EOW-x improves efficiency in 24-7 operations Alert and focused operators make fast and correct decisions Lena Nyberg Marketing Communication Operator Effectiveness.

Slides:



Advertisements
Similar presentations
The IT Staff of the Future: The Importance of IT Business Alignment for Staff Development Katherine Spencer Lee Executive Director Robert Half Technology.
Advertisements

Corporate Brochure. We are professional manufacture and supplier of building products focusing mainly on masonry related products. We are committed.
Business Development Suit Presented by Thomas Mathews.
ACTIVITY BASED OFFICE There is a lot of changes in working culture – and these are seen by us as a thrilling opportunity. The spread of mobile working.
Product Hawick High School Higher and Intermediate 2 Product Design Folios and Projects Name: ______________________ Tutor Group: ______.
Some questions o What are the appropriate control philosophies for Complex Manufacturing systems? Why????Holonic Manufacturing system o Is Object -Oriented.
LP-31 Series Uninterruptible Power Supply Product Management GE Consumer & Industrial Power Protection.
Innovative Design Presented by: M. Y. Wong We easily come across terms such as: o Fashion design o Hair design o Interior design o Garden design. But.
1 COLD CALLING & NEW ACCOUNTS  Finding New Business is The biggest Challenge We Face in Sales  The Days of Showing up on the doorstep and getting a meeting.
Foreword of the presentation used by CGM at ABB event
Unrestricted © Siemens AG All rights reserved. The Digital Factory – Enabling a Holistic Approach to Automation MIT Industrial IoT Workshop – October.
Virtual Event Solutions When Webconferencing is not the Right Tool Enterprises are turning to webcasting and virtual events to deliver their message to.
E C O L O G I C A L E T H I C S copyright K. Arnold, August 2007 in lighting design.
INDUSTRIAL & SYSTEMS ENGINEERING
Why Study Management? The better you can work with people, the more successful you will be in both your personal and your professional lives. –Employers.
DRIVING INNOVATION AND ABILITY TO COMPETE THROUGH OUTSOURCING Anthony (Tony) C. Bernardo, Alloy Polymers Inc. NPE 2003 bernardo:
Engineering Design Process
Revised FR :35 EST Created TH Lesson 00. How to Navigate through the Instruction / Bringing Learners and Library Skills Together.
Tips on How to Avoid Problems with PowerPoint Presentations Society of Government Meeting Professionals (SGMP) Chicago Chapter.
Day 2 Shawn Rudolph Regional Implementation Coordinator.
Getting Green Building Automation. Why is Building Automation a Green Technology? There are programs starting all over the nation that focus on alternative.
This is your 30-Second Employer Training: Employment Basics ENJOY Click here to begin Good Day!
Copyright 2005 – Kristen S. Kurland, Carnegie Mellon University Managing Furniture and Equipment Assets.
Captcha Soft solutions Pvt Ltd is a recognized name in the web design industry. For the past three years, we’ve been doing what we love: inventing, conceptualizing,
Human Resource The Recruitment Agency. ABOUT US HRRA (Human Resource Recruitment Agency) is an independent company specializing in staff recruitment since.
1 Sales Academy Training Inner Range Product Advantages, Competitors & The Future.
The evolution of HR David Woodward Chief Information Officer.
Report Prepared for Envision Presented by: Kristen Vargas Rossana Figuera Yinka Osidein.
Concepts of Engineering and Technology Copyright © Texas Education Agency, All rights reserved.
Chapter 4 Information, Management, and Decision Making.
Interaction Design CMU. Today’s objectives Continue Design approaches (UCD, ACD)  User-Centered Design  Activity-Centered Design.
KNX – the benefits. Schneider Electric 2 - IS&C – Aug Content ●Basic arguments ●Added value for: ●Investors ●Wholesalers ●Installers and System.
virtual reality (VR) or virtual environment (VE), computer-generated environment with and within which people can interact. It is an artificial environment.
The Itron logo is integrated into the background and can not be modified, moved, added to, or altered in any way. Slide Heading Style 24pt Arial Regular.
Education 6714 Gayla Fisher.  “ The central practical premise of UDL is that a curriculum should include alternatives to make it accessible and appropriate.
Energy Efficiency and Emission Management Edwin van den Maagdenberg Vice President Technology and Operations Honeywell Process Solutions.
© Copyright year ABB. All rights reserved BSE033264R0001, Industrial IT for improved productivity.
The Innovation Process Assembled by Arsene Kodjo.
1 let us help you create P.O Box No Dubai Media City Dubai United Arab Emirates T web.
MARKETING experts INDUSTRY Some of our clients. Marketing translation is not just about translating the text into the target language, it’s about conveying.
Background to and aims of the Regional Innovation Fund Healthier Horizons.
Policy 2 By Dr. Muhammad Zia-ur-Rehman
Leeds University Business School Dr Des Leach & Dr Matthew Davis Factories of the Future PPP Ideas for proposals The Socio-Technical Centre (STC) is a.
By Dinesh Bajracharya Nepal Strategic roles of Information system.
Session I: Looking Closely: Considering Your Lessons through the Lens of the New Fine Arts TEKS PRESENTERS: Mark Gurgel & Dr. Mackie Spradley.
HRD IN GOVERNMENT ORGANIZATIONS AND PUBLIC SECTOR SUBMITTED TO: Ms. KAMALPREET KAUR SUBMITTED BY: PRABHJOT KAUR M.COM FINAL(3001)
Unit 1: Health IT Teams Examples and Characteristics Component 17/ Unit 11 Health IT Workforce Curriculum Version 1.0/Fall 2010.
Science K–10 Early Stage 1 outcome A student: Stage 1 outcome A student: Stage 2 outcome A student: Stage 3 outcome A student: Stage 4 outcome A student:
Management Approaches. Construction Management Customer appoints Design team and Management team.
Elementary School Administration and Management GADS 671 Section 55 and 56.
Process, Power and Marine Division Integrating Tools and Work Processes SmartPlant 3D and GTSTRUDL Robert Christian Design System Business Development.
Introducing Design and Technologies. Victorian Curriculum F–10 Released in September 2015 as a central component of the Education State Provides a stable.
Audience Profiles RoleKey CharacteristicsValues & NeedsRecommendations C-Level Execs Challenge and opportunity is to capitalize on executives’ critical.
Lighting facts.  Lighting can be a big energy consumer in offices and production areas and experience shows that energy savings may be achieved - often.
ANASOFT VIATUS. Challenges Supply chain optimization is necessary for achieving competitive price of final products Synchronization and utilization of.
Welcome to our webinar! Here are some directions for you… When you first join a session, the Control Panel appears on the right side of your screen. Use.
Statewide Marketing, Education, and Outreach ALJ Steve Roscow CPUC April 14,
KiloBytes Technologies “New Face Of Technology” / Website: SEOwww.kilobytes.inSEO.
Marketing II Chapter 2: Company and Marketing Strategy Partnering to Build Customer relationships
Session 3 Web 2.0 Tools: SymbalooEdu and Other Sites to Support Personalization and Differentiated Learning Opportunities Stephanie Dulmage, 2014.
Internet technician In this file, you can ref all information for internet technician such as: interview questions and answers, interview tips, job interview.
As one of the only true Turn Key office interiors firm, SPANDAN has been successfully meeting the facility needs of leading companies since we specialize.
Next Generation PDF and the PDF Association
ICT PSP 2011, 5th call, Pilot Type B, Objective: 2.4 eLearning
Control Room Consoles, Technical Furniture & Equipment
See the short ABB Control Room Ergonomics movie
2nd Year: Achieving depth Depth in projects
Facilities Planning and Design Course code:
PeopleSoft Grants Julie Gustafson Product Strategy Manager
Technology Management derived from the definition of Technology Management is as follows: Information Technology Management is concerned with: exploring.
Presentation transcript:

EOW-x improves efficiency in 24-7 operations Alert and focused operators make fast and correct decisions Lena Nyberg Marketing Communication Operator Effectiveness for System 800xA

Integrated operations for increased operator effectiveness  The Extended Operator Workplace has true advantages:  Empowering operator alertness  Improve correct & fast decision-making  Reduce unnecessary downtime  Attract the new generation of operators  Increase each operators efficiency  Increase the possibility to share information  Create attractive 24-7 environments and prevent operators boredom and fatigue Best utilization of space At least 30% space reduction compare to traditional solutions Superior intelligent ergonometric

Maximum attention to the operator and the operation  Solutions with 800xA and EOW-x for integrated operations  Enables the operator to take on a more strategic role and truly become the pilot of the plant  Support process industry visions about plant wide collaboration and optimization  The result is improved productivity and energy effectiveness  Early and extended involvement  By involving ABB at an early stage customers can receive layout proposals and pre-study services for the control room and adjacent areas for new or remodeled control rooms which will result in the latest and most advanced environments and solutions.  ABBs involvement with Human Factors and Ergonomic research will ensure the customer the best possible and efficient control room environment.  The high level of integration in the EOW-x concept create a small footprint and save costs.  Improve operator effectiveness and safety with the EOW-x concept  Analyses and evaluations of operators environment and technology solutions are resulting in expected findings of 5-10 % increased operator effectiveness The following slides show some planning examples with the space efficient EOW-solution

Early planning interaction is cost & time effective and creates the best long term solution Less active operators is needed in a modern CCR but they are higher educated with good competence CapEx show significant cost reduce by using the EOW-x concept compare to many traditional screen setups

Example of CGM involvement with ABB in a green field project Next slide shows a result after CGM has received more information about the actual project

The previous layout and this new layout contains much improvements for the whole control room building

We provide our customers with a cost efficient planning solution early in projects with the latest Human Factors, instead of just responding to a RFQ. Download the ABB demo 3D SketchUp model from this linkthis link Uncompress the zip file on your hard disc and open it with Google SketchUp that can be downloaded from this linkthis link

The EOW-x concept improves effectiveness and is the foundation for Power of Integration Latest information regarding the EOW concept is always available on CGM:s web page by using this link  Improved situation awareness  State of the art ergonometrics  Integrated lighting & sound systems  Support for CCTV & Telecom integration  Small footprint for cost effective planning  Motivating and stimulating for operators

Example on how simplified situation awareness could appear in abnormal situations Completely controlled by 800xA By using this link you can explore our Future Operation Centre (FOC) we built up with ABB

The EOW-x concept with 800xA offers the best collaborative layout including complete control room solutions from the process plant floor up to the boarder room This link provides 150 layouts which can be useful to contribute ideas for early control room planning.

Download the CGM-brochure to read more detailed about CGM and the wide range of operator desk systems and other loose interior products for 24/7 environments. Designed to keep operators alert during monotony and calm in emergencies. Our operator desks and auxiliary products are bio- mechanically optimized, aesthetically pleasing and built to last. CGM offers, in addition to the ABB unique EOW-x concept, three different series of operator desk systems and other furniture's for adjacent areas outside the control room. CGM Class I SUPER-PREMIUM™ 24/7 operator desk systemCGM Class III UNIVERSAL™ operator desk systemCGM Class II SUPERIOR™ 24/7 operator desk system CLICK HERE TO DOWNLOAD THE PDF BROCHURE