Copyright © 2009 Pearson Prentice Hall. All rights reserved. Chapter 9 Capital Budgeting Techniques: Certainty & Risk.

Slides:



Advertisements
Similar presentations
Principles of Managerial Finance 9th Edition
Advertisements

Capital Budgeting Techniques: Certainty and Risk
Net Present Value and Other Investment Rules Chapter 5 Copyright © 2010 by the McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Copyright © 2009 Pearson Prentice Hall. All rights reserved. Chapter 9 Capital Budgeting Techniques.
The Capital Budgeting Decision (Chapter 12)  Capital Budgeting: An Overview  Estimating Incremental Cash Flows  Payback Period  Net Present Value 
Chapter 10 Capital-Budgeting Techniques and Practice.
Learning Goals Calculate, interpret and evaluate the payback period.
Copyright © 2003 Pearson Education, Inc. Slide 9-0 Chapter 9 Capital Budgeting Techniques.
Key Concepts and Skills
11-1 CHAPTER 11 The Basics of Capital Budgeting Should we build this plant?
Chapter McGraw-Hill/Irwin Copyright © 2006 by The McGraw-Hill Companies, Inc. All rights reserved. 9 Net Present Value and Other Investment Criteria.
© Prentice Hall, Chapter 8 Evaluating Investment Projects Shapiro and Balbirer: Modern Corporate Finance: A Multidisciplinary Approach to Value.
Capital Budgeting Techniques
© 2009 Cengage Learning/South-Western Capital Budgeting Chapter 8.
1 The Basics of Capital Budgeting: Evaluating and Estimating Cash Flows Corporate Finance Dr. A. DeMaskey Should we build this plant?
© 2003 McGraw-Hill Ryerson Limited 12 Chapter The Capital Budgeting Decision McGraw-Hill Ryerson©2003 McGraw-Hill Ryerson Limited Prepared by P Chua April.
Chapter 9 Capital Budgeting Techniques. Copyright © 2006 Pearson Addison-Wesley. All rights reserved. 9-2 Learning Goals 1.Understand the role of capital.
Copyright © 2012 Pearson Prentice Hall. All rights reserved. Chapter 10 Capital Budgeting Techniques.
Chapter 10 - Capital Budgeting
Chapter 6 Capital Budgeting Techniques.
© 2009 Pearson Prentice Hall. All rights reserved. Capital Budgeting and Cost Analysis.
Principles of Managerial Finance 9th Edition Chapter 10 Risk & Refinements in Capital Budgeting.
Ch 9 Learning Goals 3. The importance of risk in capital budgeting.
Chapter McGraw-Hill/Irwin Copyright © 2006 by The McGraw-Hill Companies, Inc. All rights reserved. 9 Net Present Value and Other Investment Criteria.
Chapter 10 Capital Budgeting Techniques. 2 Bennett Company is a medium sized metal fabricator that is currently contemplating two projects: Project A.
Copyright © 2012 Pearson Prentice Hall. All rights reserved. Chapter 10 Capital Budgeting Techniques.
Capital Budgeting Chapter 9 © 2003 South-Western/Thomson Learning.
© 2003 The McGraw-Hill Companies, Inc. All rights reserved. Net Present Value and Other Investment Criteria Chapter Nine.
Capital Budgeting Decision Tools 05/17/06. Introduction Capital Budgeting is the process of identifying, evaluating, and implementing a firm’s longer.
© 2012 Pearson Prentice Hall. All rights reserved Internal Rate of Return (IRR) The Internal Rate of Return (IRR) is a sophisticated capital budgeting.
Copyright © 2012 Pearson Prentice Hall. All rights reserved. Chapter 10 Capital Budgeting Techniques.
Capital Budgeting Chapter 11.
Chapter 12 The Capital Budgeting Decision. McGraw-Hill/Irwin © 2005 The McGraw-Hill Companies, Inc., All Rights Reserved. PPT 12-1 FIGURE 12-1 Capital.
Copyright © 2009 Pearson Prentice Hall. All rights reserved. Chapter 10 Risk and Refinements in Capital Budgeting.
Copyright © 2012 Pearson Prentice Hall. All rights reserved. Chapter 10 Capital Budgeting Techniques.
Overview of Capital Budgeting
Capital Budgeting Techniques: Certainty & Risk
Ch 12: Capital Budgeting Decision Criteria
Risk and Refinements in Capital Budgeting
Chapter 10 Capital Budgeting Techniques.
1 Copyright © 2008 Cengage Learning South-Western Heitger/Mowen/Hansen Capital Investment Decisions Chapter Twelve Fundamental Cornerstones of Managerial.
CORNERSTONES of Managerial Accounting 5e. © 2014 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part,
The Capital Budgeting Decision Chapter 12. Chapter 12 - Outline What is Capital Budgeting? 3 Methods of Evaluating Investment Proposals Payback IRR NPV.
© 2012 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license.
Capital budgeting.
13-1 Agenda for 30 July (Chapter 9) Assessment of various commonly used methods for deciding how capital is to be allocated. Net Present Value (NPV) The.
Basics of Capital Budgeting. An Overview of Capital Budgeting.
Chapter 12 Risk and Refinements on CB © 2012 Pearson Prentice Hall. All rights reserved
0 Corporate Finance Ross  Westerfield  Jaffe Seventh Edition 6 Chapter Six Some Alternative Investment Rules.
Copyright © 2009 Pearson Prentice Hall. All rights reserved. Chapter 9 Capital Budgeting Techniques.
Chapter 6 – Multiple Cash FlowsCopyright 2008 John Wiley & Sons 1 CHAPTER 10 The Fundamentals of Capital Budgeting.
Chapter 11 Capital Budgeting Techniques: Certainty and Risk Lawrence J. Gitman Jeff Madura Introduction to Finance.
1 CHAPTER 5 Capital Budgeting Techniques. 2 Introduction to capital budgeting Payback period Discounted payback period Net Present value (NPV) Profitability.
Chapter 8 Fundamentals of Capital Budgeting. Copyright ©2014 Pearson Education, Inc. All rights reserved Forecasting Earnings Capital Budget –Lists.
Key Concepts and Skills
Learning Goals LG1 Understand the key elements of the capital budgeting process. LG2 Calculate, interpret, and evaluate the payback period. LG3 Calculate,
Learning Goals LG1 Understand the key elements of the capital budgeting process. LG2 Calculate, interpret, and evaluate the payback period. LG3 Calculate,
Capital Budgeting Techniques FHU3213
Capital Budgeting Cash Flows and Capital Budgeting Techniques
CHAPTER 11 The Basics of Capital Budgeting
Overview of Capital Budgeting
Overview of Capital Budgeting
Chapter 10 Capital Budgeting Techniques.
CAPITAL BUDGETING The term capital budgeting consists of two words, capital and budgeting. Capital means funds currently available with the company and.
Capital Budgeting and its Techniques
Capital Budgeting and its Techniques
Capital Budgeting and its Techniques
Chapter 24: Capital Investment Decisions
Capital-Budgeting Techniques.
Learning Goals LG1 Understand the key elements of the capital budgeting process. LG2 Calculate, interpret, and evaluate the payback period. LG3 Calculate,
Presentation transcript:

Copyright © 2009 Pearson Prentice Hall. All rights reserved. Chapter 9 Capital Budgeting Techniques: Certainty & Risk

Copyright © 2009 Pearson Prentice Hall. All rights reserved. 9-2 Learning Goals 1.interpret, and evaluate the payback period. 2.Apply net present value (NPV) and internal rate of return (IRR). 3.Use net present value profiles to compare NPV and IRR techniques. 4.Discuss two additional considerations in capital budgeting – recognizing real options and choosing projects under capital rationing.

Copyright © 2009 Pearson Prentice Hall. All rights reserved. 9-3 Learning Goals (cont.) 5. 6.Understand the calculation and practical aspects of risk-adjusted discount rates (RADRs).

Copyright © 2009 Pearson Prentice Hall. All rights reserved. 9-4 Bennett Company is a medium sized metal fabricator that is currently contemplating two projects: Project A requires an initial investment of $42,000, project B an initial investment of $45,000. The relevant operating cash flows for the two projects are presented in Table 9.1 and depicted on the time lines in Figure 9.1. Capital Budgeting Techniques Chapter Problem

Copyright © 2009 Pearson Prentice Hall. All rights reserved. 9-5 Capital Budgeting Techniques (cont.) Table 9.1 Capital Expenditure Data for Bennett Company

Copyright © 2009 Pearson Prentice Hall. All rights reserved. 9-6 Capital Budgeting Techniques (cont.) Figure 9.1 Bennett Company’s Projects A and B

Copyright © 2009 Pearson Prentice Hall. All rights reserved. 9-7 Payback Period The payback method simply measures how long (in years and/or months) it takes to recover the initial investment. The maximum acceptable payback period is determined by management. If the payback period is less than the maximum acceptable payback period, accept the project. If the payback period is greater than the maximum acceptable payback period, reject the project.

