Dushanbe May 20, 2013 Progress Update and Planning for Next Steps.

Slides:



Advertisements
Similar presentations
WTO TRADE FACILITATION SUPPORT PROGRAM
Advertisements

F IRST P HASE OF THE C ENTRAL A SIA S OUTH A SIA R EGIONAL E LECTRICITY M ARKET (CASAREM) March
Issues and counter-measures related to the status of the power supply in SAARC countries March 6, 2013 Professor Shigeru Sudo Department of Business Management.
Kyrgyzstan: Climate Change Mitigation Actions Zuhra Abaihanova TNC Coordinator, Climate Change Centre Director, CC Coordination Commission Executive Secretary.
ENERGY SECTOR IN MONTENEGRO
By : Soukata Vichit The Feasibility of NCF The case of Environment Protection Fund, Lao PDR.
Energy – Water Nexus in Central Asia IJsbrand H. de Jong Lead Water Resources Specialist World Bank, Almaty.
Donors’ Conference on Sustainable Energy for Kosovo
Energy crisis and climate change; a challenge for policy makers and economy in Southeast Europe International conference; Southeast Europe Association.
12-May-151 Khan Younis Waste Water Treatment Plant Management Arrangements Khan Younis Waste Water Treatment Plant Management Arrangements.
Dushanbe, Republic of Tajikistan
Hydropower Development: Experience of Nepal
Energy Infrastructure in Latin America the View of the IDB May 6, 2011 Miami, Florida Sustainable Energy for all.
1 Fiscal Federalism in Iraq: OIL and GAS. The oil situation: a snapshot.
Russia in global energy context Remarks at the 11th Annual Global Energy Forum by Yevgeny Zvedre, Science & Technology Attaché Embassy of the Russian Federation.
Sustainable Energy at the World Bank: Policies and Experiences Anil Cabraal Lead Energy Specialist Energy and Water Department The World Bank Norway-World.
1 Role of the African Development Bank in Developing Clean Investments Mrs. Hela Cheikhrouhou – Manager Infrastructure Finance, Private Sector Operations,
You currently have no control over ever rising electricity prices Electricity costs have doubled over the last 10 years* What will your electricity bill.
Economics of Regional Energy Cooperation: Nepal Case Study Dr Priyantha D C Wijayatunga Head, Portfolio Management Unit Nepal Resident Mission Asian Development.
EBRD and the GEF Combining Capacity Building and Investment.
1 Ongoing strategy of development and reconstruction of electricity sector of Tajikistan Rafika Musaeva Chairman of Association of Energy of Tajikistan.
ENERGY AND POWER  Bangladesh Development Forum 2010  DHAKA Ministry of Power, Energy & Mineral Resources Government of the People’s Republic of Bangladesh.
Development Partners meeting, April 9, 2013 Natalia Kulichenko-Lotz World Bank.
1 CENTRAL ASIA MICRO FINANCE ALLIANCE December, 2006.
1 “TRANSBOUNDARY WATER COOPERATION IN CENTRAL ASIA” Dr. Saghit Ibatullin, Chairman Executive Committee of International Fund for saving the Aral Sea.
INITIATIVES IMPLEMENTED ON NATIONAL AND INTERNATIONAL LEVELS FOR ENERGY EFFICIENCY AND ENERGY- SAVING IMPROVEMENT VI Eurasian Energy Forum 4-6 October.
1 ADB Support to Transboundary Water Resources Management in Central Asia Hong Wei Country Director Uzbekistan Resident Mission Asian Development Bank.
EAP Task Force Trends in Environmental Finance in EECCA Carla Bertuzzi, Xavier Leflaive Paris, 22 February 2007.
The Global Fund- structure, function and evolution February 18, 2008.
Highlights and Visions May 24,  Since joining the GEF as an Executing Agency in 2004, the Bank has developed a portfolio that amounts to nearly.
1 Europe and CIS Jacek Cukrowski Economic Development and Poverty Reduction Advisor, UNDP, Europe and the CIS Bratislava Regional Centre Aid for Trade.
Household energy, water vulnerability in Tajikistan and Kyrgyzstan: What have we learned? Ben Slay Senior economist UNDP Bureau for Europe and CIS Third.
National financing tools for local environmental infrastructure Emil Savov Deputy Executive Director National Association of Municipalities in Bulgaria.
2010/ /12 Budget Town Hall May 25, /11 Government Grant ($ in millions) E XPECTED Base Transition and Growth Total Grant Anticipated.
