Update on the ATCA work going on at LAPP xTCA interest group - CERN 08/04/2013 Nicolas LETENDRE Alain Bazan, Fatih Bellachia, Sébastien Cap,Nicolas Dumont-Dayot,

Slides:



Advertisements
Similar presentations
Goals and status of the ATLAS VME Replacement Working Group Markus Joos, CERN Based on slides prepared by Guy Perrot, LAPP 19/09/2012.
Advertisements

StackPC Stackable Computers
ROD R&D Status K. Johns, C. Armijo, J. Steinberg (U. Arizona) H. Chen, F. Lanni, J. Mead (BNL) L. Hervas (CERN) A. Meyer, A. Kielburg-Jeka, A. Straessner.
LAPP IPMC Mezzanine HARDWARE & SOFTWARE
Digital RF Stabilization System Based on MicroTCA Technology - Libera LLRF Robert Černe May 2010, RT10, Lisboa
26-Sep-11 1 New xTCA Developments at SLAC CERN xTCA for Physics Interest Group Sept 26, 2011 Ray Larsen SLAC National Accelerator Laboratory New xTCA Developments.
RCE Platform Technology (RPT)
INTELLIGENT PLATFORM MANAGEMENT CONTROLLER FOR NUCLEAR FUSION FAST PLANT SYSTEM CONTROLLERS 17th Real Time Conference IPFN, Lisbon, Portugal, May,
An ATCA and FPGA-Based Data Processing Unit for PANDA Experiment H.XU, Z.-A. LIU,Q.WANG, D.JIN, Inst. High Energy Physics, Beijing, W. Kühn, J. Lang, S.
Enclosures & ComponentsBackplanesSystem PlatformsSwitches, Knobs & LEDsCabinets 1 MTCA Systems Technology Meeting CERN Genève.
Shelf Management & IPMI SRS related activities
Development of an ATCA IPMI Controller Mezzanine Board to be used in the ATCA developments for the ATLAS Liquid Argon upgrade Nicolas Dumont Dayot, LAPP.
HARDWARE OPAL-RT MARC PASTOR Real-Time 2009 Montreal, Quebec, Canada.
About Samway Electronic SRL Founded in 2005 in Bucharest, Romania Focused on management and monitoring solutions for telecom/industrial computers Active.
XTCA activities at CERN Markus Joos PH-ESE xTCA interest group – Background – Report of the 2 nd meeting (held on 7.3.) uTCA evaluation and AMC development.
Preliminary Design Review: Hub Implementation Dan Edmunds, Wade Fisher, Yuri Ermoline, Philippe Laurens Michigan State University 01-Oct-2014.
Pulsar II Hardware Overview Jamieson Olsen, Fermilab 14 April 2014
ATCA based LLRF system design review DESY Control servers for ATCA based LLRF system Piotr Pucyk - DESY, Warsaw University of Technology Jaroslaw.
June 3, 2005H Themann SUSB Physics & Astronomy 1 Phenix Silicon Pixel FEM S. Abeytunge C. Pancake E. Shafto H. Themann.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Communication in ATCA-LLRF System LLRF Review, DESY, December 3rd, 2007 Communication in.
Smart Parking System PREPARED BY : GHADEER AQRAA AND MARAH JABER.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser XFEL-LLRF-ATCA Meeting, 3-4 December 2007 Communication in ATCA-LLRF System Presenter:
May 29, 2007 DESY Controls Mtg. Global Design Effort 1 Integration Requirements for ATCA C. Saunders.
XTCA projects (HW and SW) related to ATLAS LAr xTCA interest group - CERN 07/03/2011 Nicolas Letendre – Laurent Fournier - LAPP.
The PH/ESE µTCA evaluation project a (short) status update Markus Joos CERN M. Joos, CERN13rd meeting of the xTCA IG.
- Proprietary and Confidential- 1 ATCA300 in a Nutshell.
SRS Trigger Processor Option Status and Plans Sorin Martoiu (IFIN-HH)
1 Test Setups for the FE-I4 Integrated Circuit Stewart Koppell 8/1/2010.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Dariusz Makowski, Technical University of Łódź LLRF review, DESY, 3 December 2007 The Importance.
Embedded Systems Design with Qsys and Altera Monitor Program
