Work Breakdown Structure

Slides:



Advertisements
Similar presentations
Work Breakdown Structures
Advertisements

Project Scope Management (Day 2)
NEES Project Management Workshop June 16 June 18 1 Segment 3.
Project Planning and Scope
Chpter#5 -part#1 Project Scope and Human Resource Planning
Chapter 5: Project Scope Management
Chapter 5: Project Scope Management
Work Breakdown Structure.
Project Scope Management
Project Scope Management
Chapter 4: Project Scope Management
Chapter 5: Project Scope Management
Information Technology Project Management, Seventh Edition Note: See the text itself for full citations.
Project Integration Management Sections of this presentation were adapted from A Guide to the Project Management Body of Knowledge 4 th Edition, Project.
Chapter 5: Project Scope Management
Project Plan The Development Plan The project plan is one of the first formal documents produced by the project team. It describes  How the project will.
Project Management Session 7
Chapter 5: Project Scope Management
Project Scope Management
Systems Engineering Management
Chapter 5: Project Scope Management J. S. Chou, P.E., PhD.
Project Scope Management
Project Scope Management J. S. Chou, P.E., PhD.
Chapter 5: Project Scope Management
Project Management and Scheduling
Chapter 5: Project Scope Management
INFORMATION SYSTEM APPLICATIONS System Development Life Cycle.
Work Breakdown Structure (WBS) in Project Management.
BSBPMG503A Manage Project Time Manage Project Time Unit Guide Diploma of Project Management Qualification Code BSB51507 Unit Code BSBPMG503A.
Lecturer -Raja Natarajan Jul Project Integration and Scope Management Identifying, Selecting and Defining a Project ……….
Project Scope Management Process
Recap from last week Understand organizations, including the four frames, organizational structures. Explain why stakeholder management and top management.
Chapter 5: Project Scope Management Information Technology Project Management.
IT Project Management, Third Edition Chapter 5 1 Chapter 2: Project Scope Management.
Module 5: Scope Management
Information Technology Project Management, Seventh Edition Note: See the text itself for full citations.
Welcome to Session 4 – Project Management Process Overview (continued) Instructor:Phyllis Sweeney Instructor: Phyllis Sweeney Project Management Certificate.
© 2012 Cengage Learning. All Rights Reserved. This edition is intended for use outside of the U.S. only, with content that may be different from the U.S.
Basic of Project and Project Management Presentation.
Project Scope Management Project management Digital Media Department Unit Credit Value : 4 Essential Learning time : 120 hours.
Copyright 2008 Introduction to Project Management, Second Edition 2  Many people have heard the following sayings: ◦ If you fail to plan, you plan to.
Week 2 Seminar: Project Scope Management
Project Scope Management Mohammad A. Rob. Importance of Good Project Scope Management Studies found that user involvement, a clear project mission, a.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
Work Breakdown Structure Kathy S. Schwaig. What is a Work Breakdown Structure (WBS)? A WBS is a logical hierarchy of work packages involved in a project.
Ch 4 - Learning Objectives Scope Management You should be able to: n Discuss the relationship between scope and project failure n Describe how strategic.
Work Breakdown Structure Use and Demo
Project Scope Management Information Technology Project Management, Fifth Edition Note: some slides have been removed from the author’s original presentation.
Chapter 5: Project Scope Management Information Technology Project Management, Fourth Edition Scope Statement and WBS Thursday, February 15.
Information Technology Project Management, Seventh Edition Note: See the text itself for full citations.
Project Scope Management 1. 2 Learning Objectives Understand the elements that make good project scope management important. Explain the scope planning.
Information Technology Project Management, Sixth Edition.
Recent trends in IT projects – Globalization, outsourcing, and virtual teams Project management process groups – Initiating, planning, executing, monitoring.
Apply Project Scope Management Techniques Project Scope Processes – Part 2 Week 4 Certificate IV in Project Management Qualification Code BSB41507.
Information Technology Project Management, Eighth Edition Note: See the text itself for full citations.
ManagingInformation Technology Projects, Sixth Edition Managing Information Technology Projects, Sixth EditionSchwalbe Note: See the text itself for full.
Information Technology Project Management, Seventh Edition.
What is a WBS? A Work Breakdown Structure is not a list of tasks, a schedule or an organization chart. Rather it provides the basis on which a task.
Creating a Work Breakdown Structure with Microsoft Project.
Week 5 – Project Scope Management
IF 3507 Manajemen Proyek Perangkat Lunak
Project Management MGT 30725
Chapter 5: Project Scope Management
Chapter 5: Project Scope Management
Chapter 5: Project Scope Management
Chapter 5: Project Scope Management
Chpter#5 -part#1 Project Scope and Human Resource Planning
Chapter 5: Project Scope Management
Work Breakdown Structure
Chapter 5: Project Scope Management
Presentation transcript:

Work Breakdown Structure

Session Objectives By the end of the session, participants will be able to: Decompose project activities into manageable task or activities; Prepare a Work Breakdown Structure.

Session Flow Presentation (30min) Learning Team Exercise (1hr) Team Presentation of Output (1hr 45min)

WBS Definition PMBOK® Guide Definition A deliverable-oriented grouping of project elements that organizes and defines the total work scope of the project. Each descending level represents an increasingly detailed definition of the project work.