OECD Private Sector Development 1 OECD EURASIA COMPETITIVENESS PROGRAMME Enhancing Investment, Competitiveness and Private Sector Development in Central.
The Energy Charter and Turkmenistan Patrick Larkin Energy Charter Secretariat.
September Elements of success behind CASA-1000.
FOR SIXTY YEARS WE HAVE BEEN TAKING THE POWER FROM WATER AND HANDING IT OVER TO NATIONS LINKING THE DOTS Bucharest, February 20, 2014.
5 th World Water Forum AFRICA DAY 1 Dr. Mandla Gantsho Vice-President African Development Bank 18 th March 2009, Istanbul.
Nikolai Kravtsov Public Foundation «Youstin» (Consumer Association) Washington, USA April, 2010 ELECTRICITY GOVERNANCE INITIATIVE AND REGIONAL ELECTRICITY.
The Sixth Regional Economic Cooperation Conference on Afghanistan Annotated Working Group Program Abdul Razique “Samadi” CEO DABS Afghanistan September.
The World Bank The World Bank Europe and Central Asia (ECA) Region— Energy Sector Program Washington DC, November 6, 2013 Salvador Rivera, Lead Energy.
Korea International Cooperation Agency International Cooperation Training Center Korea International Cooperation Agency International Cooperation Training.
13 February 2013, Bishkek Honma Masaru Director for Central Asia, EBRD © European Bank for Reconstruction and Development 2010 | EBRD’s Activities.
1 The Energy Community of South East Europe 4th Poverty Reduction Strategies Forum June 26-27, 2007 Athens, Greece Henk Busz Europe and Central Asia Region.
El Gallo Hydroelectricity Project PDD Analysis
FROM GAPS TO CAPS Risk Management Capability Based on Gaps Identification in the BSR Project Lead Partner: Fire and Rescue Department under the Ministry.
Ambassador Sherali Saidamir Jononov
1 Belarus CEM Discussions Energy Sector Stable sector structure and governance over the past decade together with recent macro economic performance of.
MINING AND INFRASTRUCTURE INDABA 2015 ZPC PRESENTATION Presented by: N.F. Gwariro (MD)
Energising your Budgets Bruce Pittingale Carbon Special Reserve
Information Sharing and Riparian Discussions Almaty, Kazakhstan May 17-19, 2011 Assessment Studies for the Proposed Rogun Hydropower and Regional Reservoir.
1 19 th World Energy Congress – 2004 Round Table 1 – Non Fossil Fuels: Will They Deliver? Jerson Kelman President, Brazilian Water Agency - ANA.
Country Partnership Strategy FY12-16 Consultations with Civil Society The World Bank Group June 2, 2011.
1 SYMPOSIUM: U G A N D A A F T E R I D I A M I N A N D M I L T O N O B O T E Hamburg, Germany 29 th September 2008 INVESTMENT OPPORTUNITIES IN POWER GENERATION.
INTER-AMERICAN DEVELOPMENT BANK Business Opportunities IDB Financing in Latin America and The Caribbean May 2016.
EABC/EAC ENERGY CONFERENCE: 8-9TH JUNE, AVAILABLE BUSINESS OPPORTUNITIES IN THE ENERGY SECTOR By Eng. B.J. Mrindoko.
Energy Sector of Turkey “General Overview and Policy Objectives” Sinem ÇAYNAK General Directorate for Energy Affairs IEA Turkey IDR Meeting December 8,
Here Renewable Energy Independent Power Producer Programme Bidder’s Conference 16 August 2012 Andrew Etzinger Senior General Manager Eskom.
“Access to electricity is … the connection that’s needed to plug Africa into the grid of the global economy. In partnership with African nations [and the.
Dr. Nyamajeje C. Weggoro Director, Productive and Social Sectors EAC Secretariat THE DAR ES SALAAM-TANGA- MOMBASA NATURAL GAS PIPELINE AND EAST AFRICAN.
Energy and Power Supply Papua New Guinea 1. PNG Power Limited PNG Power Ltd  is a State owned Corporation with the Government’s ownership interest held.
© 2006, Organization of the Petroleum Exporting Countries 1 The Role of OPEC in Oil Market Stability presented by Mohammad Alipour-Jeddi Head, Petroleum.
INTERIM CG MEETING Copenhagen April 29, 2002 Strategy of World Bank for Supporting Power Sector Projects in Central Asia Presentation by Raghuveer Sharma.
Damitha Kumarasinghe Director General
Twelfth Policy Board meeting Lima, Peru 8-9 July 2014
Choice of Project Structure
CASA-1000 TAP Afghanistan’s Energy Connectivity ,Central to South Asia
Introductory Material on GCC
SUSTAINABLE ENERGY INDUSTRY DEVELOPMENT PROJECT (SEIDP)
Presentation transcript:

Dushanbe May 20, 2013 Progress Update and Planning for Next Steps

Kazakhstan Reserves: Oil 30 billion bbl Natural Gas 8585 TCF Coal 31.3 billion tons Hydro Power 20,000 MW Uzbekistan Reserves: Oil 594 million bbl Natural Gas 66 TCF Coal 3.3 billion tons Hydro Power 1,700 MW Turkmenistan Reserves: Oil 600 million bbl Natural Gas 280 TCF Coal Modest Hydro Power Modest Tajikistan Reserves: Oil 0.01 billion bbl Natural Gas 0.2 TCF Coal 3.6 billion tons Hydro Power 40,000 MW Kyrgyzstan Reserves: Oil 0.04 billion bbl Natural Gas 0.2 TCF Coal 0.9 billion tons Hydro Power 26,000 MW Central Asia is endowed with vast energy potential…

…whereas Afghanistan and Pakistan face severe electricity shortages and rapidly increasing demand Electricity riots in Rawalpindi, Pakistan Guardian photo Country Population Million GNI per capita Current US$ Per Capita Electricity Consumption (kWh/year) Installed Capacity (GW) Access Rate Peak shortage (MW) Afghanistan %-- Pakistan %5,022 Power network in Kabul, Afghanistan Kabulkarzaiblogspot photo

The proposed CASA-1000 transmission facilities would: maximize the use of 1,300 MW renewable summer electricity surplus from existing plants in Central Asia (Kyrgyz Republic & Tajikistan) and provide electricity to consumers in electricity deficient South Asia (Afghanistan & Pakistan) 4

5 Even without new power generation, Kyrgyz Republic and Tajikistan have sufficient electricity surplus during summers to warrant CASA-1000 Power domestic consumption and summer surplus (est based on feasibility report) Tajikistan* Kyrgyz Republic *Tajikistan spills water from its dams without generating electricity during the summer

The CASA-1000 project includes:  500 kV line Datka-Khudjand (477 km), with Tajik network transferring Kyrgyz exports to Sangtuda.  Tajikistan Grid Strengthening.  1300 MW AC-DC Convertor Station at Sangtuda.  750 km HVDC line Sangtuda-Kabul- Peshawar.  300 MW Convertor Station at Kabul (with both import & export capability).  1300 MW DC-AC Convertor Station at Peshawar. 6

CASA-1000 benefits all four countries: Ensures a steady source of revenue from surplus hydropower exports for Tajikistan and Kyrgyz Republic, the weakest economies in Central Asia Uses excess summer electricity that is currently being spilled Alleviates electricity shortages in Pakistan during the peak summer season Replaces fuel-based power generation in Afghanistan and Pakistan with clean hydropower Establishes Afghanistan as a viable transit country, enhancing growth prospects  Requires no new power generation investments 7

