1 10/15/05T. Awes EMCal Test Beam Measurements Goals: –Measure Energy Response Resolution Linearity –Position Resolution –Shower shapes  /h separation.

Slides:



Advertisements
Similar presentations
Kondo GNANVO Florida Institute of Technology, Melbourne FL.
Advertisements

1 ALICE EMCal Electronics Outline: PHOS Electronics review Design Specifications –Why PHOS readout is suitable –Necessary differences from PHOS Shaping.
CALICE WHCAL testbeam at SPS H8 27 sep – 03 oct: 6 days for energies up to 180 GeV (+ polarity)
Using the EUDET pixel telescope for resolution studies on silicon strip sensors with fine pitch Thomas Bergauer for the SiLC R&D collaboration 21. May.
Alice EMCAL Meeting, July 2nd EMCAL global trigger status: STU design progress Olivier BOURRION LPSC, Grenoble.
1Calice-UK Cambridge 9/9/05D.R. Ward David Ward Compare Feb’05 DESY data with Geant4 and Geant3 Monte Carlos. Work in progress – no definitive conclusions.
PHOS data taking status - lessons learned/implications for EMCAL Outline Recent work in PHOS CERN, May and June 2007 (PHOS & EMCAL team; Josh, Lamia,
6 June 2002UK/HCAL common issues1 Paul Dauncey Imperial College Outline: UK commitments Trigger issues DAQ issues Readout electronics issues Many more.
Summary Ted Liu, FNAL Feb. 9 th, 2005 L2 Pulsar 2rd IRR Review, ICB-2E, video: 82Pulsar
Jianchun (JC) Wang, 08/21/99 RICH Electronics and DAQ Chip Carrier Short Cable Transition Board Long Cable Data Board Crate J.C.Wang Syracuse University.
October-November 2003China - ALICE meeting1 PHOS in ALICE A PHOton Spectrometer with unique capabilities for the detection/identification of photons and.
Reports from DESY Satoru Uozumi (Staying at DESY during Nov 11 – 25) Nov-21 GLDCAL Japan-Korea meeting.
06/03/06Calice TB preparation1 HCAL test beam monitoring - online plots & fast analysis - - what do we want to monitor - how do we want to store & communicate.
SPiDeR  SPIDER DECAL SPIDER Digital calorimetry TPAC –Deep Pwell DECAL Future beam tests Wishlist J.J. Velthuis for the.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
David N. Brown Lawrence Berkeley National Lab Representing the BaBar Collaboration The BaBar Mini  BaBar  BaBar’s Data Formats  Design of the Mini 
Thomas Jefferson National Accelerator Facility Page 1 EC / PCAL ENERGY CALIBRATION Cole Smith UVA PCAL EC Outline Why 2 calorimeters? Requirements Using.
1 Status of the calorimeter PMT’s time alignment LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Introduction Development status of the PMT time.
Setup for hypernuclear gamma-ray spectroscopy at J-PARC K.Shirotori Tohoku Univ. Japan for the Hyperball-J collaboration J-PARC E13 hypernuclear  -ray.
1 MICE Tracker Readout Update, Preparation for Cosmic Ray Tests Cosmic Ray Tests at RAL AFE-IIt Firmware Development VLSB Firmware Development Summary.
11 Sep 2009Paul Dauncey1 TPAC test beam analysis tasks Paul Dauncey.
STAR Collaboration Meeting, Nantes Alexandre A. P. Suaide Wayne State University Slide 1 EMC Commissioning for the run Review of last.
1 Calice UK Meeting 27/03/07David Ward Plans; timescales for having analysis results for LCWS Status of current MC/data reconstruction Reconstruction status;
EMCal in ALICE Norbert Novitzky 1. Outline How Electro-Magnetic Calorimeters works ? Physics motivation – What can we measure with Emcal ? – Advantages.
4 th Workshop on ALICE Installation and Commissioning January 16 th & 17 th, CERN Muon Tracking (MUON_TRK, MCH, MTRK) Conclusion of the first ALICE COSMIC.
PWG3 Analysis: status, experience, requests Andrea Dainese on behalf of PWG3 ALICE Offline Week, CERN, Andrea Dainese 1.
EMCal Status ALICE Technical Board November 20, 2008 News Schedule.
News on GEM Readout with the SRS, DATE & AMORE
HBD electronics status All the ADC and XMIT boards are installed. –Top 3 crates are for the ADC, XMIT boards –Bottom crate is for test pulse boards/future.
