Appendix H Phase 2 HGB Mid Course Review Peak Ozone Isopleth Plots for August 25 - September 6 Base 5b peak one-hour concentrations CS-06a peak one-hour.

Slides:



Advertisements
Similar presentations
PHASES OF COMPETITION Pre, In and Post Season Preparation
Advertisements

5-2. OZONE LAYER Formation of Ozone Layer  Ozone layer: A part of stratosphere (ca. 20km high) in which ozone concentration is relatively high.
Heather Simon, Adam Reff, Benjamin Wells, Neil Frank Office of Air Quality Planning and Standards, US EPA Ozone Trends Across the United States over a.
November 06, 2003 Doug Deason ExxonMobil Chemical Engineering and Manufacturing Support Houston Area Ozone Air Quality Overview of Tools, Techniques, Communications.
DOT 1 January , 1990 DOT 2 July 23 - August 3, 1990.
Appendix B.1 Phase 2 HGB Mid Course Review Time Series Plots Prepared by the Technical Support Section Technical Analysis Division TCEQ April, 2004.
Appendix B.2 Phase 2 HGB Mid Course Review Base Case One-Hour Scatter Plots Prepared by the Technical Support Section Technical Analysis Division TCEQ.
Chubaka Producciones Presenta :.
2012 JANUARY Sun Mon Tue Wed Thu Fri Sat
Appendix K Phase 2 HGB Mid Course Review Average Minimum and Maximum Temperatures from at 9 Weather Stations in East Texas and West Louisiana.
Phase Difference = Phase Difference = 0.05.
P Pathophysiology Calendar. SundayMondayTuesdayWednesdayThursdayFridaySaturday January 2012.
Ambient Air Quality Exceedance Status Air Pollution Control Division Council of Scientific Industrial Research National Environmental Engineering Research.
Monthly Composites of Sea Surface Temperature and Ocean Chlorophyll Concentrations These maps were created by Jennifer Bosch by averaging all the data.
Chicas, este calendario si es pa' nosotras !!!!!.
How Ozone is Regulated under the Clean Air Act Darcy J. Anderson AZ Dept. of Environmental Quality.
You can print this template to use it as a wall calendar, or you can copy the page for any month to add it to your own presentation. If you’d like to change.
EUROPE. September 08 to 11 September 12 to 14 September - 15.
TPB Technical Committee May 7, Forecast and Ozone Action Day Program.
FFSC Annual Meeting -- 1 Technical Committee Report  Three issues: Accounting for hedging transactions Update of Section IV Pending Changes to the Financial.
WORD JUMBLE. Months of the year Word in jumbled form e r r f b u y a Word in jumbled form e r r f b u y a february Click for the answer Next Question.
Macomb Intermediate School District PowerSchool Scheduling Series Monthly Calendar.
Methyl Bromide Update: Reregistration and Montreal Protocol April 23, 2009 Reddick Fumigants.
DATE POWER 2 INCOME JANUARY 100member X 25.00P2, FEBRUARY 200member X 25.00P5, MARCH 400member X 25.00P10, APRIL 800member.
9) P = π10) P = π/211) P = π/5; ± π/10 12) P = (2 π)/3; ± π/313) P = π/4; ± π/8 14) P = (3π 2 )/2; ±(3π 2 )/4 15) 16) 17) 18)
National Ambient Air Quality Standards Changes
Effects of Emission Adjustments on Peak Ground-Level Ozone Concentration in Southeast Texas Jerry Lin, Thomas Ho, Hsing-wei Chu, Heng Yang, Santosh Chandru,
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
ICP Modelling and Mapping, 30th Task Force 24th CCE Workshop Roma, 7 – 10 april 2014.
TEMPORAL VISUALIZATION OF DATA FROM THE FRENCH SENTINEL NETWORK.
July 2007 SundayMondayTuesdayWednesdayThursdayFridaySaturday
August Intro to Course Syllabus Read Calendar Supplies 25 Read p Read p Read p
Signalling Programme External Stakeholder Meeting on September 17, 2009.
Update on the 2015 Ozone Standard Texas Commission on Environmental Quality Environmental Trade Fair May 3, 2016.
Plot Diagram.
Technical Manuals 1002 & 1003 Updates
Cambridge IGCSE Program
Stage 4: Implementation*
Januar
Possible PM2.5 AQI Categories for Panama
Dictation practice 2nd Form Ms. Micaela-Ms. Verónica.
McDonald’s Kalender 2009.
McDonald’s Kalender 2009.
Tracking new discoveries using file history
PAIN OUT network in Mexico
McDonald’s Kalender 2009.
BSRS Program Outline & Calendar Visit the Online Student Center!
WGCV business - Future meetings and vice chair
Problem Gambling Clicks to Opgr.org
2300 (11PM) September 21 Blue line is meridian..
BSRS Program Outline & Calendar Visit the Online Student Center!
McDonald’s calendar 2007.
Strategic Planning Timeline Overview
Timetable Phase Date Collect feedback from MS on options 1, 2 and 3 presented by the EC (reporting 1b WFD-related measures for MSFD). 21 February Separate.
Proud As A Peacock! We are very proud of__________________
Teacher name August phone: Enter text here.
Section 6.3 – Polynomial Division
Tropical cyclones movement
February 2007 Note: Source:.
Academic Assessment: Data Day April 27, 2016.
McDonald’s calendar 2007.
MPH Program Department of Health Policy and Management
Announcements DS-203 Fall 2007.
Production Month Sun Hours K Monthly Kwh Tou Peak Value After Kwh
Habitat Changes and Fish Migration
2015 January February March April May June July August September
Habitat Changes and Fish Migration
North Vancouver FC U11-U12 Coach Orientation.
We’re Moving Sydney August edition Read online now.
Presentation transcript:

Appendix H Phase 2 HGB Mid Course Review Peak Ozone Isopleth Plots for August 25 - September 6 Base 5b peak one-hour concentrations CS-06a peak one-hour concentrations Base 5b peak eight-hour concentrations CS-06a peak eight-hour concentrations Prepared by the Technical Support Section Technical Analysis Division TCEQ April 2004

Peak One-Hour Ozone Isopleth Plot, August 25 Base Case

Peak One-Hour Ozone Isopleth Plot, August 25 Future Control Case

Peak Eight-Hour Ozone Isopleth Plot, August 25 Base Case

Peak Eight-Hour Ozone Isopleth Plot, August 25 Future Control Case

Peak One-Hour Ozone Isopleth Plot, August 26 Base Case

Peak One-Hour Ozone Isopleth Plot, August 26 Future Control Case

Peak Eight-Hour Ozone Isopleth Plot, August 26 Base Case

Peak Eight-Hour Ozone Isopleth Plot, August 26 Future Control Case

Peak One-Hour Ozone Isopleth Plot, August 27 Base Case

Peak One-Hour Ozone Isopleth Plot, August 27 Future Control Case Not used

Peak Eight-Hour Ozone Isopleth Plot, August 27 Base Case

Peak Eight-Hour Ozone Isopleth Plot, August 27 Future Control Case Not used

Peak One-Hour Ozone Isopleth Plot, August 28 Base Case

Peak One-Hour Ozone Isopleth Plot, August 28 Future Control Case Not used

Peak Eight-Hour Ozone Isopleth Plot, August 28 Base Case

Peak Eight-Hour Ozone Isopleth Plot, August 28 Future Control Case Not used

Peak One-Hour Ozone Isopleth Plot, August 29 Base Case

Peak One-Hour Ozone Isopleth Plot, August 29 Future Control Case

Peak Eight-Hour Ozone Isopleth Plot, August 29 Base Case

Peak Eight-Hour Ozone Isopleth Plot, August 29 Future Control Case

Peak One-Hour Ozone Isopleth Plot, August 30 Base Case

Peak One-Hour Ozone Isopleth Plot, August 30 Future Control Case

Peak Eight-Hour Ozone Isopleth Plot, August 30 Base Case

Peak Eight-Hour Ozone Isopleth Plot, August 30 Future Control Case

Peak One-Hour Ozone Isopleth Plot, August 31 Base Case

Peak One-Hour Ozone Isopleth Plot, August 31 Future Control Case

Peak Eight-Hour Ozone Isopleth Plot, August 31 Base Case

Peak Eight-Hour Ozone Isopleth Plot, August 31 Future Control Case

Peak One-Hour Ozone Isopleth Plot, September 1 Base Case

Peak One-Hour Ozone Isopleth Plot, September 1 Future Control Case

Peak Eight-Hour Ozone Isopleth Plot, September 1 Base Case

Peak Eight-Hour Ozone Isopleth Plot, September 1 Future Control Case

Peak One-Hour Ozone Isopleth Plot, September 2 Base Case

Peak One-Hour Ozone Isopleth Plot, September 2 Future Control Case

Peak Eight-Hour Ozone Isopleth Plot, September 2 Base Case

Peak Eight-Hour Ozone Isopleth Plot, September 2 Future Control Case

Peak One-Hour Ozone Isopleth Plot, September 3 Base Case

Peak One-Hour Ozone Isopleth Plot, September 3 Future Control Case

Peak Eight-Hour Ozone Isopleth Plot, September 3 Base Case

Peak Eight-Hour Ozone Isopleth Plot, September 3 Future Control Case

Peak One-Hour Ozone Isopleth Plot, September 4 Base Case

Peak One-Hour Ozone Isopleth Plot, September 4 Future Control Case

Peak Eight-Hour Ozone Isopleth Plot, September 4 Base Case

Peak Eight-Hour Ozone Isopleth Plot, September 4 Future Control Case

Peak One-Hour Ozone Isopleth Plot, September 5 Base Case

Peak One-Hour Ozone Isopleth Plot, September 5 Future Control Case Not used

Peak Eight-Hour Ozone Isopleth Plot, September 5 Base Case

Peak Eight-Hour Ozone Isopleth Plot, September 5 Future Control Case Not used

Peak One-Hour Ozone Isopleth Plot, September 6 Base Case

Peak One-Hour Ozone Isopleth Plot, September 6 Future Control Case

Peak Eight-Hour Ozone Isopleth Plot, September 6 Base Case

Peak Eight-Hour Ozone Isopleth Plot, September 6 Future Control Case