DISPLAY FIREWORKS FORUM February 23, 2012 1. Display Fireworks Program Three components: 1.Annual factory audits 2.On-site product evaluations 3.Container.

Slides:



Advertisements
Similar presentations
WAREHOUSING MANAGEMENT
Advertisements

WAREHOUSING MANAGEMENT
General Permit for Low Hazard Potential Impounding Structures By Robert J. VanLier, P.E. Regional Dam Safety Engineer 900 Natural Resources Drive, Charlottesville,
STEP 1 ARRIVAL OF MERCHANDISE AND DOCUMENTATION The merchandise arrives at the broker's terminal on the U.S. side of the border. The commercial invoice.
EXPORT CERTIFICATES IN GLOBAL FOOD TRADE Mr. Bi Kexin AQSIQ
SERVICE LEVEL AGREEMENTS The Technical Contract Within the Master Agreement.
MODULE B - PROCESS B1. ASME Organizational Structure B2. Standards Development: Staff and Volunteer Roles and Responsibilities B3. Conformity Assessment:
More CMM Part Two : Details.
CONDOMS A series of presentations developed by TGPSH/GTZ and PSI-TANZANIA.
Intermediate SFFMA Objectives: – Hrs received.
3.2.5 Student Book © 2004 Propane Education & Research CouncilPage Identifying Procedures for Requalifying DOT Cylinders by CGA External Visual.
[INSERT APPLICABLE REGIONAL ENTITY NAME/LOGO] [ENTITY NAME] [FUNCTION CERTIFYING] Certification [LOCATION] – [DATES OF ON-SITE VISIT] [Presenter Name,
3.6.2 Student Book © 2004 Propane Education & Research CouncilPage 1 Many propane marketers receive railcar bulk propane shipments. Well-trained personnel.
1 OSHA FEDERAL OCCUPATIONAL SAFETY AND HEALTH ACT (OSHA) OF 1970 George Mason University College of Nursing and Health Science Regulatory Requirements.
Departmental Petty Cash Funds Boston University Medical Campus Revised 9/09.
Crane Operations Objective
AFSL SHIPPERS MEETING April 18, Joe Romeo – Global Key Account Manager Rex Liu – QIP Project Manager 2.
South Carolina Farm Auditing Program Good Agricultural Practices and Good Handling Practices Audit Verification Program Jack Dantzler Director of Inspections.
Wing Banker Program. In the Beginning… CAP has never received an Unqualified Audit Opinion because the funds at the unit level are not audited The NEC.
Quality Assurance/Quality Control Policy
FPSC Safety, LLC ISO AUDIT.
Hallmark Certification. Agenda Ten Year Certification  Term of Certification Background 1.4 year term of certification 2. 8 year term of certification.
Proposed Rules to Help Ensure the Safety of Imported Food 1.
8 th Annual Managers’ and Law Enforcement Seminar IFTA Funds Netting Information.
DISPLAY FIREWORKS SEMINAR November 11, Stack Test Requirement Shipping cartons stacked to a minimum height of 3 meter (10 feet) must remain.
■ This Training Module is designed to educate Management on FMCSA Compliance Review (CR).
Inspection Issues in the Analytical Laboratory: An FDA Perspective Yvonne McKnight Chemist US Food and Drug AdministrationPhone: x
[INSERT APPLICABLE REGIONAL ENTITY NAME/LOGO] [ENTITY NAME] [FUNCTION CERTIFYING] Certification Review for [RELATED ENTITIES] [LOCATION] – [DATES OF ON-SITE.
From Research Prototype to Production
The Board of Directors Corporate Governance Chapter 4.
DISPLAY FIREWORKS SEMINAR PARIS LAS VEGAS HOTEL February 21,
HIGHLIGHTS OF THE NAPHSIS SECURITY GUIDELINES MANUAL
Money Handling Procedures Updated by Roger Sparrow, Karen Ramage & David Herbst April 2014.
Kathy Alexander, Ph.D. Technical Specialist Water Availability Division Texas Commission on Environmental Quality.
DISPLAY FIREWORKS SEMINAR September 15, Opening Remarks John Rogers 2.
Georgia Tech Safety and Health Consultation Program
BCGWA Ground Water Protection Regulation Workshops 2005 BCGWA Conference Penticton, B.C. March 3-4, 2005 Gilles Wendling Kaya Forest.
1 DPCP Internal Auditor Basic Training Internal Audit Procedures.
Aloe Vera of America: A Quality IASC-Certified Producer of Aloe Vera Presented by Walt Jones.
Moveable Equipment Inventory Brown Bag February 11, 2009 Bob Marchitto Manager, Moveable Equipment Inventory ,
Test Chair 101: Guidelines and Tips for New Test Chairpersons Wanda L. Cunningham 1.
San Marino Unified School District Contracts Presentation Presented by: Wesley Lee, Budget Analyst October 28, 2015.
AFSL General Membership Meeting September
PRESENTATION TITLE Presented by: Name Surname Directorate Date Briefing Session: W 1078 WTE APPOINTMENT OF A PROFESSIONAL SERVICE PROVIDER FORTHE MANAGING.
COMPULSORY BRIEFING SESSION Enterprise Wireless Solution (Wi-Fi) RAF /2015/00022 Date: 18 January 2016 Time: 11:00.
CABLING SYSTEM WARRANTY REGISTRATION. PURPOSE OF CABLING REGISTRATION.
UnionPay Card Manufacturer Certification Introduction.
United States Department of Agriculture Animal and Plant Health Inspection Service Plant Protection and Quarantine Hardwood MOU Memorandum of Understanding.
Insulating Glass Manufacturing Quality Procedure Manual TM (07)
Introduction for the Implementation of Software Configuration Management I thought I knew it all !
Outbound Process Using Wave, Pick-HU, Packing, Staging, and Loading
Responsibilities of Sponsor, Investigator and Monitor
Transportation of Class 7 materials: Compliance & Regulatory issues
Specifying Authority Tutorial (please click on speaker icon to hear instructions on each of the following slides) CMA & Title 24 Webinar; Jan 28, 2010.
AFSL Fireworks Seminar Grand Rapids, MI September 8, 2016
SAFE WORK INSTRUCTIONS
Special Provision 188 of IMDG Code 38-16
Overview of the FEPAC Accreditation Process
[INSERT APPLICABLE REGIONAL ENTITY NAME/LOGO]
Plastic Pipe Rule – Tracking and Traceability Proposed Requirements
What is the UL QFCP? FCIA Webinar Presenters:
CDE Transportation Unit
Internal controls 01-Nov-2017.
Overview on the Regulations and Technical Requirements for E-Waste Management in Rwanda. RURA.
DISPLAY FIREWORKS SEMINAR
AFSL SHIPPERS MEETING April 18, 2011
AFSL General Membership Meeting September 2011
DOE Review of the LCLS Project October 2006
OSU Controlled Substances Training Module for Researchers
Contract Requirements for Suppliers
Presentation transcript:

DISPLAY FIREWORKS FORUM February 23,

Display Fireworks Program Three components: 1.Annual factory audits 2.On-site product evaluations 3.Container loading supervision 2

3

4

Program Timetable Aug.1- Factory audit checklist was distributed for comments. Aug.18 – Follow-up meeting with display industry Sep.1 – Nov.30 – Factory audits conducted Nov.29 – China Industry Meeting Jan.1, Initiate products evaluation and container loading supervision 5

 Purpose:  Ensure proper manufacturing practices are maintained.  Validation of components and packaging for display fireworks meet the requirements of the Display Fireworks Certification Program. 6

 Factory Audit Sections:  Quality Assurance Records  Supplied Materials Quality Assurance  Process Control  Certification Documents 7

 AFSL Factory Registration Number :  Each compliant factory is assigned a unique AFSL Reg. No. related to the CIQ factory ID No.  Record of Registration Nos. maintained by AFSL.  In order to maintain the Reg. No., Annual re- Audits are required.  AFSL Reg. No. will be cancelled if a non- compliance result is obtained on any future re- Audit’s. 8

 Each Factory is required to successfully complete a factory audit to ship display fireworks to participating U.S. Importers 9

◦ 15 – Passed/ Certified ◦ 3 – Initially Failed (re-Audited and Passed) ◦ 4 – In process of pre-payment/ scheduling ◦ 2 – Factories Unresponsive 10

On-site Product Inspection  Purpose:  Ensure the product and packaging comply with the requirements of AFSL program.  Certify all shipping cartons with an AFSL sticker. 11

On-site Product Testing  Shipper submits an application for product evaluation to SGS.  Evaluation completed within 3 working days. 12

AFSL STANDARDS FOR DISPLAY FIREWORKS  Copy Available on AFSL Website. 13

14 Display Industry Representatives Robert Kellner, Kellner’s Fireworks Stephen Pelkey, Atlas Advanced Pyrotechnics James Burnett, Western Enterprises Stephen Vitale, Pyrotecnico Bob Deng, Lidu Fireworks Corporation, Ltd. Regulatory Authorities – ATF US DOT State Regulator Michael O’Lena, ATF Tom Dunaway, DOT (retired) Daniel McMullin, Illinois State Fire Marshal’s Office Shipping LinesYulu Hu, Hua Yang Transportation Co., Ltd. Insurance IndustryEric Treend, Britton-Gallagher & Associates, Inc. Packaging Industry Technical ExpertGraham Walsh, Energetic Materials Research and Testing Center Committee ChairmanJohn Rogers, AFSL Executive Director

15

Shipping cartons stacked to a minimum height of 3 meter (10 feet) must remain straight, sturdy and maintain their original shape. 16