E. GaruttiCALICE collaboration meeting, Prague CERN Test beam (part II) Erika Garutti, Fabrizio Salvatore.
01/04/09A. Salamon – TDAQ WG - CERN1 LKr calorimeter L0 trigger V. Bonaiuto, L. Cesaroni, A. Fucci, A. Salamon, G. Salina, F. Sargeni.
EMCAL : Online Software Status 1) General info/intro 2) DCS-related: detector configuration, Data Points 3) DAQ: Detector Algorithms 4) QA, AMORE 5) Offline-related:
12 October 2001, M. LefebvreHEC-Athena Tutorial: HEC beam test primer1 HEC Beam Test Primer Production modules of the HEC have been tested in particle.
S.MonteilCOMMISSIONING1 PS/SPD ELECTRONICS OUTLINE 1)STATUS OF PS/SPD FE BOARDS PRODUCTION 2)PHASES OF PS/SPD COMMISSIONING 1)LEDs AND DETECTORS 2)TUBES.
first results from EMCal test beam
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
Kevin Nash MaPSA-Light test system 1. The System 2.
Update on the HBD Craig Woody BNL DC Meeting May 11, 2005.
STAR Collaboration Meeting, BNL – march 2003 Alexandre A. P. Suaide Wayne State University Slide 1 EMC Update Update on EMC –Hardware installed and current.
STAR Analysis Meeting, BNL – oct 2002 Alexandre A. P. Suaide Wayne State University Slide 1 EMC update Status of EMC analysis –Calibration –Transverse.
ALICE Collaboration Meeting LBNL, Oct 15-16, 2005 An EMC for ALICE1 Trigger Peter Jacobs, LBNL  0 : 10 Hz  p T ~20 GeV/c Inclusive jets: 10 Hz  E T.
ScECAL Beam FNAL Short summary & Introduction to analysis S. Uozumi Nov ScECAL meeting.
October Test Beam DAQ. Framework sketch Only DAQs subprograms works during spills Each subprogram produces an output each spill Each dependant subprogram.
Summary of User Requirements for Calibration and Alignment Database Magali Gruwé CERN PH/AIP ALICE Offline Week Alignment and Calibration Workshop February.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
Muons at CalDet Introduction Track Finder Package ADC Corrections Drift Points Path Length Attenuation Strip-to-Strip Calibration Scintillator Response.
1 Tracker Software Status M. Ellis MICE Collaboration Meeting 27 th June 2005.
PHOS offline status report Yuri Kharlov ALICE offline week 7 July 2008.
EMCAL Calibration & Assembly at Yale University Mark Heinz, Project Mgr EMCAL Meeting Nantes July 15, 2008.
STAR Simulation. Status and plans V. Perevoztchikov Brookhaven National Laboratory,USA.
D. Silvermyr, ORNL1 Test Beam - Outline FNAL/Test Beam I (Nov 2005) Results overview from Test Beam I Test Beam II – SPS and PS (Sep – Oct 2007) Current.
MINER A at the Triple Point: Three Phases at once Deborah Harris AEM August 31, 2009.
Upgrade with Silicon Vertex Tracker Rachid Nouicer Brookhaven National Laboratory (BNL) For the PHENIX Collaboration Stripixel VTX Review October 1, 2008.
L1Calo EM Efficiency Maps Hardeep Bansil University of Birmingham L1Calo Weekly Meeting 07/03/2011.
1 Projectile Spectator Detector: Status and Plans A.Ivashkin (INR, Moscow) PSD performance in Be run. Problems and drawbacks. Future steps.
May 10-14, 2010CALOR2010, Beijing, China 1 Readout electronics of the ALICE photon spectrometer Zhongbao Yin *, Lijiao Liu, Hans Muller, Dieter Rohrich,
AliRoot survey: Calibration P.Hristov 11/06/2013.
PHOTOTUBE SCANNING SETUP AT THE UNIVERSITY OF MARYLAND Doug Roberts U of Maryland, College Park.
SHIP calorimeters at test beam I. KorolkoFebruary 2016.
29/05/09A. Salamon – TDAQ WG - CERN1 LKr calorimeter L0 trigger V. Bonaiuto, L. Cesaroni, A. Fucci, A. Salamon, G. Salina, F. Sargeni.
CLAS12 DAQ & Trigger Status
EMCal Cosmics Run Cosmics Run Goals
MICE Collaboration Meeting Saturday 22nd October 2005 Malcolm Ellis
PSD Front-End-Electronics A.Ivashkin, V.Marin (INR, Moscow)
Preparation for CERN test beam
Commissioning of the ALICE HLT, TPC and PHOS systems
CERN SPS and PS Tests 2007 Goals: Show we have a working EMCal system
Commissioning of the ALICE-PHOS trigger
Presentation transcript:

1 10/15/05T. Awes EMCal Test Beam Measurements Goals: –Measure Energy Response Resolution Linearity –Position Resolution –Shower shapes  /h separation Two cluster separation Maximum E/tower (80%?) –Position dependence Uniformity/Dead regions –Angle incidence dependence –Fix GEANT “parameters” –Test Electronics Readout PHOS tests

2 10/15/05T. Awes Test Beam Scheduled at FNAL We have been approved (MOU_T591) to run at the FNAL Meson Test Beam Facility: Mixed beams of e and  (K,p) from few GeV/c to 120 GeV/c (fractions/rates depend on momentum) - good match to our needs. Scheduled for 1 shift of setup Friday Nov.4 followed by parasitic use of beam during following week while MOU_T590 (J-PARC straw tubes) is primary user. During this week we can continue setup, debugging, and begin gain matching, test shaping time difference and perhaps make decision on which to emphasize. Primary user during weeks of Nov.14 and Nov. 21 (Thanksgiving) with possibility to extend period if necessary.

3 10/15/05T. Awes Test Beam Setup Scintillators to define beam trigger (FNAL), Small Scint (1x1 or 2x2cm) to define trigger region (?), Fe Absorber + large Scint to tag Muons (?) Wire Chambers for Beam position measurement (FNAL) Two Cherenkov for e/pi Identification (FNAL) Test module (4x4 modules, 8x8 towers) (WSU) X-Y moveable platform, Rotating (FNAL,WSU,Home Depot) Readout electronics for Beam Counters (FNAL), share with T950 during setup. EMCAL readout and DAQ (ORNL) Facility expertise/contact (Erik Ramberg, FNAL) Shift crew and data analysis team (?)

4 10/15/05T. Awes Preparation Status 16 Modules from WSU with APD+preamplifiers - soon ready DAQ - rather than attempting to merge trigger counters into ALICE DAQ we will run to parallel event streams sync’d by event counter to be merged “offline” (“flying blind”: need immediate processing). ALICE DAQ for PHOS FEE operational FNAL DAQ operational - but will need to develop code to translate and merge with FEE data. Weiner CBD-USB - backup solution, same datastream merging problem. FEE - we have “in hand” and working only 8 channels of readout! Transition cards and Intermediate PCBs are being shipped from CERN - enough for other 56 channels - will need to assemble IPCB connectors and cables. Second FEE (v1.1) is so far “Dead”. If it cannot be repaired we will have only 32 channels of readout. A 5x5 array would be “okay”

5 10/15/05T. Awes Preparation Status Two other known “problems”: So far have been unable to program FEE firmware Perhaps not necessary for test since FEE “works” So far the APD bias software control has not been demonstrated to work - unclear if it should with v1.0 card and firmware we have operational. Other major task is to confirm shorter shaping time works - (it seems to, see below) and to change half or all FEE channels to use shorter shaping time.