IPMI developments at LAPP dec 15, 2011IPMI developments at LAPP, L.Fournier1 Alain BAZAN, Fatih BELLACHIA,Sébastien CAP, Nicolas DUMONT DAYOT, Laurent.
New ATCA compute node Design for PXD Zhen-An Liu TrigLab, IHEP Beijing Feb , 6th International Workshop on DEPFET Detectors and Applications.
Consideration of the LAr LDPS for the MM Trigger Processor Kenneth Johns University of Arizona Block diagrams and some slides are edited from those of.
IPMI: New MMC firmware IN2P3: DAQ working group (19/06/15) 19/06/2015IN2P3: DAQ working group (06/19)1 PH-ESE-BE collaboration Vincent Bobillier, Stefan.
1 Hardware Tests of Compute Node Carrier Board Hao Xu IHEP, CAS.
Fatih Bellachia Sébastien Cap, Nicolas Dumont ‐ Dayot, Jasmin Fragnaud, Nicolas Letendre, Guy Perrot, Isabelle Wingerter.
E. Hazen - DTC1 DAQ / Trigger Card for HCAL SLHC Readout E. Hazen - Boston University.
Compute Node Tutorial(2) Agenda Introduce to RocketIO How to build a optical link connection Backplane and cross link communications How to.
MicroTCA & AdvancedTCA Shelf Management Jiping Cao May, 2009 Controls Conference (RT2009) Beijing China.
AMC-based Upgrade of Compute Node Hao XU Trigger group of IHEP, Beijing PANDA DAQT and FEE Workshop, Rauischholzhausen Castle April 2010.
Status of Compute Node Zhen’an Liu, Dehui Sun, Jingzhou Zhao, Qiang Wang, Hao Xu Triglab, IHEP, Beijing Wolfgang Kühn, Sören Lange, Univ. Giessen Belle2.
Johannes Lang: IPMI Controller Johannes Lang, Ming Liu, Zhen’An Liu, Qiang Wang, Hao Xu, Wolfgang Kuehn JLU Giessen & IHEP.
E. Hazen -- Upgrade Meetings1 AMC13 Project Development Status E. Hazen, S.X. Wu - Boston University.
E. Hazen1 MicroTCA for HCAL and CMS Review / Status E. Hazen - Boston University for the CMS Collaboration.
E. Hazen -- ACES ACES 2011 MicroTCA in CMS E. Hazen, Boston University for the CMS collaboration.
E. Hazen -- Upgrade Week1 AMC13 Project Status E. Hazen - Boston University for the CMS Collaboration.
E. Hazen -- xTCA IG1 AMC13 Project Status E. Hazen - Boston University for the CMS Collaboration.
E. Hazen -- Upgrade Week1 HCAL uTCA Readout Plan E. Hazen - Boston University for the CMS HCAL Collaboration.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Dariusz Makowski, Technical University of Łódź LLRF review, DESY, 3 December 2007 The Importance.
E. Hazen -- Upgrade Meetings1 AMC13 Project DAQ and TTC Integration For MicroTCA in CMS Status Report E. Hazen - Boston University for the CMS.
E. Hazen1 AMC13 Status E. Hazen - Boston University for the CMS Collaboration.
E. Hazen1 AMC13 Project Status E. Hazen - Boston University for the CMS Collaboration.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Dariusz Makowski, Technical University of Łódź, DMCS ATCA LLRF project review, DESY, 3-4.
A. Aloisio, R. Giordano Univ. of Naples ‘Federico II’
AMC13 Project Status E. Hazen - Boston University
Design of an AdvancedTCA board Management Controller Solution
Test Boards Design for LTDB
Vinculum II Development Modules
AMC13 T1 Rev 2 Preliminary Design Review E. Hazen Boston University
CERN-IPMC Solution for AdvancedTCA Blades
AMC13 Status Report AMC13 Update.
IPMC Firmware Fatih Bellachia
LATOME LAPP Nicolas Dumont Dayot on behalf of the LAPP team
uTCA A Common Hardware Platform for CMS Trigger Upgrades
MicroTCA Common Platform For CMS Working Group
MicroTCA Common Platform For CMS Working Group
xTCA interest group meeting
xTCA in CMS Magnus Hansen Thanks to many CMS collaborators
Cisco MDS 9124e Fabric Switch for HP c-Class BladeSystem
Readout Systems Update
Presentation transcript:

Update on the ATCA work going on at LAPP xTCA interest group - CERN 08/04/2013 Nicolas LETENDRE Alain Bazan, Fatih Bellachia, Sébastien Cap,Nicolas Dumont-Dayot, Laurent Fournier, Guy Perrot, Isabelle Wingerter 08/04/2012CERN - xTCA Interest Group1

IPMC Mezzanine V1 IPMC mezzanine V1 - FMC size, based on cortex M3 - IPMC function - ATCA board configuration function ATCA Test Board – Mezzanine tested on ATCA test board – IPMC functionalities: Hardware & software OK But: No support for AMC mezzanine size too large… 08/04/2012CERN - xTCA Interest Group2 → Design of a Mezzanine V2

IPMC Mezzanine V2 IPMC features – IPMB_0 with on board buffers, Hardware address detection – Hot Swap management with ATCA Leds and front panel switch – Management of up to 8 AMC + RTM – On board Event LOG – FRU & SDR via I2C – Access to ATCA board sensors via I2C – IPM_IO: Configurable User Signals for Payload management and e-keying NON-IPMC features JTAG Master – JTAG master via Ethernet (ATCA board debugging, firmware upgrade) Custom interface – Possibility to have a custom interface between the Mezzanine and the ATCA board for custom functionalities Other – USB and UART interfaces (debugging etc..) 08/04/2012CERN - xTCA Interest Group3

IPMC Mezzanine V2 - Hardware 08/04/2012CERN - xTCA Interest Group4 Mechanical Small size: DDR3 VLP Mini-DIMM Vertical or horizontal mounting Based on ARM Cortex M4 µC Hardware part almost tested Software of mezzanine V1 successfully ported Tested on CPPM and LAPP carrier New bug free version (V2.1) will only be produced after extensive tests with new software and firmware (Autumn). If someone needs a mezzanine sooner, we can provide a patched V2.0

LAPP IPMC V2 Test Board 08/04/2012CERN - xTCA Interest Group5 ATCA board Designed to tests and debug IPMC mezzanine V2 (Hard and Soft) Board powering (hot swap, power negotiation) IPMB and communication with shelf manager Sensors reading E-keying AMC power management with different devices AMC management (communication with MMC) Ethernet / USB / UART User_IO and IPM_IO Features 4 AMC slot + 1 MMC slot Communications between 2 AMCs, and to the fabric for E-keying tests Spy FPGA connected to IPMC signals

LAPP IPMC V2 Test Board 08/04/2012CERN - xTCA Interest Group6 Board received in March Test on-going IPMC Mezzanine V2 with V1 software successfully tested

IPMC Mezzanine V2 - Software 08/04/2012CERN - xTCA Interest Group7 Re-design of software for mezzanine V2 for AMC support Better take into account users requirements Easier integration of users module GUI for some configuration (FRU/SDR, IO) Fully open source

Mezzanine V2 software architecture 08/04/2012CERN - xTCA Interest Group8 Bare-metal application MCUMCU STM32F4x7 DriverDriver libopencm3 (LGPL) ethernet HALHAL USART USB I2CI2C I2CI2C SPI RCC GPIO MiddlewareMiddleware IPMB IMC lwip (BSD) ComponentComponent IPMC AMC Mgt Resource Broker TCP server JTAG Mst User I/O

LAPP IPMC Mezzanine V2 conclusion Hardware almost tested. Tests on-going with the new test board New hardware (bug correction) for Autumn Work on new software version on-going New software version (beta released) for end of may 08/04/2012CERN - xTCA Interest Group9