DESIGN OF THE HATCH OF THE INSTRUMENT BOOTH OF EUSO-BALLOON version v1.2 Writer : SYLVIE DAGORET- CAMPAGNE Final tests and Health tests1

Slides:



Advertisements
Similar presentations
JED Microprocessors Pty Ltd Presenting the JED T430 low-cost Projector Controllers Nov 22nd, 2009.
Advertisements

Electrical wiring for piezo movers piezo power supply strain gauges readout temperature probes 1 Frédéric BOGARD – LAL/IN2P3/CNRS – Jan 25, 2013 Electrical.
Installation. Indoor Unit Installation Typical Installation.
TPC Proposal for the 35 Ton Liquid Argon Test Abstract We propose to equip the 35 ton cryostat with one APA and two CPA’s, and all the necessary equipment.
EML 2023 – Motor Control Lecture 4 – DAQ and Motor Controller.
How to Hookup your Classroom Phone and Computer. Do your computers look like this when you return from summer vacation???
Presents The Silver Family An Integrated Approach to Processors, Data Communication and Head End Integration.
Neutron Detector Shutdown Procedure 1.Turn Off Photomultiplier Tube High Voltages There are two HV channels per red module, each with it’s own black dial.
Ports, Cables and Connectors
How to Build A Computer By John A. Saiz. Materials Required Tools Screw driver Screw driver Tweezers Tweezers Flashlight FlashlightHardware PC Case PC.
“Power Supply” Controls Voltage Difference in Voltage is set Output Current is “as requested” by attached device.
HK & LVPS for EUSO –TA / -Balloon G. Medina-Tanco, L. Santiago, H. Silva Lopez, F. Trillaud, C. Lopez, J. Rojas, A. De la Cruz, S. Guerrero, G. Leon.
End of phase A meeting CNES (Toulouse) 2/02/2012 Ph. Gorodetzky APC - Paris Diderot1 High Voltage power supplies HV Switches Design: J. Szabelski, J. Karcmarczyk,
- Grounding - Harness Shielding - PDM Electrical Architecture - DP Electrical Architecture EUSO-BALLOON DESIGN REVIEW, , CNES TOULOUSE Pierre.
EUSO-BALLOON CDR – Agenda (I). Internal interfaces overview Batteries and Low Voltage power Supplies PDM interfaces DP interfaces HK Interfaces List of.
Inverters November 2007, Alex Righolt. Overview A&A Computers sell and install inverter systems as an alternative to UPS-es. Inverters are easily scaleable;
EUSO BALLOON Battery Power Pack (PWP) RIKEN/UAH Héctor Prieto, Katsuhiko Tsuno, Marco Casolino.
1 Why have we chosen to use the serial port, when it is more complicated and offers fewer connections than the printer port? For a beginners’ course using.
Solar Energy Station Directions. Making a Solar-Powered Circuit 1.Make sure your solar panel is in direct sun. 2.Get the clear LED bulb. 3.Use a red jumper.
E-LABORATORY PRACTICAL TEACHING FOR APPLIED ENGINEERING SCIENCES W O R K S H O P University of Oradea, Romania February 6, 2012 G E N E R A L P R E S E.
Building a Switch-based Network
1 Cryostat assembly, integration and commissioning procedures M.Olcese Version: 07 May 2008.
- Where are the entry points of the instrument - Physical External links - Overview of the External Interfaces - Status - Conclusion EUSO-BALLOON DESIGN.
Servo Motor Control Demonstration.
Single Loop Analogue addressable fire control Panel
Detectors - what detectors are available diamond / silicone - transport / shipping - 3 ROCs at UT? ROC Operation / Readout Modules (ED) - what modules.
MICRO CONTROLLER MODULE 1. Learning Objectives Name some gadgets that use microcontrollers. Define a microcontroller. Differentiate between a computer.
Servo Motor Control Demonstration. EML 2023 Department of Mechanical and Aerospace Engineering motor with gear reducer flex coupling incremental optical.
Anatoli Konoplyannikov Design and integration of HV, LED monitoring and calibration system for HCAL Overview of the subsystems design High voltage.
