Amathole District Municipality NKONKOBE LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation HOGSBACK 300 feasibility and review of housing.

Slides:



Advertisements
Similar presentations
SAVANNA CITY - Gauteng’s largest privately initiated development Background information to the Premier.
Advertisements

A COMMUNITY LED PLAN FOR BISHOPSTONE? Public Meeting – 18 th October 2012.
Retirement Villages : Best Practice Planning Friday 29 August 2008.
Chris Hani District Municipality INTSIKA YETHU LOCAL MUNICIPALITY April 2014 PRELIMINARY DRAFT not for circulation Ekuphumleni 820 feasibility and review.
Presentation to the Portfolio Committee on Human Settlements A progress report on Cooperative housing initiatives.
Droitwich South Ward Meeting Yew Tree Development Community Hall 29 th June 2011 Facilitated by Cllr Richard Morris Neil Pearce, Development Manager Andrew.
MODERN VENTURES (Pty)Ltd t/a NORTHERN GATEWAY CITY PORTION 2 OF 36-NQ
Planning Legislation – Prof. H. Alshuwaikhat ZONING Zoning is the division of a municipality, city or town into districts for the purpose of regulating.
Public Meeting Agenda – September 13, 2007 Provide an Update on the Committee’s Work Discuss Emerging Vision for Redevelopment of Town-owned Property.
Land Use Plan Pilot Overview Land Use Planning Meeting Bingwi Neyaashi Anishinaabek First Nation August 11, 2011.
Chris Hani District Municipality INTSIKA YETHU LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation Nyanisweni 137 feasibility and review.
Chris Hani District Municipality EMALAHLENI LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation DORDRECHT 800 feasibility and review of.
Settlement Boundaries Where do they come from? What do they do? What is the future?
Wyong Local Environmental Plan (LEP) 2013 Kathryn Heintz Senior Strategic Planner, Strategic Development.
Development Management Objective to promote proper planning and sustainable development and adopt a pro-active approach towards development that accords.
Community Development Department GRAND HAVEN DEVELOPMENT OF REGIONAL IMPACT City Council June 3, 2014.
Amathole District Municipality AMAHLATHI LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation DALIWE 900 feasibility and review of housing.
Planning for Smart Growth in Rural New Hampshire SWRPC Southwest Region Planning Commission.
Chris Hani District Municipality LUKHANJI LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation EZIBELENI INFORMAL SETTLEMENT 200 feasibility.
Phase 1 Consultation Results 23 rd September 2014.
Amathole District Municipality NGQUSHWA LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation HAMBURG 500 feasibility and review of housing.
Feasibility Study GREAT KEI 6000 November 2013 PRELIMINARY DRAFT not for circulation.
BASICS IN IRRIGATION ENGINEERING 2.1. Planning Irrigation systems 2.2. soil-plant-water relation – over view 2.3. Crop water requirement 2.4. Base, delta.
Chris Hani District Municipality LUKHANJI LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation KOMANI PARK CRU feasibility and review of.
Community Development Department GRAND HAVEN DEVELOPMENT OF REGIONAL IMPACT Planning & Land Development Regulation Board May 21, 2014.
Chris Hani District Municipality INTSIKA YETHU LOCAL MUNICIPALITY April 2014 PRELIMINARY DRAFT not for circulation JOE SLOVO 137 feasibility and review.
Amherst County Comprehensive Plan (Update)
The SSMP Process 1. The Servicing and Settlement Master Plan A plan to encompass the community’s visions and ideas, while approaching planning and servicing.
Amathole District Municipality NGQUSHWA LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation GERMAN VILLAGE 360 feasibility and review of.
Planning for the future of our district Core strategy options Presentation to C4B Associates February 2010.
Amathole District Municipality NKONKOBE LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation MSOBOMVU 500 feasibility and review of housing.