Copyright © 2009 Pearson Prentice Hall. All rights reserved. 9-8 Pros and Cons of Payback Periods The payback method is widely used by large firms to evaluate small projects and by small firms to evaluate most projects. It is simple, intuitive, and considers cash flows rather than accounting profits. It also gives implicit consideration to the timing of cash flows and is widely used as a supplement to other methods such as Net Present Value and Internal Rate of Return.

Copyright © 2009 Pearson Prentice Hall. All rights reserved. 9-9 Pros and Cons of Payback Periods (cont.) One major weakness of the payback method is that the appropriate payback period is a subjectively determined number. It also fails to consider the principle of wealth maximization because it is not based on discounted cash flows and thus provides no indication as to whether a project adds to firm value. Thus, payback fails to fully consider the time value of money.

Copyright © 2009 Pearson Prentice Hall. All rights reserved Pros and Cons of Payback Periods (cont.) Table 9.2 Relevant Cash Flows and Payback Periods for DeYarman Enterprises’ Projects

Copyright © 2009 Pearson Prentice Hall. All rights reserved Pros and Cons of Payback Periods (cont.) Table 9.3 Calculation of the Payback Period for Rashid Company’s Two Alternative Investment Projects

Copyright © 2009 Pearson Prentice Hall. All rights reserved Net Present Value (NPV): Net Present Value is found by subtracting the present value of the after-tax outflows from the present value of the after-tax inflows. Net Present Value (NPV)

Copyright © 2009 Pearson Prentice Hall. All rights reserved Decision Criteria If NPV > 0, accept the project If NPV < 0, reject the project If NPV = 0, technically indifferent Net Present Value (NPV) (cont.) Net Present Value (NPV): Net Present Value is found by subtracting the present value of the after-tax outflows from the present value of the after-tax inflows.

Copyright © 2009 Pearson Prentice Hall. All rights reserved Using the Bennett Company data from Table 9.1, assume the firm has a 10% cost of capital. Based on the given cash flows and cost of capital (required return), the NPV can be calculated as shown in Figure 9.2 Net Present Value (NPV) (cont.)

Copyright © 2009 Pearson Prentice Hall. All rights reserved Net Present Value (NPV) (cont.) Figure 9.2 Calculation of NPVs for Bennett Company’s Capital Expenditure Alternatives

Copyright © 2009 Pearson Prentice Hall. All rights reserved Net Present Value (NPV) (cont.)

Copyright © 2009 Pearson Prentice Hall. All rights reserved Internal Rate of Return (IRR) The Internal Rate of Return (IRR) is the discount rate that will equate the present value of the outflows with the present value of the inflows. The IRR is the project’s intrinsic rate of return.

Copyright © 2009 Pearson Prentice Hall. All rights reserved Decision Criteria If IRR > cost of capital, accept the project If IRR < cost of capital, reject the project If IRR = cost of capital, technically indifferent Internal Rate of Return (IRR) (cont.) The Internal Rate of Return (IRR) is the discount rate that will equate the present value of the outflows with the present value of the inflows. The IRR is the project’s intrinsic rate of return.

Copyright © 2009 Pearson Prentice Hall. All rights reserved Figure 9.3 Calculation of IRRs for Bennett Company’s Capital Expenditure Alternatives

Copyright © 2009 Pearson Prentice Hall. All rights reserved To prepare NPV profiles for Bennett Company’s projects A and B, the first step is to develop a number of discount rate-NPV coordinates and then graph them as shown in the following table and figure. Net Present Value Profiles NPV Profiles are graphs that depict project NPVs for various discount rates and provide an excellent means of making comparisons between projects.