 If there is a deviation of greater than 1 inch from vertical, the lot fails this test.  If any box within the stack bows, compresses or otherwise becomes misshaped by greater than one inch, the lot fails this test. 17

18

3-1.3 All fireworks subject to this standard must not have Electric Matches or Igniters attached to them or packaged with them in the same packaging carton. 19

Inner packaging, fittings, and cushioning materials, and the placing of Display Fireworks in packages, must be such that the Display Fireworks are prevented from becoming loose in the outer packaging during transportation Display Fireworks must be separated from each other in order to prevent friction and impact. Padding, trays, partitioning in the inner or outer packaging must be used for this purpose. 20

Shipping cartons containing products weighing 20kg (44 lbs.) or over must be manufactured from a minimum of seven (7) layers of cardboard material Shipping cartons containing products weighing less than 20kg (44 lbs.) must be manufactured from a minimum of five (5) layers of cardboard material.

22

EX numbers for fireworks contained in shipping cartons must be marked on the shipping carton or on shipping documents.

Rising effects on Shells (including: Tails, Comets, and Whistles) must be covered in a manner that does not allow any pyrotechnic composition to be exposed. NOTE: Packaging a Shell inside a plastic bag is not adequate to meet this requirement. A separate cover for the Tails, Comets, and whistles must be used.

25

The construction of the items must be adequate to prevent leakage or loss of any measurable amount of pyrotechnic composition during packaging, transportation, handling and storage.

The Lift Charge assembly must be securely attached to the Shell to ensure that pyrotechnic composition leakage does not occur during transportation, handling, and storage.

Connecting Fuses on Finale Chains must be constructed in a manner to remain free of any tearing or separation from the attached Shells and other fusing Fuses on Display Shells must be packed in the same compartment as the Shell itself in a manner that prevents them from being located under seams A Safety Cap must be installed over the exposed end of all Fuses attached to Display Fireworks packaged for transportation. The Safety Cap must be of a different color from that used for the paper covering of the Fuse.

29

All Fuses and Leaders on Display Fireworks devices must be attached in a manner to ensure they remain securely attached during transportation, handling, and storage Fuses on Display Shells 6 inches (152mm) and smaller, including Shells in Finale Chains, must be securely attached so that they are able support the weight of the Shell plus another Shell equal in size Fuses on Display Shells larger than 6 inches (152mm) must be able to support the weight of the Shell plus 227 grams (8 oz.) weight attached to the Fuse.

All Display Shells must contain an orienting loop securely attached to the top center of the Shell to assure proper orientation of the Shell when it is inserted into the Mortar. Visually observe whether the shell contains an orienting loop. Attach an 8-ounce (227-gram) weight to the shell, then grasp the orienting loop and lift the shell. The orienting loop should not separate from the shell. If the orienting loop does separate, the device fails this test.

32

Display Shells larger than 6 inches must contain a Lowering Rope that is equal in length to six times the diameter of the Shell that can support two times the weight of the Shell.

 Other Requirements a. Drop Test Documentation Review b. Thermal Stability Test Documentation Review 35

Certification of Lots  A Security Lot ID Number will be stamped on each carton in a lot.  Each shipping carton in an approved Lot will have an AFSL Security Sticker attached. 36

37

On-site Product Testing  Reporting:  The technician will complete a product evaluation report on-site and provide the result to factory representative.  The report will be provided to shipper by the next working day.  Results will be stored in AFSL database for tracking.  The original reports will be distributed to the shipper monthly.  38

Loading Supervision Procedures  Purpose:  Verify that only AFSL certified/approved display fireworks are loaded into shipping containers.  Verification of shipping documents.  Verify the goods are secured for transportation. 39

Loading Supervision Procedures Scheduling:  When the goods are ready to ship, the exporter/manufacturer will request loading supervision inspection from SGS at least 2 working days in advance.  AFSL certified technicians will be assigned to conduct loading supervision on scheduled date at either a consolidation warehouse or manufacture warehouse. 40

Loading Supervision Procedures  Reporting:  The final report will be issued to the client within 1 working day.  The report will be uploaded into the AFSL database for tracking purposes. 41

Loading Supervision Procedures  Failure criteria:  Products were not properly certified.  Unacceptable condition of container (leakage, damaged, etc.)  Broken and/or damaged fireworks shipping cartons and failure of exporter to take timely corrective action.  SGS will terminate the loading supervision inspection, the AFSL/SGS seal will not be applied and the client will be notified. 42

Participation Requirements for Importers 1. Sign an AFSL Participation Agreement. 2. Ask shippers in China to apply test on behalf of US importers. 3. Pay the test fee to Shippers, so the Shippers can pay to AFSL. 43

 Establish two permanent seats on the Board for Display Industry members: Mike Cartolano, Melrose Pyrotechnics; Phil Grucci, Fireworks by Grucci.  Set aside funds for special projects to enhance safety and quality of 1.3G Fireworks.  AFSL per-case cost to Importer: US$

THANK YOU! 45