Work Breakdown Structure The tool for breaking down a project into its component parts. It is the foundation of project planning and one of the most important techniques used in project management.

WBS Decomposition WBS LEVEL 3: WBS LEVEL 2: WBS LEVEL 1: 1. Bicycle 1.1 Frame Set 1.1.1 Frame 7 1.1.2 Handlebar 2 1.1.3 Fork 3 1.1.4 Seat 3 1.2 Crank Set 5 1.3 Wheels 1.3.1 Front Wheel 13 1.3.2 Rear Wheel 17 1.4 Braking System 5 1.5 Shifting System 5 1.6 Integration 1.6.1 Concept 3 1.6.2 Design 5 1.6.3 Assembly 10 1.6.4 Testing 17 1.7 Project Mgt. 5 -------- 100 WBS LEVEL 2: 1. Bicycle 1.1 Frame Set 15 1.2 Crank Set 5 1.3 Wheels 30 1.4 Braking System 5 1.5 Shifting System 5 1.6 Integration 35 1.7 Project Mgt. 5 ------ 100 WBS LEVEL 1: 1. Bicycle 100

WBS in Graphical Form Bicycle Frame Set Crank Set Wheels Shifting System Integration Project Management Frame Handlebar Fork Seat Front Wheel Rear Wheel Base Buildings Maintenance Facility Developmental Test Test Braking System

WBS in Outline Form 1. Bicycle 1.1 Frame Set 1.1.1 Frame 7 1.1.2 Handlebar 2 1.1.3 Fork 3 1.1.4 Seat 3 1.2 Crank Set 5 1.3 Wheels 1.3.1 Front Wheel 13 1.3.2 Rear Wheel 17 1.4 Braking System 5 1.5 Shifting System 5 1.6 Integration 1.6.1 Concept 3 1.6.2 Design 5 1.6.3 Assembly 10 1.6.4 Testing 17 1.7 Project Mgt. 5 100

Advantages of WBS Provides a detailed illustration of the project scope Create accurate cost and schedule estimates Monitor progress easily Basis for building project teams

WBS Decomposition There is no single best way to develop a WBS.

WBS Organized by Product Aircraft System Project Management Training Data Support Equipment Facilities Test and Evaluation Engineering Supporting PM Activities Services Technical Orders Organizational Level SE Intermediate Depot Base Buildings Maintenance Facility Mock-ups Operational Test Developmental Test Airframe Engine Communication Navigation Fire Control Air Vehicle

WBS Organized by Phase Software Product Release 5.0 Project Management Requirements Detail Design Construct Integration and Test Planning Meetings Administration Software User Documentation Training Program Materials

Criteria for a Successful WBS WBS must be broken down starting at the top Work packages must add up to the summary task Each summary task and work package must be named an activity that produces a product (use SMART Technique)

Criteria for a Successful WBS Specific Measurable Agreed upon Realistic Time-bound

Approaches to Developing WBS Guidelines: Some organizations, provide guidelines for preparing WBS. Analogy approach: Review WBS of similar projects and tailor to your project. Top-down approach: Start with the largest items of the project and break them down. Bottom-up approach: Start with the specific tasks and roll them up. Mind-mapping approach: Write tasks in a non-linear, branching format and then create the WBS structure.

Post-it Technique IT Upgrade Project Install Hardware & Software Project Mgt. Acquire Hardware & Software Update Inventory Update Database Perform Physical Inventory Servers User Hardware Bldg. A Laptops Desktops Bldg. B Bldg. C

Mind-Mapping Approach

Resulting WBS in Graphical Form

The WBS Dictionary Many WBS tasks are vague and must be explained in more detail so people know what to do and can estimate how long the work will take and what it will cost. A WBS dictionary is a document that describes detailed information about each WBS item. The approved project scope statement and its WBS and WBS dictionary form the scope baseline, which is used to measure performance in meeting project scope goals.

Advice for Creating WBS and WBS Dictionary A unit of work should appear in only one place in the WBS. The work content of a WBS item is the sum of the WBS items below it. A WBS item is the responsibility of only one individual, even though many people may be working on it. The WBS must be consistent with the way in which work is actually going to be performed; it should serve the project team first, and other purposes only if practical.

Advice for Creating WBS and WBS Dictionary Project team members should be involved in developing the WBS to ensure consistency and buy-in. Each WBS item must be documented in a WBS dictionary to ensure accurate understanding of the scope of work that is included and not included in that item. The WBS must be a flexible tool to accommodate inevitable changes while properly maintaining control of the work content in the project according to the scope statement.

Responsibility Assignment Matrix ACTIVITY PM SA/D PROG Tester SQA 1.1.1 Approve Requirements A 1.1.2 Prepare Functional Spec C R 1.2 Develop Design N 1.3 Code Programs 1.4.1 Prepare Test Plan 1.4.2 Prepare Test Data 1.4.3 Conduct Testing 1.5 Conduct Training S 1.6 Do Acceptance Testing R=Responsible; S=Support Required; C=Must be consulted; N=Must be notified; A=Approval required