ISQA 459 Mellie Pullman 1.  JIT can be defined as an integrated set of activities designed to achieve high-volume production using minimal inventories.

Slides:



Advertisements
Similar presentations
Lean Manufacturing & Just-in-Time
Advertisements

Just-in-Time Inventory Management Definition: Produce the right items in the quantities needed by subsequent processes at the time needed. Goals: Eliminate.
Inventory Kanbans Automating the Replenishment Cycle
14–1. 14–2 Chapter Fourteen Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Lean Supply Chains Chapter Fourteen McGraw-Hill/Irwin
JIT AND LEAN PRODUCTION SYSTEM BY AMAR P. NARKHEDE.
Dependent Inventory: Material Requirements Planning BA 339 Mellie Pullman.
Chapter 9: Lean Manufacturing © Holmes Miller 1999.
Chapter 12 Lean Manufacturing.
Just-in-Time. © The McGraw-Hill Companies, Inc., 2004 B Operations -- Prof. Juran2 Outline The Goal debrief JIT Defined The Toyota Production.
Just-in-Time and Lean Systems
Operations Management Just-in-Time Systems Supplement 12
© The McGraw-Hill Companies, Inc., Chapter 11 Just-in-Time and Lean Systems.
Just-In-Time Philosophy
Just-In-Time Systems. History and Philosophy of Just- In-Time A philosophy that seeks to eliminate all types of waste, including carrying excessive levels.
Chapter 16 - Lean Systems Focus on operations strategy, process, technology, quality, capacity, layout, supply chains, and inventory. Operations systems.
CHAPTER 14 Just-In-Time Systems.
S12-1 Operations Management Just-in-Time and Lean Production Systems Chapter 16.
JIT and Lean Operations
McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved. 1.
JIT and Lean Operations. MRP (push) and JIT (pull) system PULL SYSTEM PUSH SYSTEM A PUSH system where material is moved on to the next stage as soon as.
Lean and Sustainable Supply Chains. 1. Describe how Green and Lean can complement each other. 2. Explain how a production pull system works. 3. Understand.
Operations Management BA 301 – Spring 2003 Just-in-Time Systems Supplement 12.
Operations Management
1 Chapter 16 Just-In-Time Systems. 2 JIT/Lean Production Just-in-time: Repetitive production system in which processing and movement of materials and.
JIT and Lean Operations
Just-In-Time Philosophy
Just-in-time Prof. Jiang Zhibin Dept. of IE, SJTU.
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved.
The philosophy of JIT can be traced back to Henry Ford, but formalized JIT originated in Japan as the Toyota Production System. W. Edwards Deming’s lesson.
Lean Production - Objectives
MBA.782.J.I.T.CAJ Operations Management Just-In-Time J.I.T. Philosophy Characteristics of J.I.T. J.I.T. in Services J.I.T. Implementation Issues.
© 2004 by Prentice Hall, Inc., Upper Saddle River, N.J Operations Management Just-in-Time and Lean Systems Chapter 16.
© 1997 Prentice-Hall, Inc Principles of Operations Management Just-In-Time Systems Chapter 11.
Just-in Time Management Supplier Partnerships B7801 April 17, 1998
Manufacturing.  Manufacturing is all about converting raw material into consumer or industrial products.  A firms manufacturing competency is based.
Just-In-Time & Lean Systems
Chapter 13 Lean Systems This presentation covers the material in Chapter 13 - Lean Systems.
Just-in-Time and Lean Systems
McGraw-Hill/Irwin © 2003 The McGraw-Hill Companies, Inc., All Rights Reserved. 1 LEAN SYSTEMS TOOLS AND PROCEDURES.
Chapter 12 Just-in-Time and Lean Manufacturing. What is JIT? (Just-in-Time) An operations philosophy involving many techniques for improving the effectiveness.
13 Just-In-Time Production Management philosophy Pull system though the plant WHAT IT IS Employee participation Industrial engineering/basics Continuing.
The philosophy of JIT can be traced back to Henry Ford, but formalized JIT originated in Japan as the Toyota Production System. W. Edwards Deming’s lesson.
Lean and Sustainable Supply Chains
Lean Production and the Just-in-Time Philosophy. Lean Production Elimination of All Waste – Waste is Anything that Does Not Add Value to Product. Continuous.
1 Slides used in class may be different from slides in student pack Chapter 12 Just-in-Time and Lean Systems  JIT Defined  The Japanese Approach to Productivity.
1 Slides used in class may be different from slides in student pack Chapter 12 Lean/Just-in-Time (JIT) Production  JIT Defined  The Japanese Approach.
1 Just-in-time. 2 Supply Networks  organisations connected by server-client links - upstream/downstream - that service processes & activities (operations)
1-1 McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved 1 Chapter 12 Lean Manufacturing (Just-in-Time)
JIT and Lean Operations Group Members:. JIT/Lean Production Just-in-time (JIT): A highly coordinated processing system in which goods move through the.
Module 9: JIT & Lean Systems Operations Management as a Competitive Weapon.
Lab #4: Pull and Perfection MG/IE 3400 – Production System Design.
Operations Fall 2015 Bruce Duggan Providence University College.
© The McGraw-Hill Companies, Inc., Just-in-Time and Lean Systems.
Production and Operations Management: Manufacturing and Services
EMBA-2, BUP EO Just-in-Time / Lean Production.
CHAPTER 15 LEAN SYSTEM. THE CONCEPTS Operation systems that are designed to create efficient processes by taking a total system perspective Known as zero.
Purposes of Inventory 1. To maintain independence of operations. 2. To meet variation in product demand. 3. To allow flexibility in production scheduling.
8.0 LEAN Chuah Shu Chin B Jennise Tan Teng Teng B Yeow See Leong B
McGraw-Hill/Irwin Copyright © 2013 by The McGraw-Hill Companies, Inc. All rights reserved. Lean Supply Chains Chapter 12.
1 © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved Chapter 12 Lean Production.
16-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
Lean Manufacturing CHAPTER 9. After completing the chapter you will:  Learn how a production pull system works  Study Toyota Production System concepts.
CHAPTER 9 Lean Manufacturing.
Chapter 12 Lean Production. Chapter 12 Lean Production.
McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved
Chapter 12 Just-in-Time and Lean Systems
MODERN TRENDS IN PRODUCTION ENGINEERING
Chapter 12 Lean Production. Chapter 12 Lean Production.
JIT(JUST-IN-TIME) VARUN BABU
Presentation transcript:

ISQA 459 Mellie Pullman 1

 JIT can be defined as an integrated set of activities designed to achieve high-volume production using minimal inventories (raw materials, work in process, and finished goods).  JIT also involves the elimination of waste in production effort.  JIT also involves the timing of production resources (e.g., parts arrive at the next workstation “just in time”). 2

 Elimination of waste  Efforts concentrated on shop floor  Respect for people  Quality improvement focus 3

(1) Waste from overproduction (2) Waste of waiting time (3) Transportation waste (4) Inventory waste (5) Processing waste (6) Waste of motion (7) Waste from product defects 4

5 Customers Sub Fab Vendor Final Assembly

6 Final Assembly Coordination System Integration

7 A B C A C B Sporadic and Infrequent Deliveries from Individual Suppliers

8 A B C ABC Regular and Frequent Deliveries from Many Suppliers

 Using Departmental Specialization for plant layout can cause a lot of unnecessary material movement. 9 Saw LathePress Grinder Lathe Saw Press Heat Treat Grinder

 Revising by using Group Technology Cells can reduce movement and improve product flow. 10 Press Lathe Grinder A 2 B Saw Heat Treat LatheSaw Lathe Press Lathe 1

11 Not uniformJan. UnitsFeb. UnitsMar. UnitsTotal 1,2003,5004,3009,000 UniformJan. UnitsFeb. UnitsMar. UnitsTotal 3,0003,0003,0009,000 Suppose we operate a production plant that produces a single product. The schedule of production for this product could be accomplished using either of the two plant loading schedules below. How does the uniform loading help save labor costs? or

 Company produces three products with a mixed model assembly line.  Operates 16 hours per day for 250 days/yr.  Determine the mixed model MPS for a daily batch.  Determine minimum batch MPS and the mix schedule for a day. ProductsForecasts (year) 120, ,000 35,000 12

#1#2#3 Year Forecast Daily Batchdivide by Hourly Batchdivide by Minimum Batch MPS For every unit of #3 (minimum batch), we need twice as many #2 and 4 times As many #1 so for minimum batch: Produce during each day produce #1,1,1,1,2,2,3 - repeated 20 times