Amathole District Municipality NXUBA LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation KUWAIT 100 feasibility and review of housing plan.
Amathole District Municipality NXUBA LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation SOMERSET DRIVE 200 feasibility and review of housing.
DEPARTMENT: RURAL DEVELOPMENT & LAND REFORM LAND AUDIT REPORT PRESENTATION TO THE PORTFOLIO COMMITTEE ON RURAL DEVELOPMENT AND LAND REFORM 23 OCTOBER 2013.
Amathole District Municipality NXUBA LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation SIZAKELE 400 feasibility and review of housing.
Chris Hani District Municipality ENGCOBO LOCAL MUNICIPALITY April 2014 PRELIMINARY DRAFT not for circulation NGCOBO MIDDLE INCOME 500 feasibility and review.
Amathole District Municipality AMAHLATHI LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation MLUNGISI 2500 feasibility and review of housing.
Amathole District Municipality INXUBA YETHEMBA LOCAL MUNICIPALITY April 2014 PRELIMINARY DRAFT not for circulation MIDDELBURG MIDDLE INCOME 200 feasibility.
Rental Housing Response to the Recommendations of the FFC on Rental Housing National Department of Housing 7 August 2009.
Chris Hani District Municipality EMALAHLENI LOCAL MUNICIPALITY April 2014 PRELIMINARY DRAFT not for circulation LADY FRERE 800 feasibility and review of.
Amathole District Municipality NGQUSHWA LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation GLENMORE 1000 feasibility and review of housing.
EASTSIDE ACTIVITY CENTER DRAFT MASTER PLAN Board of County Commissioners January 22, 2008.
Chris Hani District Municipality INTSIKA YETHU LOCAL MUNICIPALITY April 2014 PRELIMINARY DRAFT not for circulation MAHLUBINI 348 feasibility and review.
Chris Hani District Municipality INTSIKA YETHU LOCAL MUNICIPALITY April 2014 PRELIMINARY DRAFT not for circulation TSOMO EXT 3 (250) feasibility and review.
Amathole District Municipality MNQUMA LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation MNGCWE 500 feasibility and review of housing.
Amathole District Municipality NGQUSHWA LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation GCINISA 500 feasibility and review of housing.
Waterdown Road Corridor Class Environmental Assessment (Phase 3 & 4) Community Services Committee May 9, 2012.
Amathole District Municipality GREAT KEI LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation TAINTON 350 feasibility and review of housing.
STAMFORD CAPACITY AND LIMITS TO GROWTH STUDY SOUTH KESTEVEN DISTRICT COUNCIL FINAL REPORT PRESENTATION PRESENTERS: UNA McGAUGHRIN JESSE HONEY 14 TH DECEMBER.
Mandeni Municipality Multi Year Housing Plan To house every resident of Mandeni in a sustainable and affordable way, with the necessary services, in progressive.
Neighbourhood Planning in Haringey Myddleton Road Strategic Group 7 th November 2013.
Amathole District Municipality NKONKOBE LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation BALFOUR 600 feasibility and review of housing.
PRELIMINARY DRAFT not for circulation
AGENDA The current focus on housing Do we need older people’s housing? The role of planning? National Level Local Level Opportunities to influence Planning.
PRELIMINARY DRAFT not for circulation
PRELIMINARY DRAFT not for circulation
PRELIMINARY DRAFT not for circulation
PRELIMINARY DRAFT not for circulation
PRELIMINARY DRAFT not for circulation
PRELIMINARY DRAFT not for circulation
Architectural Drafting
PRELIMINARY DRAFT not for circulation
Agricultural land reserve exclusion application
PRELIMINARY DRAFT not for circulation
PRELIMINARY DRAFT not for circulation
PRELIMINARY DRAFT not for circulation
Official Plan and Zoning By-law Amendment Application
PRELIMINARY DRAFT not for circulation
PRELIMINARY DRAFT not for circulation
PRELIMINARY DRAFT not for circulation
Presentation transcript:

Amathole District Municipality NKONKOBE LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation HOGSBACK 300 feasibility and review of housing plan for HOGSBACK 300

Feasibility and Review of Housing Plan HOGSBACK 300 March 2014 by prepared for CNdV africa (Pty) Ltd environmental planning, urban design, landscape architecture 17 New Church Street Cape Town 8000 Tel: Fax: Kantey & Templer PO Box Beacon Bay, 5205 Tel: IQ Vision 110 Sarel Cillier Street Strand 7140 Tel: EASTERN CAPE DEPARTMENT OF HUMAN SETTLEMENTS Phillip Frame Road Chiselhurst Tel: +27 (0) NKONKOBE LOCAL MUNICIPALITY Private Bag X31008, Cambridge, 5206 Tel: (043) Fax: (043)

HOGSBACK 300 FEASIBILITY STUDY CNdV africa (Pty) Ltd25 August 2015 page 5 CONTENTS 2.1INTRODUCTION 2.1.2Purpose of the Report 2.1.2Background of this Report 2.1.3Terms of Reference 2.1.4Background to Settlement 2.2Status of Housing Project and Waiting List 2.3Land Identification and Ownership 2.4Engineering 2.5Environment 2.6Geo-tech 2.7Distribution of Social Facilities 2.8Current Spatial Development Framework 2.9Future Plans of Other Sector Departments 2.10Approval by Council 2.11Summary and Recommendations LIST OF FIGURES Figure 2.1.1Locality Plan Figure 2.1.2Aerial Photograph Figure 2.1.3Visual Survey Figure 2.2.1Statistical Background Figure 2.3.1Extent of General Plan Figure 2.4.1Engineering Figure 2.5.1Environment Figure 2.6.1Geo-tech Figure 2.7.1Distribution of Social Facilities Figure 2.8.1Current Spatial Development Framework LIST OF ANNEXURES Annexure 1 Ownership Annexure 2Title Deed Annexure 3Surveyor General diagram

HOGSBACK 300 FEASIBILITY STUDY CNdV africa (Pty) Ltd25 August 2015 page 6 CONTENTS GLOSSARY Informal Site : A Site occupied by a household or to which a household has customary rights, e.g. Permission to occupy (PTO, no longer formally in use) or community agreement via a meeting of elders including headman or chief. Formal Site : A site occupied by a household or to which a household is entitled to have a registered right recorded at the Deeds Registry with a title deed and surveyors diagram and/or registered General Plan. However, in many instances title deeds have not been issued nor ownership registered. In-Situ upgrade project : Formalising of tenure and installation of services and possibly also construction of a subsidised dwelling on land on which people are already living. Generally refers to a project larger than one unit. Greenfields project : New project site which there has been no formal or informal settlement, industry, infrastructure to date. Project sites are often outside of existing urban development. Infill Project : New project site within existing urban development usually on under utilised or vacant land and which often can help to promote physical integration between spatially isolated parts of the settlement. Rectification projects : Repair or rebuilding of defective existing houses built through one or other government housing program. Erven : The plural of ‘erf’ meaning plots of land each registered as an ‘erf’ in a deeds registry and forming part of a registered General Plan. Plots : The plural of ‘plot’ meaning unregistered pieces of land informally laid out. Portion: A plot of land forming part of a proposed or approved (by LM Council) subdivision layout but which has not yet been registered by the Surveyor General as a general plan and for which erf numbers have not yet been registered. ACRONYMS BLMCBiodiversity Land Management Class CBACritical Biodiversity Area ECBCPEastern Cape Biodiversity Conservation Plan ECDHSEastern Cape Department of Human Settlement EIAEnvironmental Impact Assessment GPGeneral Plan HSPHuman Settlement Plan LMLocal Municipality MHSPMunicipal Human Settlement Plan SA South Africa SANBISouth African National Biodiversity Institute SDFSpatial Development Framework