FEE LVPS 1. INTRODUCTION This section describes the Low Voltage Power Supplies (LVPS) for the TPC FEEs and RDOs. Plans currently call for all of the old.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
The PDM-block M. Casolino on behalf of JEM-EUSO collaboration EUSO-BALLOON Phase A review 2 nd February 2012, CNES, Toulouse.
FIRST Electrical Design FIRST Robotics Championship Conference Steven Shade Team 1111 April 16, 2003.
1 Outline Firmware upgrade of the HV_LED_DAC boards. HV Status Bits board. Status of the board integration into the LHCb TFC system. CALO HV system and.
Current Electricity 1. What is Electric Current? Electric current is the flow of electricity through a conductor. The current is caused by the movement.
On behalf of joint ITEP / IHEP team: A. Arefiev, N. Filimonov, T. Kvaratskheliya, I. Machikhiliyan, P. Shatalov, T. Zakoryuchkina, A. Zhokhov, S. Zvyagintsev.
HK-status. RS422 (diff) RS232 SPI Trigger rate Analog(V,T) >=4 Analog(V,T)
- Overview of the subsystems - The Photodetector Module and its components - The Data Processing and its components - The Power Pack - Summary of subsystems.
PS VFE & PS/SPD FE Electronics Status and Plans 20 February 2008 LPC Clermont.
Single Module Tests (electrical) Inspect connectors and cables for visible damage C-measurement: make sure all pads are correctly connected HV test (1.5.
Basic Equipment and Schematic Reading. Objectives Learn the basic equipment that will be used in the Lab. Learn some of the basic symbols used on electrical.
EUSO BALLOON Battery Power Pack (PWP) RIKEN/UAH Héctor Prieto, Katsuhiko Tsuno, Marco Casolino 1.
CEA DSM Irfu SIS LDISC 18/04/2012 Paul Lotrus 1 Control Command Overview GBAR Collaboration Meeting Paul Lotrus CEA/DSM/Irfu/SIS.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
E Ethernet C CAN bus P Profibus HV HV cables LV LV cables (+busbar) S Serial (RS232) Signal cable Other/Unknown Liquid or Gas Cable and/or Bus PCI-XYZ.
New digital readout of HFRAMDON neutron counters Proposal Version 2.
05/12/2014 Gerrit Jan Focker, BE/BI/PM 1 PSB-Injection H - and H 0 Dump detectors and Stripping Foil current measurement.
E.Guschin (INR,Moscow) 26 February 2008PS/SPD commissioning meeting CERN PS/SPD LED monitoring system status Tuning of SPD ‘C’ side: We concentrated our.
T HE PDM INTEGRATION P. Barrillon (LAL) & G. Prévôt (APC) On behalf of the PDM crew (Simon, Lech, Philippe, Sylvie B) EUSO-SPB/MiniEUSO progress meeting,
Requested hardware for Clermont-Ferrand in the test beam 2015 September 23 Roméo Bonnefoy and François Vazeille This material is provided by LPC and Collaboration:
Modem. Introduction: A modem [Modulator -Demodulator] is a device. Data communication means transmitting digital information form one computer to other.
Michel DUPIEUX IRAP Progress Meeting LAL 02/03/ EC interface with PDM.
Pierre PRAT Progress the Michel DUPIEUX.
Computer Bunker Training Most classrooms contain a bunker equipped with a computer with an integrated DVD player and an ELMO for your use.
MADEIRA Valencia report V. Stankova, C. Lacasta, V. Linhart Ljubljana meeting February 2009.
CERN Giovanna Lehmann, Xavier Pons
C1300 advanced circular chart recorder
Plans for this week MWPC: wire stretching today
1. Make sure supply voltage is off, unplug the USB, and close the GUI.
2. Car Pad 4 backside cable connection port definition.
Radius disco Radius agujero Motor Controller Sensor Motor soporte.
Monitoring system commissioning
Christian Veelken last updated 11/09/06
PMT cabling Gian Luca Raselli INFN Pavia
Front-end electronic system for large area photomultipliers readout
सोलर पॅनेलचा उपयोग करुन रीचर्जेबल टॉर्च बनवणे.
McCrometer Nano Board Test Procedure
AQT90 FLEX Service Training
NI Data Acquisition (DAQ) Wiring and Connections
Command and Data Handling
Presentation transcript:

DESIGN OF THE HATCH OF THE INSTRUMENT BOOTH OF EUSO-BALLOON version v1.2 Writer : SYLVIE DAGORET- CAMPAGNE Final tests and Health tests1

Purpose of the hatch The hatch is a kind of box of 17 cm x 17 cm x 6 cm inside the top wall of the Instrument Booth. During final tests and health tests the electronics of the internal booth is connected to external equipment to shunt : SIREN which may not be available Batteries to spare the cells Last checking tests are done to be sure the whole detector works as expected. Final tests and Health tests2 Hatch open

Hatch closed For the flight, the cables to external equipments are removed, SIREN is installed definitely inside the IB, the connectors are plugged with the terminal plugs, the hatch box is closed. The instrument works with SIREN and its own battery The whole instrument booth (IB) has to be kept totally watertight even if splash fall in water Final tests and Health tests3 Hatch closed

Cables having to pass through the hatch The cables from both side are connected through a series of feedthrough connectors passing through the wall of the hatch box. During the tests the active subsystems of IB are connected to the external equipments and for flight, the external cables are removed, the internal cables are kept in place and the feedthrough connectors inside the hatch box is ended by plugs. Final tests and Health tests4

List of feedthrough namesubsystemequipmenttypecomment LEDLedStabilised voltage supply Lemo or BNCFS illumination PM AnodeExt PMScopeLemo or BNCLight leakage PM HVExt PMHVBNC PDM-BPDM-B IntPC-USB-PDMUSB2 CPU-ExtTrigCPUTrigger generator Lemo or BNC CPU-EthCPUPC-Ethernet- CPU DB9 SIREN-EthSIRENDB9In flight Loop back toward CPU- Eth SIREN- RS232/422 SIRENDB9In flight loop back HK RS422 SIREN-Open Drain SIRENLemo or BNCIn flight loop back LVPS-HK LVPS-HK Open Drain LVPS-HKSignal generator ? TBC Lemo or BNC HK-RS422HKPC-RS422-CPUDB9 PWP 28 V Power supply MicroSUBD25 Allow to switch between external geenrator and batteries Motor Motor CpntrolSUBD25 TBD Final tests and Health tests5

LED PDM-B NI HATCH BOX BNC USB CPU External Trig Ethernet DB9 SIREN Ethernet RS232 Open Drain Computer PDM Soft LED Power supply BNC plug Ext Trig Computer DP Soft DB9 LVPS-HK Open Drain RS232/ RS422 DB9 HK RS422 Instrument booth BNC plug Computer HK Soft Analog Turn ON External Test equipment SUBD-25 Batteries SUBD-25 plug External Power Supply 28 V, 5 Amp 6 Motor SubD25 Motor control Ext PM BNC SHV BNC PM HV Scope

LED PDM-B NI HATCH BOX BNC USB CPU External Trig Ethernet DB9 SIREN Ethernet RS232 Open Drain BNC plug DB9 LVPS-HK Open Drain RS232/ RS422 DB9 HK RS422 Instrument booth BNC plug IN Flight SUBD-25 Batteries SUBD-25 7 Motor subD25SubD25 Ext PM BNC SHV BNC plug

Hatch Panel Design Final tests and Health tests8

BACKUP Final tests and Health tests9

LED For Final Tests and Health Tests: This is to put a stabilised voltage for pulsing with photons the PDM FS. The feedthough has to be of good quality to avoid water entering inside the instrument. Integrating sphere optional Final tests and Health tests10

External PMT For Final Tests : The purpose is to check there is no light leakage inside the Instrument booth. Need to feed the voltage divider by HV (BNC-SHV) Need to read the anode with lemo/BNC May be kept in-situe for health test to check LED is pulsing correctly Final tests and Health tests11

PDM-B This is to read the PDM-B directly on a PC to perform special studies that shunt the DP. This is optional but probably usefull for debugging during final tests (not health tests). It is possible to select the Data Output of the PDM-B by a command from DP. This requires to have the NI inside the IB (instrument booth). The question is can we find a watertight USB plug for flight Final tests and Health tests12

CPU Ethernet To be watertight the usual RJ45 Ethernet connector will not be used. We should use a DB9 feedthrough. In Flight : A plug DB9 is used to loop back to SIREN Ethernet. External Trigger For final tests, like PDM-FS position adjustment with a motor, the CPU- DAQ is triggered externally A BNC/lemo is proposed with the most watertight solution proposed. Final tests and Health tests13

HK RS422 : We will use a DB9 feedthrough (watertight). In Flight : A plug DB9 is used to loop back to SIREN RS422/RS232. Final tests and Health tests14

LVPS-HK This is the port through which the instrument start to be turned on. This is an analog signal on open drain from a dedicated SIREN output. The proposed connection is through BNC/lemo (depending on watertightness) This connection is doubled to loop back from SIREN to LVPS HK during the flight Final tests and Health tests15

Motor DB25 connector is enough Final tests and Health tests16

Open points The hatch panel has still to be confirmed in the 15th meeting The choice of the feedthrough has to be done according compromises on: – Price/ connector quality – Full Water tightness for sea landing – Reusability during the same flight campaign No idea about the turn on off HVPS ? Final tests and Health tests17