 Company produces four products with a mixed model assembly line.  Operates 8hours per day for 250 days/yr.  Determine the mixed model MPS for a daily and hourly batch.  Determine mix schedule for a day. ProductsForecasts (year) I500 II1500 III4500 IV

15 Management philosophy “Pull” system though the plant WHAT IT IS Employee participation Industrial engineering/basics Continuing improvement Total quality control Small lot sizes WHAT IT REQUIRES Attacks waste Exposes problems and bottlenecks Achieves streamlined production WHAT IT DOES Stable environment WHAT IT ASSUMES

16 Work in process queues (banks) Change orders Engineering design redundancies Vendor delinquencies Scrap Design backlogs Machine downtime Decision backlogs Inspection backlogs Paperwork backlog Example: By identifying defective items from a vendor early in the production process the downstream work is saved. Example: By identifying defective work by employees upstream, the downstream work is saved.

17 Storage Part A Machine Center Assembly Line Material Flow Card (signal) Flow Withdrawal kanban Production kanban

 Setting up a kanban system requires determining the number of kanbans (or containers) needed.  Each container represents the minimum production lot size.  An accurate estimate of the lead time required to produce a container is key to determining how many kanbans are required. 18

19 k = Number of kanban card sets (a set is a card) d = Average number of units demanded over some time period L = lead time to replenish an order (same units of time as demand) S = Safety stock expressed as a percentage of demand during lead time C = Container size

 A switch assembly is assembled in batches of 4 units from an “upstream” assembly area and delivered in a special container to a “downstream” control-panel assembly operation.  The control-panel assembly area requires 5 switch assemblies per hour.  The switch assembly area can produce a container of switch assemblies in 2 hours.  Safety stock has been set at 10% of needed inventory. 20

21 Always round up!

 Link operations  Balance workstation capacities  Re-layout for flow  Emphasize preventive maintenance  Reduce lot sizes  Reduce setup/changeover time 22

 Standard product configuration  Standardize and reduce number of parts  Process design with product design  Quality expectations 23

 Level payrolls  Cooperative employee unions  Subcontractor networks  Inverted pyramid management style  Small group involvement activities 24

 Worker responsibility  Measure SQC  Enforce compliance  Fail-safe (Poke-yoke) methods  Automatic inspection 25

 Damaged parts  Missing parts  Reversed parts  Wrong parts  Wrong size or shape  Wrong chemical properties  Wrong physical properties  Wrong item shipped  Wrong label  Wrong package  Damaged finished product  Omitting a part  Omitting a process  Performing a process incorrectly  Performing a process on the wrong part  Performing a process in improper environmental conditions  Performing the wrong process  Setting up equipment incorrectly  Setting up a work piece incorrectly  Adjusting equipment incorrectly  Tooling set up incorrectly  Tooling adjusted incorrectly  Installing wrong part  Installing part incorrectly 26 DEFECTSMISTAKES

 Reduce lead times  Frequent deliveries  Project usage requirements  Quality expectations 27

 Look for other areas where inventory hides  Stores  Transit  Carousels  Conveyors 28

29 MRP is a planning system that does not do detailed shop floor schedulingMRP is a planning system that does not do detailed shop floor scheduling MRP requires fixed lead times which might actually vary with batch sizeMRP requires fixed lead times which might actually vary with batch size JIT excels at rapidly moving small batches of material through the systemJIT excels at rapidly moving small batches of material through the system

30 1.MRP “buckets” are reduced to daily or hourly The most common planning period (time bucket) for MRP systems is weeklyThe most common planning period (time bucket) for MRP systems is weekly 2.Planned receipts are used internally to sequence production 3.Inventory is moved through the plant on a JIT basis 4.Completed products are moved to finished goods inventory which reduces required quantities for subsequent planned orders Back flushing based on the BOM is used to deduct inventory that was used in production Back flushing based on the BOM is used to deduct inventory that was used in production

31 Used in repetitive operationsUsed in repetitive operations MRP plans are executed using JIT techniques based on “pull” principlesMRP plans are executed using JIT techniques based on “pull” principles Flows are carefully balanced with small lot sizesFlows are carefully balanced with small lot sizes

32 Items used by many products are held in a common area often called a supermarketItems used by many products are held in a common area often called a supermarket Items are withdrawn as neededItems are withdrawn as needed Inventory is maintained using JIT systems and proceduresInventory is maintained using JIT systems and procedures Common items are not planned by the MRP systemCommon items are not planned by the MRP system