HOGSBACK 300 FEASIBILITY STUDY CNdV africa (Pty) Ltd25 August 2015 page 8 INTRODUCTION PURPOSE OF THE REPORT The purpose of this report is to describe the key elements to be taken into account when assessing the feasibility of Hogsback 300 as a Human Settlement Project and to recommend whether it should be approved or not BACKGROUND TO THIS REPORT This report is one of five Human Settlement Project feasibility reports for Nkonkobe Municipality. It is designed so that it can be part of a single document that includes the other four projects TERMS OF REFERENCE (Part C.3 Scope of work Tender No. SCMU11-12/13-A0240) The project terms of reference for the feasibility report are summarised as follows: Ascertain the feasibility of the project within each MHSP. The study shall reveal the developmental opportunities and constraints in relation to: 1.Determination of housing demand and potential beneficiary status 2.Land identification and ownership 3.Availability of bulk services and confirmation of capacity 4.Environmental conditions; 5.Geo-technical conditions 6.Alignment with Municipal Spatial Planning 7.Visual survey (area visits) 8.Future development plans of other sector departments 9.Provision of recommendation and proposals to ECDHS 2.1.4BACKGROUND TO SETTLEMENT Registered Owner:Nkonkobe Municipality (see Annexure 1) Property Description: Farm 182, Stockenstroom Title Deed Number:T1111/2002 (see, Annexure 2) Servitudes: Yes Site Size: Approximately 7.1 Ha The Hogsback 300 site represents the first opportunity for residents in the general area of Hogsback who are not property owners to achieve security of tenure. These residents had always lived in staff quarters on the various privately owned smallholdings and plots. Hogsback is situated on the slopes of the Amathole Mountains overlooking dominant ridges said to resemble the hog’s back, a type of rock formation. It is at the north east corner of the Eastern Cape in Nkonkobe Municipality. The settlement is 35 km north of Alice and 44km south of Cathcart on the R345. Nearby towns include Seymour in to the west and Keiskammahoek to the east. Hogsback is surrounded by large tracts of indigenous protected forests and is a popular tourist destination which is famous for its hiking trails, campsites and holiday resorts. The required size of the plots and what they are to be used for will require confirmation, e.g. to accommodate food gardening etc. Current plots appear to be 50m x 50m, i.e. a typical rural plot size of 2000m² to 2500m². 50 plots of this size could be accommodated on ±15 hectares which would require a larger site than that demarcated on figure

HOGSBACK 300 FEASIBILITY STUDY CNdV africa (Pty) Ltd25 August 2015 page 9 Locality Plan Figure 2.1.1

HOGSBACK 300 FEASIBILITY STUDY CNdV africa (Pty) Ltd25 August 2015 page 10 Aerial Photograph Figure 2.1.2

HOGSBACK 300 FEASIBILITY STUDY CNdV africa (Pty) Ltd25 August 2015 page 11 VISUAL SURVEY Figure a. The main road through Hogsback town (± 5km from site)b. Access to the site at junction on R345 to Cathcartc. View of the site from access point. d. Existing wattle and daub structure on sitee. View of existing wattle and daub structuresf. View from the northern slopes of the site facing the western boundary. g. Example of wattle and daub structures with some under construction.h. View of the site from the main road I. Wattle and daub structures further west from the main road.

HOGSBACK 300 FEASIBILITY STUDY CNdV africa (Pty) Ltd25 August 2015 page 12

HOGSBACK 300 FEASIBILITY STUDY CNdV africa (Pty) Ltd25 August 2015 page 13 STATUS OF HOUSING PROJECTS AND WAITING LISTS 2.2 Many of the owners do not live permanently on their properties. The current permanent population of Hogsback is approximately 1000 people most of whom have resided on their employers’ properties for generations. The proposed project is intended to provide an opportunity for secure tenure for those wishing to take this opportunity. This suggests that the number of beneficiary households could be in the region of RDP subsidies have been proposed for Hogsback. The proposed housing delivery strategy and housing instrument is a project linked subsidy onto an existing informal settlement. There are currently approximately 50 informal mud structures and shacks on Farm 183 Hogsback. This property was donated to the municipality by private owners for the purposes of providing a new settlement for low cost housing beneficiaries. The application for 300 subsidies initially applied for by Amathole District Municipality on behalf of Nkonkobe Municipality was objected to by neighbouring property owners citing concerns of a fire risk brought about by the proposed project. A density of 10du/ha (600m² plots) will require 30 hectares. At 3du/ha (2000m²) 100 hectares will be required. However, the neighbouring property owners recommend that the proposed project comprises no more than 50 residential units. This would require 5 hectares at 10du/ha and approximately 17 hectares at 3du/ha. A Commission of Enquiry has been set up by the Eastern Cape Office of the Premier that recommends a fire risk assessment be undertaken and attached to findings of the enquiry. The municipality is awaiting the Commission’s report and recommendations prior to proceeding with the project. The waiting lists for Hogsback has been verified and a total of 261 beneficiaries have been identified. HOGSBACK 300 Population (Nkonkobe SDF 2010) Not specified Population (2011 Census) 1029 (Hogsback) Ex. Units (2011 Census) Not specified No. Households (at 4/hh) 344 Proposed Subsidies (EC DHS) 300 Waiting List (Nxuba LM) 261 still to be verified Figure 2.2.1Statistical Background

