Workshop Simulated Licence Round 8 th - 10 th February 2012 Petroleum Economics.

Slides:



Advertisements
Similar presentations
OilSim day 2 Today’s Challenges Task 3 yesterday Task 5 Task 4
Advertisements

The Focus of Industry Lecture 1 Exploration Refining Production
Going Beyond Exploration
Fin351: lecture 5 Other Investment Criteria and Free Cash Flows in Finance Capital Budgeting Decisions.
Engineering Economics III. Adjustments We learned how to compute the value of money at different times and under different scenarios. We also learned.
Net Present Value and Other Investment Rules Chapter 5 Copyright © 2010 by the McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
MANAGERIAL ACCOUNTING
John Wiley & Sons, Inc. © 2005 Prepared by Alice B. Sineath Forsyth Technical Community College Managerial Accounting Weygandt Kieso Kimmel CHAPTER 12.
McGraw-Hill/Irwin Copyright © 2013 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Copyright © 2013 by The McGraw-Hill Companies,
Key Concepts and Skills
Capital Budgeting: To Invest or Not To Invest  Capital Budgeting Decision –usually involves long-term and high initial cost projects. –Invest if a project’s.
© John Wiley & Sons, 2005 Chapter 12: Strategic Investment Decisions Eldenburg & Wolcott’s Cost Management, 1eSlide # 1 Cost Management Measuring, Monitoring,
Capital Budgeting Net Present Value Rule Payback Period Rule
McGraw-Hill/Irwin Copyright © 2013 by The McGraw-Hill Companies, Inc. All rights reserved. NPV, Internal Rate of Return (IRR), and the Profitability Index.
ENGM 661 Engineering Economics Depreciation & Taxes.
Other Investment Criteria and Free Cash Flows in Finance
Lecture 8 Strategy and Analysis in using NPV The NPV analysis then gives a precise formula for deciding whether or not to proceed with the investment.
4. Project Investment Decision-Making
Chapter 11 Cash Flow Estimation & Risk Analysis. 2 Topics Estimating cash flows: Relevant cash flows Working capital treatment Risk analysis: Sensitivity.
Capital Budgeting Investment Rules
“The Play’s The Thing!” William Shakespeare, as quoted to Pete Rose THE MOST CRUCIAL DECISION: SELECTING NEW PLAYS.
Adapted from Smith and Kihlstrom (1999) Integration of Financial Statements: From Smith and Kihlstrom (1999 ) Assumptions Ending Balance Sheet Cash Flow.
Fin351: lecture 4 Other Investment Criteria and discounted Cash Flow Analysis Capital Budgeting Decision.
INVESTMENTS | BODIE, KANE, MARCUS Copyright © 2014 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written.
Bidding for a Venezuelan Oil Field: The Third Round of “La Apertura” Eddi Danusaputro Hilde Larssen Jose Molleja Jeremy Usher.
Upstream solutions kazpetro technology ltd. Statement of Capability kazpetro technology ltd (Kazakhstan) delivers innovative exploration techniques, reservoir,
Oil and Gas Prospects in Lebanon 1 st Licensing Round: Bidding & Contractual Terms Arab Economic Forum 9-10 May 2013 Wissam Zahabi – Head of Economic &
The Power of Numbers 10-1Copyright © 2011 Nelson Education Ltd. Explore Your Financial Vision chapter 1010 Prepared by Ron Knowles Algonquin College &
OilSim Exploration OLF OILSIM Overview Purpose: Enhance your overall understanding of petroleum exploration Multidisciplinary challenge You are.
Management and Cost Accounting, 6 th edition, ISBN © 2004 Colin Drury MANAGEMENT AND COST ACCOUNTING SIXTH EDITION COLIN DRURY.
Capital Budgeting and Financial Planning
Chapter 7 Fundamentals of Capital Budgeting. 7-2 Chapter Outline 7.1 Forecasting Earnings 7.2 Determining Free Cash Flow and NPV 7.3 Analyzing the Project.
Stochastic Handling of Uncertainties in the Decision Making Process SPE London, 26th October 2010 Dag Ryen Ofstad, Senior Consultant, IPRES Norway.
OIL RECOVERY MECHANISMS AND THE MATERIAL BALANCE EQUATION
