MICHELLE WILSON ARIZONA DEPARTMENT OF WEIGHTS AND MEASURES SEPTEMBER 17, 2013 Stage II Vapor Recovery Update.

Slides:



Advertisements
Similar presentations
Presented by: Yasra Adowar Petroleum Industry Regulatory Team
Advertisements

EDDIE TERRILL AIR QUALITY DIVISION DEPT. OF ENVIRONMENTAL QUALITY AUGUST 21, 2014 EPA’s 111(d) Clean Power Plan Rule: A DEQ Perspective.
November 14, 2003 Aboveground Storage Tank Enhanced Vapor Recovery.
Economic Criteria for Transmission Planning in the ERCOT Region Public Utility Law Seminar DeAnn Walker August 3, 2012.
Legislative Rule-Making Process. Three Different Processes Higher Education 29A-3A-1 et seq State Board of Education 29A-3B-1 et seq All other state agencies.
Georgia Environmental Protection Division Stage II Vapor Recovery Decommissioning Testing 1. Test Notification & Protocols 2. Test Procedures.
2010 – 2011 Budget Workshop Jessica N. Hunt, CPA Business Manager Industrial Independent School District May 27, 2010.
WELCOME: EPA PUBLIC MEETING
Thomas K. Fidler Deputy Secretary for Waste, Air and Radiation Management Department of Environmental Protection Commonwealth of Pennsylvania Proposed.
Frank Steitz Air Quality Permitting Program 10/12/2012
MassDEP Stage I Vapor Recovery Program
Unihose Dispenser Workshop June 16, 2004 Monitoring and Laboratory Division Air Resources Board California Environmental Protection Agency.
The Cost of Clean Air FEES REVISED: 2011 NACAA Membership Meeting Cleveland, OH October 5, 2011.
California Air Resources Board December 12, 2002 Enhanced Vapor Recovery Technology Review.
Gasoline Dispenser Hose Permeation Workshop November 13, 2003 Monitoring and Laboratory Division Air Resources Board California Environmental Protection.
Georgia Environmental Protection Division Stage II Gasoline Vapor Recovery Decommissioning Workshop June 11, 2014 EPD Tradeport Training Room.
Water Supply Planning Initiative State Water Commission November 22, 2004.
Vandenberg Air Force Base E-85 Fueling Facility California Air Resources Board E-85 Workshop Presented by Stu S. Webster Metcalf & Eddy 02 February 2006.
California Air Resources Board Workshop November 3, th Street, Room 202 1:30 - 3:30 p.m. Aboveground Storage Tank Enhanced Vapor Recovery.
PA Department of Environmental Protection Continuous Source Monitoring Manual (Manual, Revision 8)
Proposed Amendments to Enhanced Vapor Recovery Regulations November 18, 2004 Monitoring and Laboratory Division Air Resources Board California Environmental.
E85 Fuel Dispensing at LBNL CARB E85 Workshop, February 2, 2006 Slide # 1 Berkeley Lab’s Involvement in the California Air Resources Board’s Research and.
Enhanced Vapor Recovery Amendments Workshop September 9, 2002 Air Resources Board California Environmental Protection Agency.
OTC Attainment Planning Update SIP Steering Committee April 13, 2011.
EXPEDITED PERMIT PILOT PROGRAM STAKEHOLDER MEETING EXPEDITED PERMIT PILOT PROGRAM STAKEHOLDER MEETING Wednesday, September 13, 2006.
California Integrated Waste Management Board November 10, 2008 Item #2 Discussion And Request For Direction Regarding The Board's Fulfillment Of The Requirements.
Stationary and Area Source Committee Update OTC Committee Meeting September 13, 2012 Washington, D.C. Hall of the States 1.
Rigid Plastic Packaging Container (RPPC) Informational Update Permitting and Compliance Committee Meeting February 17, 2009.
Connecticut Department of Energy and Environmental Protection.
1 SJVAPCD DRAFT SCHEDULES May 2, Hr OZONE ATTAINMENT DEMONSTRATION PLAN PM10 ATTAINMENT DEMONSTRATION PLAN.
MLD - Proposed TP Proposed Vapor Recovery Test Procedure TP DYNAMIC PRESSURE PERFORMANCE Public Workshop, June 20, 2001 CALIFORNIA AIR RESOURCES.
