the Life of a Project Manager Presented by Nancy Grossman, Project Manager Presented to Chabot College Engineering Class September.
From Research Prototype to Production
ISO OPERATIONAL CONTROL
Projects and procurement (lecture). Procurement Acquiring hardware, software, materials, services, spare parts, skills, workforce etc. which are necessary.
EARTO – working group on quality issues – 2 nd session Anneli Karttunen, Quality Manager VTT Technical Research Centre of Finland This presentation.
EU TWINNING PROGRAM “SUPPORT TO THE PARLIAMENT OF THE REPUBLIC OF MOLDOVA” Mrs. Eszter Kertészné Gérecz Head of IT Department
EU-TURKEY CHAMBER FORUM PROJECT (ETCF) ETCF is funded by the European Union. 1 EU-TURKEY CHAMBER FORUM EU TURKEY CHAMBERS PARTNERSHİP GRANT SCHEME PROCUREMENT.
1 Cooperative ___Agreements___ __or__ Leveraged Purchasing Agreements (LPA)
Understanding Procurement 1. Procurement Policy Need to set up guidelines & policy Need to set up procurement committee; this should include a cross-section.
© JANET(UK) 2011 SWERN JANET South West Procurement & Transition Neil Shewry Project Manager JANET(UK) 1.
Contract Training Class I
System Selection Dania Bilal IS 592 Spring The Selection Process Review the literature Read the Automated System Marketplace survey for the last.
Mr. Thilak de Silva. BSc. Eng., MSc, CEng, FIE(SL), FIET(UK), CITP(UK), MBCS(UK), MIEEE (USA) M.Sc. in IT - Year 1 Semester II
Validation | Slide 1 of 27 August 2006 Validation Supplementary Training Modules on Good Manufacturing Practice WHO Technical Report Series, No. 937, 2006.
Asset Based Finance Case Studies 1. Scenario Company has decided to deploy a new software application (CRM, ERP, FINANCE, etc…) required to improve productivity,
Diploma in Procurement & Supply Business needs in Procurement & Supply Session 1 Business Needs and Procurement Decisions.
Sydney (02) Melbourne (03) Brisbane (07) Carlo Biaro Capital Insight Conference 2013 – Tools and.
Initiating Equipment PRs using ERP Process & Common Mistakes Dr. Khaled Al-Athel Director, Lab Technical Support Office.
System Selection Dania Bilal IS 582 Spring System Selection Business Selection of system project to develop or enhance Libraries & other information.
T. KurtykaLinac4 meeting 12 March 2009 Guidelines from the sLHC Specification Committee 1). sLHC Specification Committee 2). Schedule of tenders for Linac4.
SAFETY SERVICES PROVISION I. Bejar Alonso. Transfer Executive Safety Tasks from SC to Departments In application of the document “Safety policy at CERN”
Purchasing supplies at CERN Procurement Rules Someone FP-PI.
Submitting a Responsive Response Packet & Bid Waste Water and Water Treatment Chemicals ITB# CWCH.
Framework Consultants Presentation Judith Chivers Estates and Capital Developments.
Avoiding Unauthorized Purchases An unauthorized purchase is a purchase committing agency funds without prior approval. Training provided by Texas Juvenile.
Network Services: RM1045 Procurement Process
ENGINEERING SUPPORT FOR FINAL YEAR PROJECT STUDENTS. SCHOOL OF ENGINEERING.
Welcome. Contents: 1.Organization’s Policies & Procedure 2.Internal Controls 3.Manager’s Financial Role 4.Procurement Process 5.Monthly Financial Report.
Contract management 1. Acquiring software from external supplier This could be: a bespoke system - created specially for the customer off-the-shelf -
Component D: Activity D.3: Surveys Department EU Twinning Project.
Software sales at U Waterloo Successfully moved software sales online Handle purchases from university accounts Integrated with our Active Directory and.
Financial System Upgrade Agency Change Champion Deployment Session March 16 th, 2006.
Fallon Health Mass Collaborative Provider Credentialing Symposium April 27, 2016.
March 2013 CPO Training Jan Hall, Contracts Manager.
1 Determining a client’s peripheral requirements  Determine current business practices  Determine peripheral requirements  Analyse and document existing.
ADMINISTRATIVE STRUCTURE OF A COMPUTER CENTRE. The administrative structure is being organized in such a way that a skilled professional personnel is.
Equipment and technological processes for manufacturing GaAs MMICs THE PRACTICALITIES OF BUYING AND USING PROCESSING EQUIPMENT TALK 15 1.
Central Procurement Directorate (CPD)
Agenda Item 2: Catch up session 15 May 2017
World Health Organization
Contract Award Procedures
Direct award of contract for goods and services
MARKETING, PURCHASING AND PRODUCTION (7 - 9%)
Direct award of contract for goods and services
Purchasing cycle Purchase request
Projects and procurement
Purchasing daily office supplies process
Projects and procurement
TIMELINE FOR IIIB LOCOMOTIVE DEVELOPMENT
Annex A1.6.2b RU access to OBI RNE General Assembly 16 May 2018.
East Hall under construction
Accomplished Recommendation Planned Actions for Control
Presentation transcript:

DRIE equipment purchase Final steps Mikko Kataja, Ville Liimatainen, Mohammadrez Soleymaniha, Sasha Hoshian

Ground workSpecifications Call for tenders Review offers Write contract Receive the device Everyday use Timeline for DRIE equipment purchase 2-3 months6-8 weeks1 week1 weeks 3 months or more Years1-2 weeks February March April May June 2013

Key people in the final steps Person in charge of the purchase (PiC) – could be head of dept, or one of the professors Main users – PhD students or Postdoc researchers Micronova director and secretary – Veli-Matti Airaksinen Head of department

Evaluation of the offers Evaluation criteria has been decided before the call for tenders – Decision has to be made according to the published criteria or the rejected suppliers can (and probably will) file a complaint – Price is most likely the most important criterion as long as the technical requirements are met If no supplier is able to meet the requirements, we can contact the suppliers directly to make a direct purchase. Evaluation of the offers should be done by the person(s) in charge and approved by legal department.

Contract Contact the Head of Procurement at Aalto Finance services (Antti Laakso) – Should already have been in contact during the tendering – Ask for a contract draft for the DRIE purchase Contact the lawyer at respective school (e.g. Anna Huuskonen for ELEC) – Will check the contract for any legal issues Contact the person who is authorized to sign the contract – If the contract is the result of a tendering process, the Dean can sign (e.g. Tuija Pulkkinen for ELEC) – If it’s a direct purchase, the Dean can still sign, but further approvals by the President of Aalto University (Tuula Teeri) and the Chief Financial Officer (Marianna Bom) are needed Contact the company representative for their signature

Receiving the machine Delivery Where the machine should be delivered? ̶Micronova building in Aalto preferably at the installation site Who is in charge from Aalto side to sign the delivery factor? ̶Secretary of Micronova or head of the department Sami Franssila Installation Installation should be done by engineers from the company but before that the site should be prepared ̶Piping and gasing system ( Micronova engineers will be responsible) ̶Cleaning up the location ̶Exhaust ̶Electrical connections (Veli-Matti or Micronova staff will contact an electrician) Who should be present at the installation date? ̶Director, Aalto Nanofab, Veli-Matti Airaksinen ̶Head of department, Sami Franssila ̶Main users of the machine (PhD students or engineers from Aalto)

Acceptance tests Safety – Leak test (Company engineers, Micronova staff) Technical requirements – Etch rate – Aspect ratio Test samples are needed to verify (fabricated by the main users that are also trained to use the machine) For both etch rate and aspect ratio a TEM can be used. The PiC finds someone who can prepare the samples and do the TEM measurements. – Calibration Other equipment – Pumps, cooling system, software – Will be tested during test sample fabrication

Everyday use Instructions and safety signs – Identify right places to put warning banners and instructions location: main user – Who is responsible for making instruction(English, Finnish): main user Training of new users – New users: Master degree students or Micronova’s staff – Should be performed by Main users( PhD students) Upkeep – Every user has to clean up after their use – Cleaning, changing gas and waste: To be performed by main users – Main users check the equipment according to the manufacturers specifications – Additional maintenance by the manufacturer (PiC) Booking and logging systems – Booking: LIMS – Micronova staff will add new equipment to LIMS, main users will take care of adding new users – Logging: PESO Troubleshooting – First step: Main users – Second step: company troubleshooting service( e.g. remote troubleshooting)