HOGSBACK 300 FEASIBILITY STUDY CNdV africa (Pty) Ltd25 August 2015 page 14 LAND IDENTIFICATION AND OWNERSHIP 2.3 The land on which the site is located is a portion of remainder Farm 182, Stockenstroom. It has been donated to Nkonkobe Municipality by private owners. (see Fig and annexure - ownership) However, the exact status of this transaction needs to be confirmed. A General Plan has not been drawn up for the site however it is reflected as remainder lot F on the General Plan for Hogsback Township, S.G No. 5228/52. The land has been occupied by approximately 50 households who will benefit form the proposed Human Settlement Project.

HOGSBACK 300 FEASIBILITY STUDY CNdV africa (Pty) Ltd25 August 2015 page 15 Cadastral Layout Figure 2.3.1

HOGSBACK 300 FEASIBILITY STUDY CNdV africa (Pty) Ltd25 August 2015 page 16 ENGINEERING (Kantey and Templer) 2.4 BULK SERVICES Existing Services.... INTERNAL SERVICES Existing Services.... GEOTECHNICAL CONDITIONS.... EXISTING INTERNAL SERVICES ARE ADEQUATE AND REQUIRE NO UPGRADING Await K&T TOP STRUCTURE.... TRAFFIC IMPACT ASSESSMENT... ROADS AND ACCESSIBILITY... THE PROJECT IS FEASIBLE FOR DEVELOPMENT OF HUMAN SETTLEMENTS.

HOGSBACK 300 FEASIBILITY STUDY CNdV africa (Pty) Ltd25 August 2015 page 17 Engineering (Kantey and Templer) Figure Await K&T

HOGSBACK 300 FEASIBILITY STUDY CNdV africa (Pty) Ltd25 August 2015 page 18 ENVIRONMENT 2.5 The Eastern Cape Biodiversity Plan (ECBCP), 2007 has developed four terrestrial Biodiversity Land Management Classes (BLMCs) according to the terrestrial Critical Biodiversity Areas (CBAs). Each BLMC sets out the desired ecological state that the area should be kept in to ensure biodiversity persistence. A very small portion on the north-east corner of the site falls within CBA 2 as per SANBI data (2007) and therefore is subject to BLMC 2 guidelines according to the ECBCP If necessary, this must be ground-truthed by a botanist, prior commencing with the Human Settlement Project. BLMC 2 permits the land to be used for Conservation, Game Farming and Communal Livestock. Settlements are not recommended for these areas. The site slopes south towards the Cathcart, Seymour road along its southern boundary and appears to have no Critical Biodiversity Areas. All vegetation on the site falls under the least threatened category. There are some localised wet areas – puddles, but generally the area appears well-drained and there are no watercourses or wetlands nearby. The community has been living on the site for approximately three years and did not report problematic watercourses or wetlands. The northern part of the site abuts a formal protected area, see fig The site is on formerly cultivated land and will have little impact on natural vegetation. It would appear the proposed project (activity) will trigger the NEMA EIA Regulations, namely listed activity no. 23 as identified in the Government Notice No. R. 544 (Listing Notice 1): –The transformation of undeveloped, vacant or derelict land to: (i)residential, retail, commercial, recreational, industrial or institutional use, inside an urban area, and where the total area to be transformed is 5 hectares or more, but less than 20 hectares, or (ii)residential, retail, commercial, recreational, industrial or institutional use, outside an urban area and where the total area to be transformed is bigger than 1 hectare but less than 20 hectares; Except where such transformation takes place: (i)for linear activities; or (ii) for purposes of agriculture or afforestation, in which case Activity 16 of Notice No. R. 545 applies. However, it may be possible to obtain a letter from the environmental authorities agreeing that the site has already been transformed and that, therefore, an EIA is not required.