Stage II Vapor Recovery Update SIP Steering Committee Meeting April 13, 2011.
Vapor Recovery Requirements for E85 Dispensing Facilities Meeting to Discuss Vapor Recovery Requirements for Facilities that Dispense E85 February 2, 2006.
2014 Program Priorities January 23, Outline Major 2014 Goals 2013 Accomplishments Major 2014 Activities Partnerships 2.
1 Improving Air Quality in the Metro. Washington Region Phil Mendelson, Chair Metropolitan Washington Air Quality Committee October 19, 2006.
Brad Miller Anna Kelley. National Ambient Air Quality Standard Update New Sulfur Dioxide Non-Attainment Area – Effective October 4, 2013 Ozone Secondary.
PUBLIC SCHOOL FINANCE UPDATE July, 2011 Leanne Emm Assistant Commissioner
Solid Waste Management Plans Update Webinar Training March 5, 2014.
1 Consideration of Final Rulemaking Clean Air Interstate Rule Environmental Quality Board Meeting Harrisburg, PA December 18, 2007 Joyce E. Epps Director,
Update on Methane Regulations Affecting Landfills Pat Sullivan Senior Vice President SCS Engineers Nov. 10, 2015.
Utility Financial Management AWWA Intermountain Section Leadership Forum Session Two November 10, 2015.
1 Public Hearing for Amendments to Rule 2020(Exemptions) Rule 4621(Gasoline Transfer into Stationary Storage Containers, Delivery Vessels, and Bulk Plants)
FINAL CLEAN POWER PLAN Before the Virginia Energy Efficiency Council Virginia Department of Environmental Quality November 12, 2015.
1 Special Information Session on USEPA’s Carbon Rules & Clean Air Act Section 111 North Carolina Division of Air Quality Special Information Session on.
Work Related to Senate Bill 2202 (effective January 1, 2001)
Engineering Evaluation Unit Monitoring and Laboratory Division California Air Resources Board (916) ABOVE GROUND STORAGE TANK (AST) VAPOR RECOVERY.
Presented at the Fifth Annual California Unified Program Conference February 6, 2003 Enhanced Vapor Recovery Cindy Castronovo Air Resources Board Cal-EPA.
1 Draft Landfill Methane Control Measure California Air Resources Board April 22, 2008.
 To discuss MassDEP’s draft revisions to the following regulations:  Stage II – 310 CMR 7.24(6)  Stage I – 310 CMR 7.24(3)  Definitions – 310 CMR.
1 Pat Bennett Engineering Evaluation Section Monitoring and Laboratory Division California Air Resources Board Aboveground Storage Tank Enhanced Vapor.
Amendments to 25 Pa. Code Chapters 121 and 123: Final-form Rulemaking: Commercial Fuel Oil Sulfur Limits for Combustion Units Environmental Quality Board.
Final Rulemaking: 25 Pa. Code Chapters 121 and 139 Measurement and Reporting of Condensable Particulate Matter Emissions Environmental Quality Board Meeting.
Ozone Redesignation Substitutes for the HGB and DFW Areas
Final Rulemaking Nonattainment Source Review 25 Pa. Code, Chapter 121
Petroleum Storage Tanks – Program Updates
Consideration of Final Rulemaking
July 13, 2016 Department of Environmental Quality Proposed Amendments to UST Rules 15A NCAC 02N and 02O Ruth Strauss.
September 8, 2016 Department of Environmental Quality Proposed Amendments to UST Rules 15A NCAC 02N and 02O Ruth Strauss.
Methane Emission Standards for Crude Oil and Natural Gas Facilities
Arizona Regional Haze State Implementation Plan
College of Alameda Integrated Planning and Budgeting Process
CAIR Replacement Rule and Regional Haze
Julie Woosley, Division of Waste Management
Department of Environmental Quality
Temporary Rulemaking for 15A NCAC 02L Section .0400
Julie Woosley, Division of Waste Management
PUBLIC SCHOOL FINANCE UPDATE November, 2011
2020 Fiscal Year Budget Calendar.
WESTAR Staff Reports Technical Coordinator Report
Budget and Legislative Request
Presentation transcript:

MICHELLE WILSON ARIZONA DEPARTMENT OF WEIGHTS AND MEASURES SEPTEMBER 17, 2013 Stage II Vapor Recovery Update

Agenda Background Update on SIP Overview of proposed statutory changes Decommissioning process

Overview Source: California Air Resources Board

Background EPA widespread use determination Stakeholder meeting November 30, 2012 Response to workshop comments February 19, 2013 On AZDWM website

Proposed Schedule Action Anticipated Date Prepare and submit the SIP revision removing the Stage II program from the SIP January to December 2013 Modify the applicable statute(s) requiring the use of Stage II vapor recovery equipment January to September 2014 EPA Review/Approval of SIP January 2014 to July 2015 Modify rules to reflect decommissioning of Stage II and requirements for remaining Stage I systems January 2014 to July 2015 Decommission Stage II equipment January 1, 2016 to December 31, 2017

Overview of MAG 2013 SIP Revision to Remove Stage II Controls Clean Air Act Section 110(l) requires that the removal of Stage II controls cannot interfere with attainment of the ozone standard Beginning in 2018, Stage II controls no longer provide areawide emission reductions Removal of Stage II controls is proposed for new gasoline dispensing stations beginning in 2014 and for all stations beginning in 2016 (must be approved by EPA prior to implementation) Federal emissions standard for portable fuel containers (gas cans) used as an offset for Stage II benefits in years Total mobile source emissions still decline each year after 2013 despite removal of Stage II controls

Tentative Schedule for MAG 2013 SIP Revision to Remove Stage II Controls September 20, 2013 – Draft revision available for public review October 21, 2013 – Public hearing October 24, 2013 – MAG Air Quality Technical Advisory Committee recommendation November 6, 2013 – MAG Management Committee recommendation December 4, 2013 – MAG Regional Council adoption of the revision December 6, 2013 – MAG submission of the revision to ADEQ and EPA

Proposed Legislative Changes Legislation needed to remove Stage II Draft legislation for next session Remove Stage II requirements as approved by EPA, while preserving Stage I requirements

Installation Current statute requires  Installation of CARB-approved Stage I/II equipment; or  Equipment tested and approved by an independent third party Proposed future revision:  Remove references to Stage II  Effective 2014 or when approved by EPA for new stations  Stage I equipment – status quo Savings for new stations- $20,000 - $55,000 per station

Repair/Replacement Savings Remove references to Stage II equipment. Maintain CARB-certified equipment for Stage I. Cost for Hanging Hardware Conventional vs Stage II (Per Nozzle) Component Conventional Cost ($) Stage II Cost ($) Vapor Assist Stage II Cost ($) Balance Stage II Cost ($) Healy Nozzles Primary Hose Whip Hose Breakaway Total Price depends on equipment/contractor, does not include labor costs

Additional Savings  Annual testing of Stage II equipment will no longer be required after decommissioning  Cut down on testing time and time site is shut down  Maintenance fees associated with vapor recovery failures

Other General Requirements  Retain Stage I vapor recovery requirements in areas A and B  Retain annual testing of Stage I vapor recovery in area A  Require AZDWM to establish rules for capping and closing Stage II vapor recovery systems

Proposed Decommissioning Process To be developed during rulemaking Ample notice prior to decommissioning so stations can prepare and budget By station license number (BMF Number)  50% during 2016, 50% during 2017 During same month as annual test AZDWM to witness/inspect post testing Scheduled utilizing Vapor Recovery Scheduler that Registered Vapor Representatives (RSRs) already use

Proposed Decommissioning Process Cont… Petroleum Equipment Institute Recommended Practice (PEI/RP300-09)  Relieve pressure in tank ullage  Drain liquid collection points  Disconnect and drain vacuum motors / reprogram dispensers  Disconnect and seal below-grade vapor piping at dispenser  Disconnect and seal vapor piping at tank top  Only if can be done without excavation  Replace hanging hardware  Remove Stage II operating instructions from dispensers  Conduct testing to ensure Stage I is working properly Checklist to be completed by RSR

Comments Requested  (A) currently requires use of vapor recovery equipment certified by California Air Resources Board (CARB) as of March 31, 2001,or after that date.  Certified before March 31, 2001 = Pre-EVR equipment  Certified after March 31, 2001 = EVR equipment  EVR equipment certified with higher vapor control  Comments Requested:  Should new stations and stations with major modifications be required to install Stage I Enhanced Vapor Recovery Equipment?

CARB EVR Executive Orders

Why Require Stage I EVR at New/Modified Sites? Many, if not most, install Stage I EVR equipment Estimated cost difference between $ per tank If EVR is required in future as an ozone control, sites from 2014 to that time will already have equipment, preventing the need to break concrete for retrofits

Conclusion MAG is on schedule for SIP submittal by end of the year AZDWM is on schedule for statute revision next legislative session New sites – Stage II not required 2014 or after EPA approval, whichever later Existing sites – decommission 2016/2017 Rule development to begin 2014

Questions/Comment Michelle Wilson Arizona Department of Weights and Measures