Part 5.1 Petroleum Economics. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Understand supply.
8- 1 McGraw Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved Chapter 8 Net Present Value and Other Investment Criteria.
Reserve Evaluation for Enhance Oil Recovery Purposes Using Dynamic Reserve Evaluation Model Woodside Research Facility GPO Box U 1987 Perth West Australia.
Capital Budgeting The Capital Budgeting Decision Time Value of Money Methods of Capital Project Evaluation Cash Flows Capital Rationing The Value of a.
Business Funding & Financial Awareness Time Value of Money – The Role of Interest Rates in Decision Taking J R Davies May 2011.
Business Funding & Financial Awareness CAPITAL BUDETING J R Davies May 2011.
Chapter McGraw-Hill/Irwin Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved. Cost of Capital 11.
Jens Petur Bærentsen Simprentis Marcos Monteferrante OILSIM EXPLORATION Svalex 2007 Longyearbyen, Svalbard, Norway August 2007.
OilSim Faroes 2007 Facilitator Course Tórshavn, 2. Oktober, 2007.
Pro Forma Income Statement Projected or “future” financial statements. The idea is to write down a sequence of financial statements that represent expectations.
Peter’s & Co. Oil and Gas Conference – SEPTEMBER 2005 A Platform for Growth.
Early Offshore Petroleum Development Cost Estimates Using GIS Narmina Lovely, GEOG 596A Advisor: Patrick Kennelly.
OIL AND GAS EVALUATIONS PROBABLE & POSSIBLE RESERVES WHAT WILL THE INVESTOR THINK? February 15, 2010 FORREST A. GARB & ASSOCIATES, INC. INTERNATIONAL PETROLEUM.
1 of 30 GIS for Reservoir Management: Estimating Original Gas In Place Jeffrey Vu, M.GIS Candidate Dr. Patrick Kennelly, Advisor.
Investment Analysis Lecture: 18 Course Code: MBF702.
Financial Management Glencoe Entrepreneurship: Building a Business Analyzing Your Finances Managing Your Finances 21.1 Section 21.2 Section 21.
Accounting Page 313.  Why?  To measure the success of a business  To assess performance  To get loans from banks  To plan ahead.
Copyright © 2014 Nelson Education Ltd. 11–1 PowerPoint Presentations for Finance for Non-Financial Managers: Seventh Edition Prepared by Pierre Bergeron.
PRESENTATION ON FINANCIAL COMPONENT OF A BUSINESS PLAN BY AHMeD Hussain Khan.
Using Discounted Cash Flow Analysis to Make Investment Decisions Project Analysis By : Else Fernanda, SE.Ak., M.Sc. ICFI.
 BASIC TERMS AND CONCEPTS (1) Petroleum: refers to crude oil and natural gas or simply oil and gas. (2) Crude oil: refers to hydrocarbon mixtures produced.
Copyright © Houghton Mifflin Company. All rights reserved.1 Financial & Managerial Accounting 2002e Belverd E. Needles, Jr. Marian Powers Susan Crosson.
Chapter 36 Financing the Business Section 36.1 Preparing Financial Documents Section 36.2 Financial Aspect of a Business Plan Section 36.1 Preparing Financial.
Creating a Successful Financial Plan Volume is vanity; profitability is sanity …Brad Skelton It is better to solve problems than crises …John Guinther.
P4 Advanced Investment Appraisal. 2 2 Section C: Advanced Investment Appraisal C1. Discounted cash flow techniques and the use of free cash flows. C2.
F9 Financial Management. 2 Section D: Investment appraisal Designed to give you the knowledge and application of: D3. Discounted cash flow (DCF) techniques.
Day 1 Session 1 Day 1Introductions Economics and accounting Building a basic project cash flow Economic and risk indicators The.
MODULE 4 UPSTREAM PETROLEUM ECONOMICS 1. 2 Tutorial 1 : Technical Data input for Economic Evaluation Field ‘Sparco’, located south east of the country,
Key Concepts and Skills
Black Gold Gold The Triangle Prospect.
© Inge Hill, Start Up, Palgrave 2015
10 C Strategy Management of Capital Expenditures hapter
Chapter 36 Financing the Business
Managerial Accounting 2002e
Deterministic Prospect Assessment
PLANNING FOR CAPITAL INVESTMENTS
Presentation transcript:

Workshop Simulated Licence Round 8 th - 10 th February 2012 Petroleum Economics

Workshop Outline … part 1

You have been divided into groups of 8-9 Each group is an exploration company (you’ll need a name) interested in bidding for blocks in an upcoming licence round The exercise will be run in parallel with 9 teams in each set

Set A Group A1Group A2Group A3Group A4Group A5Group A6Group A7Group A8Group A9 ApampaBakareChukwudiFadipeFagboworeIheObeahonDecrouxHennion AndersonBarroso Viseras BuschCharonnatDieudonneEl HajbiFaureGassabiJulkipli AgrawalAlshawafAlyapinaDurongwattan a Haji JasniHouImamJehangirPetto BaldwinBarkleyBullimoreDevlinDoraiHarpinHodginsKeayLyne TaylorRussellRiccioBailletCannelleRoblet- Bambridge VarvaraPatrickBurgess Al HootiCaratgeCeyhanEres GuardiaHaji MasriKimAkatakpoFarhatHussain RasheedStuderTamunobereto n-ari UmorenWatsonZhangKaewprainKanafinaKaralis Sheyh Husein SpyrouFargoSegersWoodTolessinRajesh Kumar

Set B Group B1Group B2Group B3Group B4Group B5Group B6Group B7Group B8Group B9 IzzidienKaczmarczykKaramessinisLislaudMcCaughanMcDonaldMylonakiPantinRassuli JusohLiewNguyenXiaoSpronkVaradi MagoValdivaiano Huertas KhairullinTariq PhoowarangSunSuPointingRobertsSinclair SmithThiakalingamTranchinaTwallin McGreevyMcKeanMinnsEevaDowdeswellLanganLawryReynoldsZheng De GrouchyDinwoodieSloanWangZahariKangMohd. AsmanNnachettaOboh KamaludinNwachukwuRaphaelNorthallOakleyOkochaPaiva Almeda de Franca PhillipsPolisano KokoshinaLiNgeriVoakeLohOmofomaSandifordSantacreu Llovera Wilson Prise

Geological Information You each have access to the same set of base data, which includes a map of the blocks on offer, prospect outlines, isopach data on the only prospective interval, and data on six wells adjacent to the blocks on offer Seismic data are first class over the entire area, and you have all mapped the top and base of the only prospective reservoir (a Tertiary channel sand) in an identical way. You therefore all have identical gross sand isopach interpretations (contour interval 100 ft) and prospect outlines:

Investment Appraisal Exercise 9-block Licence Award Area Forfar Crieff Brechin Edinburgh Dundee Glasgow Helmsdale Inverurie Orange areas are prospect outlines Black contours are 100 ft isopachs Aberdeen    0 0

Geological Cross Section A-A’

Geological Cross Section B-B’

Prospect Details [ Remember that units are tricky... GRV is measured in acre feet, and reserves are quoted in barrels, so use the conversion factor of 7758 barrels per acre foot. ] You have each planimetered the prospect maps in the same way, and have assessed the gross rock volumes of the various prospects as follows:

More Geological Information You all have the following information, and only this information, from the 6 wells drilled nearby: WellN/G PorosityS HC Re FVF (RB/STB) N/AN/A N/AN/A N/AN/A Wells 1, 3 and 6 all recovered oil, GOR about 100 scf/Bbl, gas volumes sufficient only for platform fuel

Upstream Oil Industry... volumetric assessment - recap Recoverable Hydrocarbons GRV (Gross Rock Volume) * N/G (Net reservoir to Gross rock ratio) * Ø (Porosity) * S hc (hydrocarbon saturation of pore fluids) * 1/FVF (Formation Volume Factor) * RF (Recovery Factor) Basis: correlation with nearby wells/data

Assessing Risk - recap Play Chance (%) Reservoir presence (%) * Reservoir Effectiveness (%) Seal presence (%) * Seal Effectiveness (%) Source presence (%) * Source maturity (%) * Source migration (%) Prospect Specific Risk (%) Trap presence (%) * Trap effectiveness (%) Reservoir presence (%) * Reservoir Effectiveness (%) Seal presence (%) * Seal Effectiveness (%) Source presence (%) * Source maturity (%) * Source migration (%) Overall Chance of Success = Play Chance * Prospect Specific Risk

Assessing Risk Assume the following: Play is proven Prospect Specific Risks are independent Remember we are using a dice to decide when a well is successful, therefore your chance of success can only be 1/6 (16.67%) 2/6 (33.33%) 3/6 (50%) 4/6 (66.67%) 5/6 (83.33%) 6/6 (100%)

Workshop Output … part 1 Assign an input distribution to Ø, N/G, Shc, FVF for each prospect. You are supplied with the GRV and Re distributions to use in the work file Complete a volumetric assessment of the nine blocks available for bid. Estimate the chance of success for each prospect Tabulate both unrisked and risked Resources for each prospect Consolidate your risked and unrisked recoverable Resource estimates to give the total Resource potential of the nine blocks Calculate the chance of making at least 1 discovery if all 9 prospects are drilled

Workshop Outline … part 2

Continue to work in your groups. Use your volumetric and risk assessment of the nine blocks available for bid. You are required to prepare cash bids for those blocks you wish to acquire, and each team has a budget of $1 billion for that purpose, $250 million from retained profits from the business and a $750 million borrowing facility. Produce a risked valuation of each prospect and rank them in order of attractiveness to you. Prepare a bid for at least 4 of the blocks

Workshop Outline … part 2 If your bids are unsuccessful, or you choose not to spend all of your budget, then any remaining retained profits are invested safely at 6% pa compound interest, after tax, for the period during which exploration, appraisal and production activity takes place … the borrowing facility not needed is not used. The successful bidder for each block will be decided by the Petroleum Minister based on the highest cash bid. The outcome of an exploration well on each of the prospects is determined by the throw of a dice. The values of each of the companies are determined by the Present Values of the discoveries, plus the compounded present value of unspent retained profits, less abortive costs.