Copyright © 2009 Pearson Prentice Hall. All rights reserved Net Present Value Profiles (cont.) Table 9.4 Discount Rate–NPV Coordinates for Projects A and B

Copyright © 2009 Pearson Prentice Hall. All rights reserved Net Present Value Profiles (cont.) Figure 9.4 NPV Profiles

Copyright © 2009 Pearson Prentice Hall. All rights reserved Conflicting Rankings Conflicting rankings between two or more projects using NPV and IRR sometimes occurs because of differences in the timing and magnitude of cash flows. This underlying cause of conflicting rankings is the implicit assumption concerning the reinvestment of intermediate cash inflows—cash inflows received prior to the termination of the project. NPV assumes intermediate cash flows are reinvested at the cost of capital, while IRR assumes that they are reinvested at the IRR.

Copyright © 2009 Pearson Prentice Hall. All rights reserved Bennett Company’s projects A and B were found to have conflicting rankings at the firm’s 10% cost of capital as depicted in Figure 9.4. If we review the project’s cash inflow pattern as presented in Table 9.1 and Figure 9.1, we see that although the projects require similar investments, they have dissimilar cash flow patterns. Table 9.5 on the following slide indicates that project B, which has higher early-year cash inflows than project A, would be preferred over project A at higher discount rates. Conflicting Rankings (cont.)

Copyright © 2009 Pearson Prentice Hall. All rights reserved Conflicting Rankings (cont.) Table 9.5 Preferences Associated with Extreme Discount Rates and Dissimilar Cash Inflow Patterns

Copyright © 2009 Pearson Prentice Hall. All rights reserved Which Approach is Better? On a purely theoretical basis, NPV is the better approach because: –NPV assumes that intermediate cash flows are reinvested at the cost of capital whereas IRR assumes they are reinvested at the IRR, –Certain mathematical properties may cause a project with non-conventional cash flows to have zero or more than one real IRR. Despite its theoretical superiority, however, financial managers prefer to use the IRR because of the preference for rates of return.

Copyright © 2009 Pearson Prentice Hall. All rights reserved Recognizing Real Options Real options are opportunities that are embedded in capital projects that enable managers to alter their cash flows and risk in a way that affects project acceptability (NPV). Real options are also sometimes referred to as strategic options. Some of the more common types of real options are described in the table on the following slide.

Copyright © 2009 Pearson Prentice Hall. All rights reserved Recognizing Real Options (cont.) Table 9.6 Major Types of Real Options

Copyright © 2009 Pearson Prentice Hall. All rights reserved Capital Rationing Firm’s often operate under conditions of capital rationing— they have more acceptable independent projects than they can fund. In theory, capital rationing should not exist—firms should accept all projects that have positive NPVs. However, research has found that management internally imposes capital expenditure constraints to avoid what it deems to be “excessive” levels of new financing, particularly debt. Thus, the objective of capital rationing is to select the group of projects within the firm’s budget that provides the highest overall NPV or IRR.

Copyright © 2009 Pearson Prentice Hall. All rights reserved Tate Company, a fast growing plastics company with a cost of capital of 10%, is confronted with six projects competing for its fixed budget of $250,000. The initial investment and IRR for each project are shown below: Capital Rationing

Copyright © 2009 Pearson Prentice Hall. All rights reserved Capital Rationing: IRR Approach Figure 9.5 Investment Opportunities Schedule

Copyright © 2009 Pearson Prentice Hall. All rights reserved Capital Rationing: NPV Approach Table 9.7 Rankings for Tate Company Projects

Copyright © 2009 Pearson Prentice Hall. All rights reserved International Risk Considerations (cont.) Political risk is much harder to protect against once a project is implemented. A foreign government can block repatriation of profits and even seize the firm’s assets. Accounting for these risks can be accomplished by adjusting the rate used to discount cash flows—or better—by adjusting the project’s cash flows.

Copyright © 2009 Pearson Prentice Hall. All rights reserved Risk-Adjusted Discount Rates Risk-adjusted discount rates are rates of return that must be earned on given projects to compensate the firm’s owners adequately—that is, to maintain or improve the firm’s share price. The higher the risk of a project, the higher the RADR— and thus the lower a project’s NPV.

Copyright © 2009 Pearson Prentice Hall. All rights reserved Risk-Adjusted Discount Rates: RADRs in Practice Table 9.9 Bennett Company’s Risk Classes and RADRs