Project cost estimates per the feasibility study 8 Kyrgyz RepublicUS$ 200 million TajikistanUS$ 250 million AfghanistanUS$ 300 million PakistanUS$ 200 million Total US$ 950 million US$1 billion investment in countries with constrained borrowing capacity US State Department, AusAid, DFID, ADB, Islamic Development Bank, USAID, IFC and World Bank among the donors supporting pre-preparation activities

Project Status Preparation work is proceeding with Joint Working Group (JWG) through monthly VCs and face-to-face meetings. IGC Secretariat strengthened – Executive Director (ED) appointed; USAID funding additional Advisor to the ED; Secretariat accounts audited. Project commercial structure finalized – two options were reviewed (with and without setting up a separate project company.) The option of “Contractual JV” (without an SPV for CASA) is preferred by JWG; IGC resolution has been developed and endorsed by two countries (Afghanistan and Tajikistan). Project commercial contract framework and Model PPA developed and is under review/discussion by the countries. IFC Agreement to support procurement of constructor/operator signed by all. The Joint Working Group is working closely with the IFC to prepare bidding documents for procuring engineer/procure/construct/operate services for the project. CASA-1000 included in the CAREC Energy Work Plan ( ). Communications established online ( 9

The CASA IGC and JWG 10 Afghanistan WG Kyrgyz WG Pakistan WG Tajikistan WG Joint Working Group Intergovernment Council Afghanistan IGC member Kyrgyz IGC member Pakistan IGC member Tajikistan IGC member IGC Secretariat

Two Main Options for Project Structure – Option A: Contractual Joint Venture – Option B: Corporate Joint Venture Countries preferred the Option A Project Structure

Project past milestones MOU and Inter- Governmental Agreement (IGA) for CASA signed by all four countries Feasibility Study Update Completed First Inter- Governmental Council (IGC) meeting after feasibility update in Bishkek Joint Working Groups (WG) established Second IGC meeting in Dubai agrees on project implementation mobilizing finances Most of supporting studies completed; Commercial framework and model agreements drafted Aug’08 Feb ‘11 Sep ‘11 Nov ‘11 May ‘12 13 Dec ‘12

Key challenges for Project preparation Country capacity and commitment to work on commercial deal – Maintain continued commitment and build capacity (country advisors) to sustain the overall momentum of the Project. – One country’s slowness affects the entire process. – Support in bidding process (bidding advisors - IFC) – Perception from outside (links to Rogun/Kambarata, security in Afghanistan, etc.) Financing gap – a critical issue – A key assumption for the preferred structure is that the project will be fully financed by IFIs (no private investments). – Two committed financiers (WB and IsDB); Gulf Coordination Group (aka “Arab Funds”) interested in financing via IsDB; the Russian offer remains on the table but its terms/conditions are not clear. – Donor’s conference and visits to capitals planned for – A narrow window – late 2013 – for approvals and much yet to do 14

Proposed plan and actions IFC Agreement is signed by all countries IFC to secure funding (from Donors) for services / commence work Complete selection of Country Advisors Model PPA; Master Agreement and IGC resolution on key principles Adopting the IGC resolution Visit major donor capitals First Donor Conference Lending PCN review meeting Jan ‘13 Feb ‘13 Finalize commercial framework Mar ‘13 End-May ‘13 Dec ‘13 Filling the financing gap May ‘13 Oct ‘13 Commercial negotiations completed Bank Board Date 15

Project building blocks 16 A. Countries ownership and readiness Dedicated Working Group headed by Deputy Minister level meets every month; Ministerial Inter Governmental Council (IGC) undertakes high level decisions; Full-time IGC Secretariat ED and international advisors in place B. Project structuring and legal framework Project Structure is agreed; Commercial framework designed; The Model Power Purchase Agreement (PPA) drafted; C. Project financing World Bank with IDB and Gulf Coordination Group (GCG) indicated their willingness to finance. Other potential co- financiers include KfW of Germany, Asian Development Bank, JICA of Japan, DFID of UK, and Russia D. Preparatory studies and assessments Project Feasibility Study completed Environment and Social Assessment and Avian Risk management study for the project completed Community Benefit sharing studies ongoing Security Risk Assessment and Mitigation Plan completed Development of open access rules ongoing

17