Economic Modelling Assemble the cash flows by year, considering the magnitude and timing of all the costs associated with purchasing, developing and producing the prospect. You will be provided with a simple cash flow model Calculate NPV ’ s and EMV for each prospect (3 point)

Project schedule …… yr 0yr 1yr 2yr 3yr 4yr 5yr 6yr 7 Acquire licence x 2D seismic x Drill Expl. well x (if successful) 3D seismic x Drill Appr. Wells x Dev CAPEX xxx Dev Drilling x 1st production x

Economic Input Costs: all amounts expressed in real US$ Licence Acquisition - whatever you bid, in year zero CAPEX, DRILLEX, OPEX, [ABEX] - Costs for all of these depend on field production rates. The following slides allow you to estimate costs for your prospects. Forecast production – you will need to turn your recoverable oil volumes into annual production data (see following slides) Bids must be made in US$

Seismic Costs Assume the following: 2D seismic costs US$1.5 million to acquire 3D seismic costs US$6.0 million to acquire 3D seismic takes 1 year to acquire and interpret

Drilling Costs (Drillex) Assume the following: all E&A wells cost US$35 million (REAL) Exploration well is drilled in 2012 all successes require appraisal (2014) number of appraisal wells is related to level of resources (1 well for every 30 MMbbls) Recovery of oil is around 10 MMbbls per development well all Dev wells cost US$30 million (REAL) Assume the following: Subsea completion costs US$35 million (REAL) per producing well

FPSO Costs (CAPEX) Tip: Plot CAPEX vs. Production rate and use plot to interpolate. Don’t forget the costs are linked to daily production rate not annual volume of oil Minimum CAPEX = US$400 milllion Assume CAPEX is spent evenly over 3 years prior to first production

FPSO Costs (CAPEX) Tip: Use the plot of CAPEX vs. Production rate to derive a relationship between production rate and cost. Use this relationship to interpolate for the CAPEX in your cases. Don’t forget the costs are linked to daily production rate not annual volume of oil

Operating Costs (Opex) Annual fixed OPEX: Minimum fixed OPEX = US$35 per year Annual variable OPEX: Tip: Plot fixed and variable OPEX vs. Production rate and use plots to interpolate. Don’t forget the costs are linked to daily production rate not annual volume of oil

Production forecasts The reservoirs are capable of producing 14% of the total resources per year at peak, and the facilities and wells should be costed accordingly. Assume peak production is achieved instantaneously Production will decline after 5 years on plateau or once 70% of the field's resources have been produced Declining reservoir pressure means that production rates decline by 20% per year (declining balance basis).

Production profile example

Further Economic Input Oil price, discount rate, inflation rate - some analysts currently advise $95/bbl flat real and 10% nominal, respectively. Please use these assumptions. The model will assume that the general inflation rate is 2% per annum. Tax Rate - Corporation tax is currently levied at 50% of net revenues (i.e. gross revenues minus allowable expenditure)... the spreadsheet does the calculation for you.

Oil forecast examples

Oil price Quality Differential – 95% of Brent

EMV

Tip on how to get started To do the valuation rigorously would require you to compute 27 net cash flows representing the P90, P50 and P10 cases for every prospect. To save time plot unrisked NPV 10 against unrisked recoverable resources. Complete as many cases as you can but do enough to define the shape of the curve. Fit a trend line to the data and extract function Use this to compute the NPV 10 for your 27 cases and then the EMV 10 of each prospect

NPV 10 vs. Field Size Plot Minimum Commercial Field Size

Cost of Failure Cost of failure after dry hole Cost of failure if discovered volume is < minimum commercial field size

Cost of Failure (after dry hole)

Cost of Failure (after appraisal)

Tax position Assume that this will be your first asset and your company is not yet in a tax paying position Tax losses will be carried forward until they can be used (the model will do this for you) If you are unsuccessful there will be no tax relief on your failure costs

Bid Table Bids to be delivered in sealed envelope by lunch time on Friday You must bid for at least 4 prospects List all 9 prospects in order of preference and indicate which you are submitting a bid for. You should use EMV as the basis of your bids If you decide to offer a premium over the EMV remember that the unrisked success NPV’s should be able to cover the bid Label the bid sheet and envelope with your company name Each team will only be awarded one prospect Do not exceed your overall budget limit of $1000 million