HOGSBACK 300 FEASIBILITY STUDY CNdV africa (Pty) Ltd25 August 2015 page 19 Environment Figure 2.5.1

HOGSBACK 300 FEASIBILITY STUDY CNdV africa (Pty) Ltd25 August 2015 page 20 GEO-TECH (Kantey and Templer) 2.6 In terms of the geotechnical information available the following is extended from a report by Outeniqua Geotechnical Services cc, Some potential geotechnical constraints have been identified for further investigation which may have an impact on the extent of the developable land and/or the development costs. The recommended typical foundations for subsidy housing are conventional strip foundations or light rafts to cater for variations in soil profile and minor soil movements. On sloping terrain, some earthworks and retaining walls may be required to create level platforms for houses and this can have significant cost implications. Foundations should be placed on well compacted natural soil, engineered fill or rock. Founding conditions will have to be inspected by the engineer to confirm suitable soil conditions with adequate bearing capacity and to check for any seepage or groundwater problems. Preliminary and Phase 1 geotechnical site investigations are required to obtain a more accurate evaluation of the development potential of each site, but the initial indications are that the geology is unlikely to pose a significant threat to the further development of these areas.

HOGSBACK 300 FEASIBILITY STUDY CNdV africa (Pty) Ltd25 August 2015 page 21 Geo-tech (Kantey and Templer) Figure The Site

HOGSBACK 300 FEASIBILITY STUDY CNdV africa (Pty) Ltd25 August 2015 page 22 DISTRIBUTION OF SOCIAL FACILITIES 2.7 There is only one local primary school in Hogsback located in the village approximately 5 - 6km from the site, see fig The Police Station is located as the entrance to Hogsback of the R345 from Alice approximately 5 – 6km from the site. (off map) The local clinic is also situated in town about 5 - 6km from the site. (off map) Retail shops are most common facility in Hogsback. These shops are also located in the village centre. Residents not owning cars would need to travel by means of public transport or non-motorised transport to access the required facilities in town. Should a project of 300 households, approximately 1000 people, be developed on the site this should take the form of a fully fledged rural village with commercial opportunities at the junction on the R345. Consideration will have to be given to either providing a new primary school in due course on the site or ensuring there are adequate public and non motorised transport (cycle lanes and pedestrian sidewalks) to enable pupils to commute to the current school. Careful consideration should be given to ensuring that the settlement is as viable as possible and does not become a marginal dormitory suburb of Hogsback.

HOGSBACK 300 FEASIBILITY STUDY CNdV africa (Pty) Ltd25 August 2015 page 23 Distribution of Social Facilities Figure 2.7.1

HOGSBACK 300 FEASIBILITY STUDY CNdV africa (Pty) Ltd25 August 2015 page 24 CURRENT SPATIAL DEVELOPMENT FRAMEWORK 2.8 The Hogsback 300 site is a village envisaged as settlement Zone B for densification and formalization according to Nkonkobe Spatial Development Framework. (Nkonkobe SDF 2013, page 73) However, the Plaaitjieskraal Farm has been identified for the settlement of landless people and commonage purposes. (Nkonkobe SDF 2013, page 74) In terms of the SDF this project should be developed as a Model 1 settlement, i.e. plots larger than 1000m² to be used for agricultural purposes (see page 16). This is the only way that settlement on a site so remote from the nearest urban centre (5kms) can be justified. Otherwise, an urban village or suburb should be located within 1km of employment and economic opportunities in terms of various policy and legislation. The current Spatial Development Framework specifies broad land use management guidelines and does not specific spatial proposals for Hogsback. The proposed Human Settlement Project is in line with the SDF.