6 10/15/05T. Awes Data-taking and Software Status Using analysis software from PHOS folks; used for studies of their 2004 test beam data. Written by A. V. Kuryakin (Sarov). Modifications by Andre Mischke (Utrecht, CERN, LBNL), incl. plot macros etc. Most significant help from Andre and Hans Mueller in understanding how to take and analyze data! In addition, also valuable help from other PHOS people: Johan Alme, Per Thomas Hille (both from Bergen) and Zhongbao Yin (Wuhan). Note: Report mostly from David Silvermyr (ORNL)

7 10/15/05T. Awes Taking data! Thanks to setup work at CERN (Andre Mischke, Hans Muller, Peter Jacobs) + new RCU firmware version (not yet quite bug-free: miss one channel), we were able to run the DAQ and take data fairly quickly.

8 10/15/05T. Awes DCS/RCU communication + misc. scripts Communication with Readout Control Unit (RCU) via Linux-lite interface. We have developed simple perl scripts to handle channel mapping (Module, CSP, Channel) lookups and generating instructions for APD HV bias control via register interface. Not fully tested yet, and perhaps not too elegant, but should be ok for test beam efforts.

9 10/15/05T. Awes Data Analysis So-called ‘mp-altro’ analysis code from PHOS folks was extremely useful in the first look at data and e.g. figuring out how the 10-bit adc samples were packed in the output, checking trailer words etc.. Also a lot of useful code for e.g. fitting pulse shapes; checking RMS and pedestals,.. Some drawbacks were found though: 1) ~1300 histogram were produced per analysis run (for 32 channels worth of readout – would double for us..) 2) No ntuple-style output. 3) To study shapes for different events require changing hardwired event-number and recompile in between. I.e. not too flexible, and probably problematic to align data with trigger event stream.

10 10/15/05T. Awes First Data LED-pulse; ADC vs sample. Note: 2  s shaping time, 4  s peaking time (20  s fullscale) Pedestal RMS (High Gain) vs Pre-amp number.

11 10/15/05T. Awes Shaping Changes: Scope Traces LED-pulse; Note: 2  s shaping time, 4  s peaking time (4  s/div) LED-pulse; Note: 100 ns shaping time, 200 ns peaking time (4  s/div)

12 10/15/05T. Awes Shaping Changes: Scope Traces LED-pulse; Note: 2  s shaping time, 4  s peaking time (4  s/div) LED-pulse; Note: 100 ns shaping time, 200 ns peaking time (400 ns/div)

13 10/15/05T. Awes Shaping Changes: Digitized Narrow shaping (100 ns) - Negative pedestal? (high gain) 2  s shaping.. – not so nice.

14 10/15/05T. Awes Shaping Changes: Digitized Pedestals (Low gain) CSP 30 and 31 with 300V. CSP 30 with 2  s shaping, CSP 31 with EMCal shaping (100 ns). (CSP 11 sick?!, CSP 3 Low gain missing due to RCU bug.) - Better RMS with 100ns shaping! - Negative pedestal? (high gain)

15 10/15/05T. Awes Electronic logbook Installed e-log on pcemcal001. This is a lightweight (just ascii), simple and easily configurable logbook (used by PHENIX for a couple of years) that should be adequate to keep track of all setup and test- beam activities. Find/search-function works well.

16 10/15/05T. Awes Software Plan To remedy limitations from existing mp-altro code, we have created a simpler down-scaled version (~ factor 4 less lines of code) of the analysis program that writes a ROOT TTree with all samples for all channels for all events, i.e. no loss of the information we are interested in. Perhaps interestingly,the resulting ROOT file is approx. a factor 4 smaller than the bit- packed DATE file. [A gzip of the DATE file reduces size by factor 6, so ROOT compression is not so bad] This isolates the somewhat complicated unpacking code to a part most will not need to look at, and we will work on making a simple analysis package that most collaborators who are interested can more easily use, and contribute to, with things like pulse shape finding and fitting etc. in a compiled code environment with familiar ROOT ingredients. We’ll pick up components from the existing mp-altro code. This port will be a cut and paste exercise over the next week or so in TN; should be ready well in time before the test beam period starts. Once we get data, some effort will be needed to synch trigger and EMCal data. Should not be hard in principle but we’ll see how it works out in practice.

17 10/15/05T. Awes Cool Result: Test Energy and Position Use  - +C reaction to produce   and  With 5 GeV beam at CERN PS (~30    / 10 4  )