HOGSBACK 300 FEASIBILITY STUDY CNdV africa (Pty) Ltd25 August 2015 page 25 Current Spatial Development Framework Figure The Site source: Nkonkobe Local Municipality, 2010)

HOGSBACK 300 FEASIBILITY STUDY CNdV africa (Pty) Ltd25 August 2015 page 26 FUTURE PLANS OF OTHER SECTOR DEPARTMENTS 2.9 The following table indicates future plans of other sector departments proposed in the various settlements as contained in the IDP

HOGSBACK 300 FEASIBILITY STUDY CNdV africa (Pty) Ltd25 August 2015 page 27 APPROVAL BY COUNCIL 2.10 Awaiting Council Resolution

HOGSBACK 300 FEASIBILITY STUDY CNdV africa (Pty) Ltd25 August 2015 page 28 SUMMARY AND RECOMMENDATIONS SUMMARY The site was inspected on 24/10/2013 and the conclusions below ground-truthed. The project comprises of 300 proposed housing subsidy units onto an in- situ site The land on which the site is located, Ptn of Rem Farm 182, was donated to Nkonkobe Municipality by private owners. (see Fig 14.1 and annexure - ownership) There are adequate engineering services. (to be confirmed by K&T) It is likely that these will have to be off-grid. Environmental concerns affecting the proposed Human Settlement Project include a fire risk. A report is awaited on this. Using ECBCP guidelines in determining the BLMCs that apply to the CBA that covers a very small portion of the site, settlements are not recommended for theses areas. It is recommended that if necessary, the site be assessed by a Botanist to verify and ground-truth the CBA nature of the site prior to commencing with the Human Settlement Project. The proposed project will trigger the NEMA EIA Regulations, namely listed activity no. 23 (see section 2.5) as identified in the Government Notice No. R. 544 (Listing Notice 1) unless a letter of exemption can be obtained from the relevant environmental authorisation body. A detailed geo-technical site visit inspection and, if necessary, survey will not be required prior to the project commencing. There are no new social facilities required to support the proposed human settlements project, however public transport and non- motorised transport facilities, e.g. cycleways, is necessary to enable residents to access facilities in town. The Human Settlement Project is in line with the SDF. The project should be developed as a Model 1 agricultural settlement (plots >1000m²) in terms of the SDF (p 80) to justify its remote location. This will enable a lend of self sufficiency and food security to be achieved by providing enough gardening space RECOMMENDATIONS In light of this assessment it is recommended that pending the outcome of the fire risk assessment and recommendations of the Commission of Enquiry the award of subsidies can proceed in Hogsback as the land is generally suitable. A layout based on 1000m² plots or larger, e.g. traditional betterment scheme garden plots of 2000m² m² should be prepared. Agreement must still be reached on the area of land required for the settlement. This will be a function of the number of the verified beneficiary list and the desired plot configuration. Consideration must also be given to whether it will be more viable to provide social facilities at the site or create convenient and safe public transport and non-motorised transport links to the existing facilities. The settlement should be developed as a true eco-village with off-grid services and financial and technical support that promotes the use of green building materials in construction as the current residents are already doing but unsupported. The ad-hoc construction of conventional RDP houses using conventional imported building materials should be avoided. The Umzi choice pilot project strategy should be considered here to help the non – shelter requirements such as agricultural and business facilities.

HOGSBACK 300 FEASIBILITY STUDY CNdV africa (Pty) Ltd25 August 2015 page 29 ANNEXURE 1: OWNERSHIP PRINTOUT

HOGSBACK 300 FEASIBILITY STUDY CNdV africa (Pty) Ltd25 August 2015 page 30

HOGSBACK 300 FEASIBILITY STUDY CNdV africa (Pty) Ltd25 August 2015 page 31 ANNEXURE 2: TITLE DEED

HOGSBACK 300 FEASIBILITY STUDY CNdV africa (Pty) Ltd25 August 2015 page 32

HOGSBACK 300 FEASIBILITY STUDY CNdV africa (Pty) Ltd25 August 2015 page 33 ANNEXURE 3: SURVEYOR GENERAL DIAGRAM

HOGSBACK 300 FEASIBILITY STUDY CNdV africa (Pty) Ltd25 August 2015 page 34